  2021 - Thomas G. Thompson  
Version 9
Secure - ID #14543    Version #2 - 4/9/2021

Scheduling Contact(s)
Robert Kamphaus kamphaus*%*%*uw^%^%^edu (206) 685-5672
Elizabeth A. Rios Brenner ebrenner2156*%*%*att^%^%^net (760) 801-9650

  Notes:   2021 US Academic Research Fleet vessel schedules are subject to change as the COVID-19 pandemic evolves. Scheduled cruise Chief Scientists are urged to keep in close contact with the vessel operators to remain aware of any updates/changes.


To accommodate RR Elon's OBS cruise back to November. And relieve Gartman/Resing Sentry conflict.
8/6 Craig Young requires 5 additional dates of science and 2 additional days of transit.
Updated STR to follow.
8/25 Added one day each for Jason and Sentry engineering dive to Young.
9/3 Advance Young by 2 days. This allows for 7 full days of transit for Jason between Trude/Valentine on RR and Young on TGT. We anticipate an entirely new Jason team will sail on Young.
9/11 Moved transit to Darwin, Landry and IO projects to a new 2022 LOI.
9/15 Changed funding line for GO-SHIP
9/17 The UW funded Alaskan Fjords/Glaciers cruise has been canceled, formally scheduled in late 2020/early 2021.
10/6 Split out GO-FAR to estimate Panama canal crossing date (Pacific-Atlantic).
10/13 Split out transit Gulfport to San Diego to estimate Panama canal crossing date (Atlantic to Pacific).
11/20 Due to equipment shipping delays remove the 5 day EM-Evans component from the GOFAR cruise. Move the departure 5 days later.
11/25 Depart Seatte one day early for a one day non-op in San Diego
12/17-Move GO-SHIP intermediate port from Puerto Rico to US Virgin Islands. Transfer OOI-RCA and OOI-Endurance to TGT, in exchange of Ohman and Resing to RR. Add one day to the transit from Gulfport to Cristobal.
12/31 One additional day required for transit from Seattle to San Diego. The revised departure from Seattle is now 12 January.
1/15 Remove Wilcock/NSF from D. Kelley RCA OOI cruise.
1/26 Add an additional transit day from Seattle to San Diego to begin V. Armbrust's project plus one day for senior thesis instruction. Delay SEA-SAN transit and Armbrust start date to increase general upkeep and outfitting in October/Seattle.
1/28 Removed two ONR days from OOI-RCA
3/3. Arrival into Port Everglades, FL one day early. Added two days to Craig Young for H. Seim. Start Kelley in Seattle.
4/7 Added a mid cruise personnel transfer in Key West for Craig Young. Shawn Arellano will be chief scientist for first leg.
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jan 2021
Dep:01 Jan 2021
Arr:11 Jan 2021
Unload:11 Jan 2021
 
Seattle, WA, USA
Seattle, WA, USA
 
Seattle/
NP09
NP09
 
 
 
48N/122W
48N/122W
 
  Robert Kamphaus
Standby Days
  11/11

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Pre-cruise isolation (crew quarantine) prior to returning to operations.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:12 Jan 2021
Dep:12 Jan 2021
Arr:17 Jan 2021
Unload:17 Jan 2021
 
Seattle, WA, USA
San Diego, CA, USA
 
Sea-SAN/
NP09
NP09
 
 
 
48N/122W
33N/117W
 
  Robert Kamphaus
Transit Cruise
  6/6

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 6/NSF-OCE-MGG/F
 
Notes: TN-386

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:18 Jan 2021
Dep:18 Jan 2021
Arr:18 Jan 2021
Unload:18 Jan 2021
 
San Diego, CA, USA
San Diego, CA, USA
 
San Diego/
NP09
NP09
 
 
 
33N/117W
33N/117W
 
  Robert Kamphaus
General Upkeep and Outfitting
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Jan 2021
Dep:21 Jan 2021
Arr:25 Feb 2021
Unload:25 Feb 2021
 
San Diego, CA, USA
Balboa, Panama
 
Gofar TF, EPR/
SP03
SP03
 
 
 
