Endurance Array OM
-
2020
-
Global
|
|
|
Project Title: |
OOI Endurance Array OM |
Project Status: |
Submitted |
Principal Investigator: |
Edward P. Dever, OSU-CEOAS |
Project Institution: |
OSU_COAS |
Project ID: |
106502 |
Version #: |
2 |
Date Submitted: |
5/23/2019 10:31:00 AM |
Created By: |
Edward P. Dever |
Date Last Modified: |
9/28/2020 2:43:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NSF-OOI/OOI - NONE - Funded |
Summary of Field Work: |
Maintain long term moored array off the coast of Oregon and Washington |
Summary of Facility Requirements: |
UNOLS global class ship for mooring work, prefer R/V Thompson due to close home porting etc. |
Summary of other requirements and comments: |
crane (13,000 lbs), A-frame, 1200 sq ft main deck, 60,000 lb deck load, trawl winch, experience with mooring operations |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1010488 |
Created By: |
Edward P. Dever |
Date Last Modified: |
6/21/2019 5:47:00 PM |
Date Submitted: |
5/23/2019 10:31:00 AM |
|
Year: |
2020
|
Ship/Facility: |
Global
|
Optimum Start Date:
|
9/15/2020 |
Dates to Avoid: |
weather window for mooring operations closes in early October |
|
|
|
|
Earliest Start Date: |
9/1/2020 |
Multi-Ship Op: |
No |
Latest Start Date: |
10/1/2020 |
Other Ship(s): |
It looks like there is not an option for global/oceans. I listed a global ship request, but oceans would also work |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
16 |
2 |
1 |
0 |
19 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
timing is set by 6 month turn cycle for mooring components and weather window in which mooring operations can be accomplished |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
mooring gear is large enough that global or oceans class ship is required. Number of days is set by the number of mooring operations that must occur. |
|
Short Description of Op Area
for use in schedules: |
NP9 |
Description of Op Area: |
Oregon and Washington shelf and slope |
Op Area Size/Dia.: |
300,000 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
44° 30' N
/
124° 0' W
map
|
|
|
Ending
|
44° 30' N
/
124° 0' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
US EEZ |
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
all needed permits on file. Needed permits are USCG PATON, Olympic Coast NMS, and Oregon Dept. of State Lands |
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Newport, OR, USA |
None |
Newport, OR, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
large mooring equipment most efficiently transported and loaded in Newport |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Edward P. Dever, OSU-CEOAS |
# in Science Party |
15 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
technician needed to assist science party with mooring ops and CTD |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
1 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
1 10'x10' seavan with mooring tools and equipment west coast OOI Heavy Lift Winch (16,000 lbs weight; 480V 3-phase power, with a maximum draw of 200A) west coast winch pool TSE winch
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
TSE winch |
|