Ship Request

STR Management has moved to MFP

The US Academic Research Fleet is moving to Marine Facilities Planning (MFP) for scheduling initially and eventually cruise planning.

For all NEW or RESUBMITTED Projects/Ship Time Requests, go to https://mfp.us and create a new SME. Some STRs for projects starting in 2022 and beyond have already been moved to Marine Facilities Planning (mfp.us). Check your MFP Science Portal for any projects that might already be moved. If you need to make edits to projects that begin in 2022 and beyond, please contact mfp@unols.org for assistance. Be sure to indicate the Project and STR IDs that you would like to edit. For more information on getting into MFP, see the More Information button below.

  MARUM - M3  -  2021  -  Thomas G. Thompson  
  Project Information  
Project Title: Sonar Monitoring of Natural Release of Methane Greenhouse Gas from the Seafloor-A Contribution to the Understanding of Global Change Project Status: Submitted
Principal Investigator: Deborah S. Kelley, UW Project Institution: UW
Project ID: 106777 Version #: 1
Date Submitted: 2/13/2020 6:27:00 PM Created By: Deborah S. Kelley
Date Last Modified: 2/13/2020 6:27:00 PM URI Serial #: None
Funding Agencies: OTHER - A127457 - Funded
Summary of Field Work: It is anticipated that some component of the two MARUM multibeam sonars, a 4K camera and a CTD currently installed at Southern Hydrate Ridge on the OOI Regional Cabled Observatory (RCA) will be cleaned/turned (e.g. the CTD). This award will be extended to 2022.
Summary of Facility Requirements: This effort requires 1 day of field work added onto the 2021 RCA annual field program using the ROV Jason.
Summary of other requirements and comments:  
Ship Request Identification
Type of Request: Primary Ship Use Request Status: Submitted
Request ID: 1010989 Created By: Deborah S. Kelley
Date Last Modified: 2/13/2020 6:27:00 PM Date Submitted: 2/13/2020 6:27:00 PM
Requested Ship, Operating Days and Dates
Year: 2021 Ship/Facility: Thomas G. Thompson
Optimum Start Date: 7/6/2021 Dates to Avoid: Avoid dates prior to June and after September due to poor
weather conditions and likely loss of ROV dives, puts the maintenance program
at risk
 
 
Earliest Start Date: 6/23/2021 Multi-Ship Op: No
Latest Start Date: 7/15/2021 Other Ship(s):

Operating Days Needed: Science Days Mob Days De-Mob Days Estimated Transit Days Total Days
1 0 0 0 1
Repeating Cruise?
(within same year)
No Interval:   # of Cruises:  

Description of Repeating cruise requirements:
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations:
Work Area for Cruise
Short Description of Op Area
for use in schedules:
Hydrate Ridge
Description of Op Area:
Op Area Size/Dia.:  
 
  Lat/Long Marsden Grid Navy Op Area
Beginning
44.216667° N / 125.133333° W map
157 map
NP09 map
Ending
44.2° N / 125.133333° W map
157 map
NP09 map
  Show Degrees Minutes    
Foreign Clearance and Permitting Requirements
Foreign Clearance Required? No Coastal States:

NONE
 Important Info on Foreign Research Clearances  

Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
No If yes, have you applied for the necessary permits through your export control office? No
 Questions about ITAR/EAR regulations?

Comments about foreign clearance requirements or
description of any other special permitting requirements
(e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.)
None needed
Port Calls
Requested Start Port Intermediate Port(s) Requested End Port
Newport, OR, USA None Newport, OR, USA
Explanation/justification for requested
ports and dates of intermediate stops
or to list additional port stops
Newport is the preferred port for Regional Cabled Array work as it is closest to the work sites (i.e. only ~ 5 hr steam to Southern Hydrate Ridge)

 Important Info on Working in Foreign Ports

 
Science Party
Chief Scientist: Deborah S. Kelley, UW
# in Science Party 36 # of different science teams 3 # Marine Technicians to be
provided by ship operator:
(include in science party total)
2
Explanation of Science Party Requirements and Technician Requirements This cruise will include the RCA team, the ROV Jason
team and representatives from MARUM ( 2 participants)
Instrumentation Requirements That Impact Scheduling Decisions
Selected Dynamic PositioningSelected ADCPSelected MultibeamUnselected Seismic
Unselected Dredging/Coring/Large Dia. Trawl WireSelected Stern A-frameUnselected Fiber Optic (.681)Unselected 0.680 Coax Wire
Unselected SCUBA DivingUnselected Radioisotope use - briefly describeUnselected NO Radioisotope use/Natural level workUnselected Other Operator Provided Inst. - Describe
0 PI-Provided Vans - briefly describe Unselected MOCNESS  
Explain Instrumentation or Capability
requirements that could affect choice
of ship in scheduling.

The ROV Jason is required to turn RCA
infrastructure (e.g. latch into heavy packages, plug/unplug wet mate
connectors etc).

Major Ancillary Facilities (that require coordination of schedules with ship schedule)
Aircraft
Unselected Helicopter Ops (USCG)Unselected Twin OtterUnselected Unmanned Aerial Systems (UAS) 
Autonomous Underwater Vehicle (AUV)
Unselected Other AUVUnselected Sentry  
Coring Facility
Unselected Jumbo Piston CoringUnselected Large Gravity Core Unselected MC800 multicorer w/ MISO camera/telemetryUnselected OSU Coring Facility (MARSSAM)
Unselected Other Large Coring FacilityUnselected WHOI Long Core  
Human Occupied Vehicle (HOV)
Unselected AlvinUnselected Clelia (HBOI)Unselected JSL I & II (HBOI)Unselected Other HOV
Other Facility
Unselected MISO Facility - deep-sea imagingUnselected Other FacilityUnselected Potential Fields Pool Equipment 
Remotely Operated Vehicle (ROV)
Selected JasonUnselected Other ROV  
Seismic Facility
Unselected Ocean Bottom Seismograph Instrument Center (OBSIC)Unselected Ocean Bottom Seismograph Instrument Pool (OBSIP)Unselected Ocean-Bottom Seismometer Program (UTIG)Unselected Other Seismic/OBS Facility
Unselected PASSCALUnselected Portable MCS groupUnselected Portable MCS/SCS groupUnselected U.S. Geological Survey Ocean Bottom Seismometer Facility (USGS at WHOI)
Towed Underwater Vehicle
Unselected ARGO IIUnselected Hawaii MR1 (HMRG)Unselected IMI12 (HMRG)Unselected IMI120 (HMRG - formerly DSL 120A)
Unselected IMI30 (HMRG)Unselected Other Towed Underwater VehicleUnselected Towfish 
UNOLS Van Pool
Unselected AUV Lab Van #1Unselected Clean Lab VanUnselected Cold Lab VanUnselected General Purpose Lab Van
Unselected Radioisotope Lab VanUnselected Wet Lab Van  
UNOLS Winch Pool
Unselected Mooring SpoolerUnselected Portable WinchUnselected Turn Table 
Explain Major Ancillary Facilities
Requirements and list description
and provider for "other" systems.
Jason is required for recovery and installation of the MARUM equipment including the Jason latching underbelly.

Expand request schedules  Associated Schedules

Expand request history Ship Request History