5S/106W
4S/106W
 
  John A. Collins
  36/38

Clearances: NONE(T)

Ancil Facs: Ocean Bottom Seismograph Instrument Pool (OBSIP), Portable Winch
 
Project PI/Institution Project # Days/Agency/Status
Gofar TF Earthquakes Margaret Boettcher/UNH 1832830 38/NSF-OCE-MGG/F
 
Notes: TN-387 Deferred from 2020, Changed ChiSci from Rob Evans to John Collins. Reduced science days from 25 to 20 days. Defer EM component (R.Evans) to 2022. Feb 25th 1100 hrs - ETA Balboa 1800 hrs - POB time / Scheduled to commence BOOKED transit 2000 hrs - Scheduled to arrive first locks

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:26 Feb 2021
Dep:26 Feb 2021
Arr:03 Mar 2021
Unload:05 Mar 2021
 
Cristobal, Panama
Port Everglades, FL, USA
 
Gofar TF, EPR/
NA09
NA09
 
 
 
9N/80W
26N/80W
 
  John A. Collins
Transit Cruise
  6/8

Clearances: NONE(T)

Ancil Facs: Ocean Bottom Seismograph Instrument Pool (OBSIP), Portable Winch
 
Project PI/Institution Project # Days/Agency/Status
Gofar TF Earthquakes Margaret Boettcher/UNH 1832830 8/NSF-OCE-MGG/F
 
Notes: TN-387B Assumes Panama Canal crossing early evening on the 26th. No planned personnel disembarkment in Panama. Deferred from 2020 Arrival one day early.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Mar 2021
Dep:06 Mar 2021
Arr:06 Mar 2021
Unload:06 Mar 2021
 
Port Everglades, FL, USA
Port Everglades, FL, USA
 
in port/
NA09
NA09
 
 
 
26N/80W
26N/80W
 
  Robert Kamphaus
Standby Days
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Crew change day.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Mar 2021
Dep:07 Mar 2021
Arr:11 Mar 2021
Unload:11 Mar 2021
 
Port Everglades, FL, USA
Woods Hole, MA, USA
 
North Atlantic/
NA09
NA06
 
 
 
26N/80W
42N/71W
 
  Robert Kamphaus
Transit Cruise
  5/5

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
US GO-SHIP Lynne D. Talley/SIO 1437015 5/NSF-OCE-PO/F
 
Notes: TN-388 A20/A22 4 days for additional transit days if starting from Ft. Lauderdale RT with WHOI as intermediate port stop. WHOI to WHOI more efficient for Young-Jason load out.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:12 Mar 2021
Dep:16 Mar 2021
Arr:16 Apr 2021
Unload:18 Apr 2021
 
Woods Hole, MA, USA
Charlotte Amalie, St. Thomas, Virgin Islands
 
North Atlantic/
NA06
NA09
 
 
 
43N/51W
7N/53W
 
  Ryan J. Woosley
  32/38

Clearances: France(A)
 
Project PI/Institution Project # Days/Agency/Status
US GO-SHIP Lynne D. Talley/SIO 1437015 38/NSF-OCE-PO/F
 
Notes: TN-389 A20. This was a replacement for a deferred 2020 GO-SHIP.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Apr 2021
Dep:20 Apr 2021
Arr:17 May 2021
Unload:19 May 2021
 
Charlotte Amalie, St. Thomas, Virgin Islands
Woods Hole, MA, USA
 
North Atlantic/
NA09
NA06
 
 
 
13N/70W
40N/70W
 
  Viviane Menezes
  28/31

Clearances: Bermuda(A), Dominican Republic(A), Netherlands(A)
 
Project PI/Institution Project # Days/Agency/Status
US GO-SHIP Lynne D. Talley/SIO 1437015 31/NSF-OCE-PO/F
 
Notes: TN-390 A22. This was a replacement for a deferred 2020 GO-SHIP.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:20 May 2021
Dep:20 May 2021
Arr:20 May 2021
Unload:20 May 2021
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
WHOI/
NA06
NA06
 
