Ship Time Request System
Search Public Records
Funded Projects
Funded Requests
Published Schedules
Search Funded Projects/Requests
All Ports
All Ancillary Facilities
UNOLS Equipment Inventory
All Ships
Help
Suggestions/Request Help
Frequently Asked Questions
Log In
View Schedule
or
schedule as:
Expanded (Text)
Condensed (Text)
Expanded (PDF)
Send schedule email to:
Note for recipient(s):
the schedule as:
Excel XML
CSV
Google Earth Map (KML)
ICal Calendar
2011
-
JASON
Dec 12 Update
Final
- ID #
11330
Version #
3
-
1/23/2012
Scheduling Contact(s)
Kerry Strom
kstrom*%*%*whoi^%^%^edu
(508) 289-3938
Notes:
1/24/12: Final schedule published
12/12/11: Added extra mob day for Jason/ Edgcomb 11/22 - 11/24 (3), and cruise end Dec 8 (one day early) = extra demob day 12/9- 12/11 (3).
11/22/11: Updated Nooner/Webb cruise to 28 days (from 25) and shifted Edgcomb and C.German 3 days later. (no op days for German in 2011 with 3 day shift).
9/30/11: Updated C. German cruise. Port changed to Port Everglades and added 2 days (1 engineering dive and 1 transit day).
10/29/10: Added port day to match Atlantis sched
2/1/11: Added Chris German cruise
3/9/11: Chadwick / Lilley / Embley cruise departing one day earlier. July 18.
3/30: Jason schedule change after Valentine. Oct 1 to fit in Webb/Nooner. Note change in Edgcomb and German. Decreased op days by 11 from orig. schedule.
6/24: Changed Chadwick Departure date to July 19 as orig. scheduled - added 1 mob day.
6/24: Chadwick cruise - Canceled M.Zumberge days to 0. Adjusted charge days to other participants (18 days).
8/4/11: Changed FISHER Departure date to June 29
9/28: Updated Johnson / Tivey / Farr cruise arrival date AUG 24.
View Summary
Set Default
Associated Cruises
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
20 Mar 2011
Dep:
20 Mar 2011
Arr:
20 Mar 2011
Unload:
20 Mar 2011
Jacksonville, FL, USA
Jacksonville, FL, USA
/
0N/0E
0N/0E
1/1
Project
PI/Institution
Project #
Days/Agency/Status
Load Jason
Not Specified
1/NSF-OCE-EDU/F
Notes:
Jason was loaded on deck 3/20 Jason was off loaded 3/21
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
16 May 2011
Dep:
20 May 2011
Arr:
07 Jun 2011
Unload:
08 Jun 2011
Honolulu, HI, USA
Honolulu, HI, USA
Station ALOHA/
NP12
NP12
23N/158W
23N/158W
Bruce M. Howe
19/24
Ancil Facs:
Jason
Project
PI/Institution
Project #
Days/Agency/Status
ALOHA Cabled Observ
Bruce M. Howe
/
UH_SOEST
0939570
19/NSF-OCE-OTIC/F
Kaena Ridge
John Sinton
/
UH_SOEST
1031485
5/NSF-OCE-MGG/F
R/V Kilo Moana
Not Specified
0/OTHER/P
Notes:
1/26/11: Shifted HOWE cruise 3 days to the right.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
24 Jun 2011
Dep:
29 Jun 2011
Arr:
14 Jul 2011
Unload:
16 Jul 2011
Astoria, OR, USA
Astoria, OR, USA
/
0N/0E
0N/0E
Andrew T. Fisher
16/23
Project
PI/Institution
Project #
Days/Agency/Status
JFR flank hydrogeo
Andrew T. Fisher
/
UCSC
1031808
19/NSF-OCE-ODP/F
1024C dive
Keir Becker
/
RSMAS
OCE-0726887
2/NSF-OCE-ODP/F
Microbial Ecology
James Cowen
/
UH_SOEST
MCB 0604014
2/NSF-BIO-MCB/F
R/V Atlantis
Not Specified
0/OTHER/P
Notes:
1074nm from San Diego to dive site/4 days transit/1 day arriv.dpt/ 1 day to Astoria: Total 6 days transit Andy Fisher 11, Keir Becker 1, Jim Cowen 1 total science days: 13 I'm attaching the recently-released IODP drilling schedule. With respect to scheduling for Summer 2011 Juan de Fuca flank activities (OCE-1031808 and linked), the primary potential for conflict is with 3-4 among our collaborator group associated with IODP Expedition 336, North Atlantic Microbiology. Although that expedition begins around 9/17/11, many of the co-PIs for that program will be working down to the last minute to prepare engineering and scientific equipment and shipping it out to make IODP deadlines. For that reason, it will be best for us to have our Atlantis/Jason JdF flank program scheduled as early in our weather window as possible - June start will be ideal. We realize that you are balancing the needs of many groups. Thanks for your efforts in support of all of this work.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
17 Jul 2011
Dep:
19 Jul 2011
Arr:
01 Aug 2011
Unload:
03 Aug 2011
Astoria, OR, USA
Astoria, OR, USA
/
NP09
NP09
46N/130W
46N/130W
William W. Chadwick
14/18
Ancil Facs:
Other ROV
Project
PI/Institution
Project #
