Welcome to the new home of The Ship Time Request System
Please submit a help request if you experience any issues.

View Schedule

or schedule as:
the schedule as:
  2020 - Thomas G. Thompson  
Dever/Chadwell/Kelley/Nooner
Secure - ID #14263    Version #3 - 7/12/2020

Scheduling Contact(s)
Robert Kamphaus kamphaus*%*%*uw^%^%^edu (206) 685-5672

  Notes:   2020 US Academic Research Fleet vessel schedules are subject to change as the COVID-19 pandemic evolves. Scheduled cruise Chief Scientists are urged to keep in close contact with the vessel operators to remain aware of any updates/changes.

First version of published schedule for 2020.
11/21/2019 - updated cruise numbers; cleaned up schedule
12/23/2019 - updated MSR application status and added Madagascar for TN-376
12/28/2019 - updated funding status for 2 NSF engineering dive days.
01/03/2020 - MSR status updated; adjusted days for IDL crossings
1/23/2020 - updated arrival date from TN-375; added 2 days for UW on Transit from SD (TN-380); removed 3 from TN-382.
2/6/2020 - Updated Durban repair schedule plan
3/24/2020 - TN-378 (Beinart) postponed due to 30 day pause. Port call in Sydney, Australia instead of Fiji. Transit to Honolulu, HI
3/25/2020 - TN-379 (Resing) postponed due to COVID-19.
4/22/2020 Rescheduling of priority cruises per UNOLS recommendation email 4/10/2020 and the revised REVELLE availability of 10/4.
5/11 Defer A. Gartman to 2021
5/21 Add two Sentry dives to Nooner/Webb/Butterfield
5/29 Split out OOI Endeavor into 3 preliminary legs.
Removed Butterfield NOPP spectrometer 3 days NOAA-OE from Chadwick cruise.
6/4 Split Kelley OOI into two legs, revise number of days and funding sources.
6/9 Reduce OOI-Kelley Jason load out funding obligation to 1 day.
6/21 added cruise numbers for TN-379 to TN-381.
7/11 - updated Drydock period dates (10/7 to 12/11) per contract.
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jan 2020
Dep:01 Jan 2020
Arr:05 Jan 2020
Unload:07 Jan 2020
 
Walvisbaai, Namibia
Cape Town, South Africa
 
Walvis Ridge/
SA02
SA02
 
 
 
27S/5E
29S/3E
 
  William W. Sager
  5/7

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Walvis Ridge Geophys William W. Sager/UHouston 1832197 7/NSF-OCE-MGG/F
 
Notes: TN-374 (continued)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:08 Jan 2020
Dep:09 Jan 2020
Arr:19 Jan 2020
Unload:19 Jan 2020
 
Cape Town, South Africa
Cape Town, South Africa
 
South Atlantic/
SA04
SA04
 
 
 
34S/18E
34S/18E
 
  Charles Eriksen
  11/12

Clearances: South Africa(A)
 
Project PI/Institution Project # Days/Agency/Status
UW Sr Student Thesis Richard G. Keil/UW Not Specified 12/INST-UW/F
 
Notes: TN-375; South Africa MSR submitted 8/11/2019; approved 12/20/2019. Arrival in port delayed until 1/19/2020 due to high winds on 1/18/2020; port was closed. Arrive and offload same day.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:20 Jan 2020
Dep:20 Jan 2020
Arr:21 Jan 2020
Unload:21 Jan 2020
 
Cape Town, South Africa
Cape Town, South Africa
 
Cape Town, SA/
SA04
SA04
 
 
 
34S/18E
34S/18E
 
  Robert Kamphaus
Inspection
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: USCG COI + ABS inspections (2 days) in Cape Town.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:22 Jan 2020
Dep:25 Jan 2020
Arr:10 Feb 2020
Unload:10 Feb 2020
 
Cape Town, South Africa
Durban, South Africa
 
S. Ocean/
IN06
IN06
 
 
 
37S/53E
37S/53E
 
  William M. Balch
  17/20

Clearances: France(A), South Africa(A)
 
Project PI/Institution Project # Days/Agency/Status
Conditioning SAMW William M. Balch/Bigelow 1735664 20/NSF-OCE-CO/F
 
