M3 MARUM
-
2020
-
Thomas G. Thompson
|
|
|
Project Title: |
Sonar Monitoring of Natural Release of Methane Greenhouse Gas from the Seafloor-A Contribution to the Understanding of Global Change |
Project Status: |
Submitted |
Principal Investigator: |
Deborah S. Kelley, UW |
Project Institution: |
UW |
Project ID: |
106440 |
Version #: |
1 |
Date Submitted: |
2/21/2019 2:20:00 PM |
Created By: |
Deborah S. Kelley |
Date Last Modified: |
2/21/2019 2:20:00 PM |
URI Serial #: |
None |
Funding Agencies: |
OTHER - A127457 - Funded |
Summary of Field Work: |
It is anticipated that two MARUM multibeam sonars, a 4K camera and a CTD currently installed at Southern Hydrate Ridge on the OOI Regional Cabled Observatory (RCA) will be recovered. However, if the award is extended the instruments may be turned. |
Summary of Facility Requirements: |
This effort requires 1 day of field work added onto the 2020 RCA annual field program using the ROV. |
Summary of other requirements and comments: |
MARUM has indicated that there is funding in place for 2020 (a modification to the contract is in progress). If the program is not extended past 2020, then the requirement will be to recover the instruments in 2020 before the award ends per NSF guidance. |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1010404 |
Created By: |
Deborah S. Kelley |
Date Last Modified: |
2/21/2019 2:20:00 PM |
Date Submitted: |
2/21/2019 2:20:00 PM |
|
Year: |
2020
|
Ship/Facility: |
Thomas G. Thompson
|
Optimum Start Date:
|
7/7/2020 |
Dates to Avoid: |
Early June and late September, especially October due to historically poor weather conditions that put ROV operations at risk |
|
|
|
|
Earliest Start Date: |
6/25/2020 |
Multi-Ship Op: |
No |
Latest Start Date: |
7/14/2020 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
1 |
0 |
0 |
0 |
1 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
|
|
Short Description of Op Area
for use in schedules: |
Hydrate Ridge |
Description of Op Area: |
Southern Hydrate Ridge at the RCA cabled site off Newport Oregon |
Op Area Size/Dia.: |
1 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
44.566667° N
/
125.133333° W
map
44° 34.00002' N
/
125° 7.99998' W
map
|
|
|
Ending
|
44.566667° N
/
125.133333° W
map
44° 34.00002' N
/
125° 7.99998' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Newport, OR, USA |
None |
Newport, OR, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Newport is the preferred port for Cabled Array work as it is closest to the work sites (i.e. only ~ 5 hr steam to Southern Hydrate Ridge) |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Deborah S. Kelley, UW |
# in Science Party |
36 |
# of different science teams |
3 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
2 |
Explanation of Science Party Requirements and Technician Requirements |
This cruise will include the RCA team, the ROV Jason team and representatives from MARUM (likely at least 2 participants) |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
The ROV Jason is required to turn RCA infrastructure (e.g. latch into heavy packages, plug/unplug wet mate connectors etc). |
|