Days/Agency/Status
Monitoring inflation
William W. Chadwick
/
OSU_HMSC
0725605
5/NSF-OCE-MGG/F
High Rise Res
Marv Lilley
/
UW
0819004
5/NSF-OCE-MGG/F
VENTS
Robert W. Embley
/
PMEL
Not Specified
3/NOAA/F
Collaborative resear
Raymond W. Lee
/
WSU
0623554
3/NSF-OCE-BIO/F
Tongi U - Dr. Zhou
Not Specified
2/OTHER/F
PGPR at Axial
Mark A. Zumberge
/
SIO
ARRA 0851540
0/NSF-OCE-OTIC/F
Notes:
3 Lilley, 1 Zumberge, 2 Lee, 2 Embley, 3 Chadwick/ 11 science/ transit: 1 day Astoria to JDF, 2 days JdF to Astoria. 3/9/11: Dr. Huaiyang Zhou has added one day to this cruise. Must depart one day earlier than originally scheduled.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
04 Aug 2011
Dep:
06 Aug 2011
Arr:
24 Aug 2011
Unload:
28 Aug 2011
Astoria, OR, USA
Astoria, OR, USA
/
0N/0E
0N/0E
Harlan P. Johnson
19/25
Project
PI/Institution
Project #
Days/Agency/Status
RAVEN
Harlan P. Johnson
/
UW
1037870
14/NSF-OCE-MGG/F
CORK-OTS
Maurice A. Tivey
/
WHOI
0926849
4/NSF-OCE-OTIC/F
HSOpticalComms
Norman Farr
/
WHOI
0942835
3/NSF-OCE-OTIC/F
HSOpticalComms
Norman Farr
/
WHOI
0942835
3/NSF-OCE-OTIC/F
2010 Jason Engineeri
Andrew D. Bowen
/
WHOI
Not Specified
1/NSF-OCE/F
R/V Atlantis
Not Specified
0/OTHER/P
Notes:
Includes 10 days for Johnson, 3 days funded for Tivey and 4 for Farr ( Farr has 2 in 2010, 2 in 2011), 1 Jason Eng dive/ 3 transit. total 18 ops days. 3 transit
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
29 Aug 2011
Dep:
31 Aug 2011
Arr:
08 Sep 2011
Unload:
10 Sep 2011
Astoria, OR, USA
San Francisco, CA, USA
/
0N/0E
0N/0E
Lisa A. Levin
9/13
Project
PI/Institution
Project #
Days/Agency/Status
Structure, Function
Lisa A. Levin
/
SIO
0826254
13/NSF-OCE-BIO/F
R/V Atlantis
Not Specified
0/OTHER/P
Notes:
Astoria to Hydrate: ~50-80nm. N Sta to San Fran (244nm, 1day) total transit 2 days plus 1 day arri.dpt: 3 days. 6 science days with Jason Late July early Aug. is fine with me. I anticipate being in Namibia/africa until either the end of June or mid July in 2011. We ideally need the cruise before mid Sept. when school starts and the weather is crappy (school may star earlier for Rathburn or Orphan).
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
11 Sep 2011
Dep:
13 Sep 2011
Arr:
29 Sep 2011
Unload:
01 Oct 2011
San Francisco, CA, USA
San Diego, CA, USA
/
0N/0E
0N/0E
David L. Valentine
17/21
Project
PI/Institution
Project #
Days/Agency/Status
Petroleum Weathering
David L. Valentine
/
UCSB
0961725
21/NSF-OCE-CO/F
R/V Atlantis/Sentry
Not Specified
0/OTHER/P
Notes:
12 dives, 4 transit, 1 water making (2009 cruise: 12 dives, 3 transit, 1 water making) an additional transit day was added in 2011 to accommodate using Jason and navigating inshore tethered to the vehicle.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
02 Oct 2011
Dep:
04 Oct 2011
Arr:
28 Oct 2011
Unload:
29 Oct 2011
San Diego, CA, USA
Balboa, Panama
EPR 9N/
NP13
NP13
10N/104W
9N/104W
Spahr C. Webb
25/28
Ancil Facs:
Jason
Project
PI/Institution
Project #
Days/Agency/Status
EPR BPRs
Spahr C. Webb
/
LDEO
NSF 0426575
16/NSF-OCE-MGG/F
Establishing a lo
Scott L. Nooner
/
UNCW
0647840
11/NSF-OCE-MGG/F
2010 Jason Engineeri
Andrew D. Bowen
/
WHOI
Not Specified
1/NSF-OCE/F
R/V Atlantis
Not Specified
0/OTHER/P
Notes:
11/22: Added 3 days onto Nooner/Webb cruise due to weather, mechanical and Jason technical delays. Cruise ends Oct 28. Canal transit Oct 29. Balboa to EPR 1603nm/6/7days EPR to Puntarenas 1200nm/4.5/5 EPR to San Diego 1578nm/5.9D 2 Days Nooner, 6 days Webb included days days added for Recovery of stuck BPR's/Webb, 1 day eng dive. 1 day transit between stations: 9 + transit
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
22 Nov 2011
Dep:
25 Nov 2011
Arr:
08 Dec 2011
Unload:
11 Dec 2011
Piraievs, Greece
Piraievs, Greece
/
0N/0E
0N/0E
14/20
Project
PI/Institution
Project #
Days/Agency/Status
Pickled Protists
Virginia P. Edgcomb
/
WHOI
0849578
15/NSF-OCE-BIO/F
Bodysnatchers
Joan M. Bernhard
/
WHOI
1061391
5/NSF-OCE-BIO/F
R/V Atlantis
Not Specified
0/OTHER/P
Notes:
12/12/11: Atlantis early arrival into Greece 11/21 = extra mob day 11/22 - 11/24 (3) and early arrival back into Greece DEC 8 = extra demob day 12/9 - 12/11 (3). total charge days 20. 11/22: Shifted cruise dates 3 days later ('to the right').
Agency
Funded
Pending
Total
NOAA
3
0
3
NSF
168
0
168
OTHER
2
0
2
Total
173
0
173