Notes: TN-376. This the first of two Balch cruises. MSRs submitted SA: 6/25/2019, FR: 7/1/2019. Cruise interrupted by DG#3 engine coupling failure.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:11 Feb 2020
Dep:11 Feb 2020
Arr:12 Feb 2020
Unload:12 Feb 2020
 
Durban, South Africa
Durban, South Africa
 
South Africa/
IN03
IN03
 
 
 
30S/31E
30S/31E
 
  Robert Kamphaus
Overhaul or Repair
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Diesel Generator #3 flex coupling element replacement.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:13 Feb 2020
Dep:13 Feb 2020
Arr:03 Mar 2020
Unload:04 Mar 2020
 
Durban, South Africa
Port Louis, Mauritius
 
S. Ocean/
IN06
IN06
 
 
 
37S/53E
37S/53E
 
  William M. Balch
  20/21

Clearances: France(A), Madagascar(S), South Africa(A)
 
Project PI/Institution Project # Days/Agency/Status
Conditioning SAMW William M. Balch/Bigelow 1735664 21/NSF-OCE-CO/F
 
Notes: TN-376B. Balch cruise interrupted by DG#3 mechanical failure. Repair in Durban, South Africa.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:05 Mar 2020
Dep:05 Mar 2020
Arr:23 Mar 2020
Unload:24 Mar 2020
 
Port Louis, Mauritius
Sydney, Australia
 
S Indian Ocean/
IN03
SP05
 
 
 
20S/58E
34S/151W
 
  Robert Kamphaus
Transit Cruise
  19/20

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Reposit for Beinart Robert Kamphaus/UW Not Specified 15/NSF-OCE-BIO/F
Barter for OOI Richard G. Keil/UW Not Specified 5/INST-UW/F
 
Notes: TN-377. Divert to Sydney for fuel and provisions due to COVID-19. Fiji denied entry.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:25 Mar 2020
Dep:25 Mar 2020
Arr:08 Apr 2020
Unload:08 Apr 2020
 
Sydney, Australia
Honolulu, HI, USA
 
Pacific/
SP04
NP12
 
 
 
34S/151E
21N/158W
 
  Robert Kamphaus
Transit Cruise
  16/16

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Reposit to Hawaii Robert Kamphaus/UW Not Specified 16/NSF-OCE/F
 
Notes: TN-377B. Stop in Sydney was first schedule change due to COVID-19. Crossed IDL, gained a day.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 Apr 2020
Dep:09 Apr 2020
Arr:28 Apr 2020
Unload:28 Apr 2020
 
Honolulu, HI, USA
Honolulu, HI, USA
 
Pacific/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Robert Kamphaus
Standby Days
  20/20

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: COVID-19 20 day pause in Honolulu.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:29 Apr 2020
Dep:29 Apr 2020
Arr:08 May 2020
Unload:08 May 2020
 
Honolulu, HI, USA
Seattle, WA, USA
 
Pacific/
NP12
NP09
 
 
 
21N/158W
48N/122W
 
  Robert Kamphaus
Transit Cruise
  10/10

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 10/NSF-OCE/F
 
Notes: Notes: TN-378. Return transit to Seattle due to COVID-19.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 May 2020
Dep:09 May 2020
Arr:26 Jun 2020
Unload:26 Jun 2020
 
Seattle, WA, USA
Seattle, WA, USA
 
San Diego/
NP09
NP09
 
 
 
33N/117W
33N/117W
 
  Robert Kamphaus
Standby Days
  49/49

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: COVID-19 standby in Seattle, 49 days.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:27 Jun 2020
Dep:27 Jun 2020
Arr:29 Jun 2020
Unload:29 Jun 2020
 
Seattle, WA, USA
Newport, OR, USA
 
to Newport/
NP09
NP09
 
 
 
48N/122W
45N/124W
 
  Robert Kamphaus
Transit Cruise
  3/3

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Kelley2,Dever1 Not Specified 3/NSF-OOI-OOI/F
 
Notes: TN-379 Transit from Seattle, WA to Newport, OR.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 Jun 2020
Dep:30 Jun 2020
Arr:30 Jun 2020
Unload:30 Jun 2020
 
Newport, OR, USA
Newport, OR, USA
 
Newport/
NP09
NP09
 
 
 