 
 
42N/71W
42N/71W
 
  Robert Kamphaus
Standby Days
  1/1

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:21 May 2021
Dep:25 May 2021
Arr:08 Jun 2021
Unload:08 Jun 2021
 
Woods Hole, MA, USA
Key West, FL, USA
 
GOM and WAM/
NA06
NA09
 
 
 
42N/71W
30N/89W
 
  Shawn Arellano
  15/19

Clearances: NONE(T), US EEZ(T)

Ancil Facs: Sentry, Jason
 
Project PI/Institution Project # Days/Agency/Status
seep larval dispersa Craig M. Young/OIMB 1851383 15/NSF-OCE-BIO/F
PEACH Harvey Seim/UNC_CH 1558920 2/NSF-OCE-PO/F
Sentry2021EngDives Sean Kelley/WHOI Not Specified 1/NSF-OCE-IPS/F
2021 Jason Eng Dives Matt Heintz/WHOI Not Specified 1/NSF-OCE-IPS/P
 
Notes: TN-391A Young requested Sentry. Increased science days by 5, increased transit by 2. Added two days for PEACH. Mid cruise small boat personnel transfer in Key West

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:08 Jun 2021
Dep:08 Jun 2021
Arr:20 Jun 2021
Unload:22 Jun 2021
 
Key West, FL, USA
Gulfport, MS, USA
 
GOM and WAM/
NA06
NA09
 
 
 
42N/71W
30N/89W
 
  Craig M. Young
  12/14

Clearances: NONE(T), US EEZ(T)

Ancil Facs: Sentry, Jason
 
Project PI/Institution Project # Days/Agency/Status
seep larval dispersa Craig M. Young/OIMB 1851383 14/NSF-OCE-BIO/F
PEACH Harvey Seim/UNC_CH 1558920 0/NSF-OCE-PO/F
Sentry2021EngDives Sean Kelley/WHOI Not Specified 0/NSF-OCE-IPS/F
2021 Jason Eng Dives Matt Heintz/WHOI Not Specified 0/NSF-OCE-IPS/P
 
Notes: TN-391B Young requested Sentry. Increased science days by 5, increased transit by 2. Added two days for PEACH. Mid cruise small boat personnel transfer in Key West

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:23 Jun 2021
Dep:23 Jun 2021
Arr:29 Jun 2021
Unload:29 Jun 2021
 
Gulfport, MS, USA
Cristobal, Panama
 
transit/
NA09
NA09
 
 
 
30N/89W
9N/80W
 
  Robert Kamphaus
Transit Cruise
  7/7

Clearances: NONE(T), US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 7/NSF-OCE-BIO/F
 
Notes: TN-392A Estimate arrival 0200 29th, crossing evening of the 29th.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 Jun 2021
Dep:30 Jun 2021
Arr:15 Jul 2021
Unload:15 Jul 2021
 
Balboa, Panama
Seattle, WA, USA
 
transit/
NA09
NP09
 
 
 
9N/80W
48N/122W
 
  Robert Kamphaus
Transit Cruise
  16/16

Clearances: NONE(T), US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 11/NSF-OCE-PO/F
Not Specified 5/NSF-OCE-MGG/F
 
Notes: TN-392B Assumes crossing will take place evening of the 29th with arrival into Balboa morning of the 30th.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:16 Jul 2021
Dep:16 Jul 2021
Arr:29 Jul 2021
Unload:29 Jul 2021
 
Seattle, WA, USA
Seattle, WA, USA
 
In home port/
NP09
NP09
 
 
 
48N/122W
48N/122W
 
  Robert Kamphaus
Standby Days
  14/14

Clearances: NONE(T), US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 Jul 2021
Dep:02 Aug 2021
Arr:03 Sep 2021
Unload:05 Sep 2021
 
Seattle, WA, USA
Newport, OR, USA
 
Axial Seamount/
NP09
NP09
 
 
 