46N/130W
46N/130W
 
  Robert Kamphaus
General Upkeep and Outfitting
  1/1

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jul 2020
Dep:03 Jul 2020
Arr:08 Jul 2020
Unload:08 Jul 2020
 
Newport, OR, USA
Newport, OR, USA
 
West Coast/
NP09
NP09
 
 
 
44N/124W
44N/124W
 
  Jonathan P. Fram
  6/8

Clearances: US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status
Endurance Array OM Edward P. Dever/OSU-CEOAS Not Specified 8/NSF-OOI-OOI/P
 
Notes: TN-380A. Estimated departure 1200, arrival 1800. This cruise will be a replacement for both 2020 spring and fall OOI Endurance. The yearly two cruise schedule will resume in 2021. Both OOI cruises require the OOI Heavy winch.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 Jul 2020
Dep:09 Jul 2020
Arr:11 Jul 2020
Unload:11 Jul 2020
 
Newport, OR, USA
Newport, OR, USA
 
West Coast/
NP09
NP09
 
 
 
44N/124W
44N/124W
 
  Jonathan P. Fram
  3/3

Clearances: US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status
Endurance Array OM Edward P. Dever/OSU-CEOAS Not Specified 3/NSF-OOI-OOI/P
 
Notes: TN-380B Estimated departure 1700, arrival 2000.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:12 Jul 2020
Dep:12 Jul 2020
Arr:16 Jul 2020
Unload:19 Jul 2020
 
Newport, OR, USA
Newport, OR, USA
 
West Coast/
NP09
NP09
 
 
 
44N/124W
44N/124W
 
  Jonathan P. Fram
  5/8

Clearances: US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status
Endurance Array OM Edward P. Dever/OSU-CEOAS Not Specified 8/NSF-OOI-OOI/P
 
Notes: TN-380C. Estimated departure 1830, arrival 1215. The cruise legs listed are preliminary and subject to weather. Two days listed as demob are weather contingency days. Cruise legs may require adjusting in real time.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:20 Jul 2020
Dep:24 Jul 2020
Arr:29 Jul 2020
Unload:29 Jul 2020
 
Newport, OR, USA
Newport, OR, USA
 
Coos Bay GPS-A/
NP09
NP09
 
 
 
44N/125W
44N/125W
 
  David Schmidt
  6/10

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Cascadia GPS-A C. D. Chadwell/SIO 1657961 6/NSF-OCE-MGG/F
JasonEngineering+mob Not Specified 3/NSF-OCE-IPS/F
Cabled Array Deborah S. Kelley/UW A101403 1/NSF-OOI-OOI/F
 
Notes: TN-381

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 Jul 2020
Dep:01 Aug 2020
Arr:13 Aug 2020
Unload:13 Aug 2020
 
Newport, OR, USA
Newport, OR, USA
 
Axial Seamount/
NP09
NP09
 
 
 
46N/130W
46N/130W
 
  Deborah S. Kelley
  13/15

Clearances: US EEZ(T)

Ancil Facs: Jason
 
Project PI/Institution Project # Days/Agency/Status
UW days in March* Robert Kamphaus/UW Not Specified 5/NSF-OCE-IPS/F
UW Contribution Robert Kamphaus/UW Not Specified 5/INST-UW/F
Cabled Array Deborah S. Kelley/UW A101403 5/NSF-OOI-OOI/F
Jason Not Specified 0/OTHER/P
 
Notes: Leg 1 *5 Days were charged to UW for the transit 5-24 March 2020.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Aug 2020
Dep:15 Aug 2020
Arr:26 Aug 2020
Unload:28 Aug 2020
 
Newport, OR, USA
Newport, OR, USA
 
Axial Seamount/
NP09
NP09
 
 
 
46N/130W
46N/130W
 
  Deborah S. Kelley
  12/15

Clearances: US EEZ(T)

Ancil Facs: Jason
 
Project PI/Institution Project # Days/Agency/Status
Cabled Array Deborah S. Kelley/UW A101403 12/NSF-OOI-OOI/F
M3 MARUM Deborah S. Kelley/UW A127457 1/OTHER/F
Phase 2 Enhancements William W. Chadwick/OSU_HMSC 1928282 1/NSF-OCE-MGG/F
Bio-electricity Clare E. Reimers/OS Not Specified 1/NAVY-ONR/F
Jason Not Specified 0/OTHER/F
 
Notes: Leg 2. *5 Days were charged to UW for the transit 5-24 March 2020.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:29 Aug 2020
Dep:29 Aug 2020
Arr:29 Aug 2020
Unload:29 Aug 2020
 
Newport, OR, USA
Newport, OR, USA
 
Newport/
NP09
NP09
 
 
 
46N/130W
46N/130W
 
  Robert Kamphaus
General Upkeep and Outfitting
  1/1

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Deep cleaning between science parties.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 Aug 2020
Dep:01 Sep 2020
Arr:20 Sep 2020
Unload:22 Sep 2020
 
Newport, OR, USA
Newport, OR, USA
 
Axial Seamount/
NP09
NP09
 
 
 
46N/130W
46N/130W
 
  William W. Chadwick
  20/24

Clearances: US EEZ(T)

Ancil Facs: Sentry, Jason
 
Project PI/Institution Project # Days/Agency/Status
Deformation at Axial Scott L. Nooner/UNCW 1736926 18/NSF-OCE-MGG/F
Axial Compliance Spahr C. Webb/LDEO 1924024 4/NSF-OCE-OTIC/F
Sentry Engineering Not Specified 2/NSF-OCE-IPS/F
Jason & Sentry Not Specified 0/OTHER/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:23 Sep 2020
Dep:23 Sep 2020
Arr:23 Sep 2020
Unload:23 Sep 2020
 
Newport, OR, USA
Newport, OR, USA
 
Newport/
NP09
NP09
 
 
 
46N/130W
46N/130W
 
  Robert Kamphaus
General Upkeep and Outfitting
  1/1

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Deep cleaning between science parties.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:24 Sep 2020
Dep:25 Sep 2020
Arr:02 Oct 2020
Unload:03 Oct 2020
 
Newport, OR, USA
Seattle, WA, USA
 
to home port/
NP09
NP09
 
 
 
45N/124W
48N/122W
 
  Robert Kamphaus
Transit Cruise
  8/10

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Cha Ba mooring Jan Newton/UW_APL Not Specified 7/INST-UW/P
Not Specified 3/NSF-OCE-IPS/F
 
Notes: Possibly two days transit, depending on departure/arrival time. Cha Ba mooring off La Push, WA and other Ocean Acidification work enroute.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:04 Oct 2020
Dep:04 Oct 2020
Arr:06 Oct 2020
Unload:06 Oct 2020
 
Seattle, WA, USA
Seattle, WA, USA
 
Pacific NW/
NP09
NP09
 
 
 
46N/124W
46N/124W
 
  Robert Kamphaus
Available for Service
  3/3

Clearances: NONE(T), US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Prepare for Drydock at UW Dock.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Oct 2020
Dep:07 Oct 2020
Arr:11 Dec 2020
Unload:11 Dec 2020
 
Seattle, WA, USA
Seattle, WA, USA
 
Pacific NW/
NP09
NP09
 
 
 
46N/124W
46N/124W
 
  Robert Kamphaus
Overhaul or Repair
  66/66

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Regulatory D/D Not Specified 0/INST-UW/P
 
Notes: Location of Drydock Seattle, WA. Incl. required Z-drive o/h; BWTS install; mast modification for VSAT.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:12 Dec 2020
Dep:12 Dec 2020
Arr:31 Dec 2020
Unload:31 Dec 2020
 
Seattle, WA, USA
Seattle, WA, USA
 
Pacific NW/
NP09
NP09
 
 
 
46N/124W
46N/124W
 
  Robert Kamphaus
Available for Service
  20/20

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Post-drydock re-provisioning. 14-day quarantine period to be ready for science by 1 Jan 2021.
Agency   Funded   Pending   Total
INST   22   7   29
NAVY   1   0   1
NSF   131   0   131
NSF-OOI   21   19   40
OTHER   1   0   1
Total  176 26 202
<
Day Type   Total
Available for Service   23
Transit Cruise   56
General Upkeep and Outfitting   3
Inspection   2
Standby Days   69
Overhaul or Repair   68
At Sea for Science   118
Total  339
<
Load/Unload Days   Total
ChargeLoad   16
ChargeUnload   11
NonChargeUnload   1
Total  28