46N/130W
46N/130W
 
  Deborah S. Kelley
  33/38

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI-RCA Deborah S. Kelley/UW A101403 22/NSF-OOI-OOI/P
OOI-RCA Not Specified 10/INST-UW/F
InVADER Aaron Marburg/UW_APL NNH17ZDA001N-PSTAR 2/NASA/T
Phase 2 Enhancements William W. Chadwick/OSU_HMSC 1928282 1/NSF-OCE-MGG/F
Pyhtias Revisited Deborah S. Kelley/UW 1658201 1/NSF-OCE-MGG/F
MARUM - M3 Deborah S. Kelley/UW A127457 1/OTHER/F
BOEM Deborah S. Kelley/UW Not Specified 1/BOEM/T
Jason Not Specified 0/OTHER/P
 
Notes: TN-393 Reduced overall day count to 33 days, this number is preliminary, project days may be reduced, TBD. Reduced load out to 3 days. Cruise will likely be split into 3-4 different legs.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Sep 2021
Dep:06 Sep 2021
Arr:06 Sep 2021
Unload:06 Sep 2021
 
Newport, OR, USA
Newport, OR, USA
 
Newport/
NP09
NP09
 
 
 
45N/124W
45N/124W
 
  Robert Kamphaus
Standby Days
  1/1

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Sep 2021
Dep:09 Sep 2021
Arr:24 Sep 2021
Unload:25 Sep 2021
 
Newport, OR, USA
Newport, OR, USA
 
NP9/
NP09
NP09
 
 
 
44N/124W
44N/124W
 
  Jonathan P. Fram
  16/19

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Endurance Array OM Edward P. Dever/OSU-CEOAS Not Specified 19/NSF-OOI-OOI/P
 
Notes: TN-394

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:26 Sep 2021
Dep:26 Sep 2021
Arr:30 Sep 2021
Unload:30 Sep 2021
 
Newport, OR, USA
Seattle, WA, USA
 
PNW/
NP09
NP09
 
 
 
45N/124W
48N/122W
 
  Jan Newton
Transit Cruise
  5/5

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
2 Dever 1 Kelley Not Specified 3/NSF-OOI-OOI/F
Cha Ba mooring Jan Newton/UW_APL Not Specified 2/INST-UW/F
 
Notes: TN-395

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Oct 2021
Dep:01 Oct 2021
Arr:31 Oct 2021
Unload:31 Oct 2021
 
Seattle, WA, USA
Seattle, WA, USA
 
Homeport/
NP09
NP09
 
 
 
48N/122W
48N/122W
 
  Robert Kamphaus
General Upkeep and Outfitting
  31/31

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Nov 2021
Dep:01 Nov 2021
Arr:07 Nov 2021
Unload:07 Nov 2021
 
Seattle, WA, USA
San Diego, CA, USA
 
E. Pacific/
NP09
NP09
 
 
 
48N/122W
33N/117W
 
  Robert Kamphaus
Transit Cruise
  7/7

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 7/INST-UW/F
 
Notes: TN-396 Includes a day for UW academic research.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:08 Nov 2021
Dep:09 Nov 2021
Arr:06 Dec 2021
Unload:07 Dec 2021
 
San Diego, CA, USA
Honolulu, HI, USA
 
North Pacific/
NP09
NP12
 
 
 
33N/117W
21N/158W
 
  E. Virginia Armbrust
  28/30

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Gradients 4 E. Virginia Armbrust/UW Not Specified 20/OTHER/F
Not Specified 10/INST-UW/F
 
Notes: TN-397

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:08 Dec 2021
Dep:08 Dec 2021
Arr:31 Dec 2021
Unload:31 Dec 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
Hawaiian Is./
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Robert Kamphaus
General Upkeep and Outfitting
  24/24

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Agency   Funded   Pending   Total
BOEM   0   1   1
INST   29   0   29
NASA   0   2   2
NSF   183   1   184
NSF-OOI   3   41   44
OTHER   21   0   21
Total  236 45 281
<
Day Type   Total
Transit Cruise   52
General Upkeep and Outfitting   56
Standby Days   28
At Sea for Science   200
Total  336
<
Load/Unload Days   Total
ChargeLoad   17
ChargeUnload   12
Total  29