|
PhilSea10
-
2010
-
Roger Revelle
|
|
|
Project Title: |
NPAL PhilSea10 Philippine Sea Integrated Experiment |
Project Status: |
Submitted |
Principal Investigator: |
James A. Mercer, UW_APL |
Project Institution: |
UW_APL |
Project ID: |
101514 |
Version #: |
8 |
Date Submitted: |
2/19/2008 6:11:00 PM |
Created By: |
James A. Mercer |
Date Last Modified: |
10/22/2009 4:03:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NAVY/ONR/OAS - N000014-08-1-0843 - Funded |
Summary of Field Work: |
Suspended acoustic source transmissions, towed source transmissions, deep CTDs, and towed CTD Chain survey |
Summary of Facility Requirements: |
Working A-frame, full ocean depth CTD system, Hdrographic Doppler Sonar, dynamic positioning, 100-Amp 240-Volt 3-phase power, multi-beam sonar, sub-bottom profiler, working main deck crane |
Summary of other requirements and comments: |
The experimental work is entirely within International waters. We will want to connect a leased C-Nav GPS system to the ship's navigation and dynamic positioning system as we did last year on the Melville. |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1002027 |
Created By: |
James A. Mercer |
Date Last Modified: |
10/22/2009 4:03:00 PM |
Date Submitted: |
2/19/2008 6:26:00 PM |
|
Year: |
2010
|
Ship/Facility: |
Roger Revelle
|
Optimum Start Date:
|
4/25/2010 |
Dates to Avoid: |
Typhoon frequency increases dramatically after towards end of May |
|
|
|
|
Earliest Start Date: |
4/25/2010 |
Multi-Ship Op: |
Yes |
Latest Start Date: |
5/2/2010 |
Other Ship(s): |
Immediately following the Worcester (SIO) cruise, Mercer (UW_APL) will acoustically transmit to the moorings installed by Worcester |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
21 |
4 |
2 |
4 |
31 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
Mercer's cruise must occur directly after Worcester's cruise. We will be placing two 20-ft. vans on the main deck and storing two 20-ft. vans elsewhere aboard ship. We will also be placing a large winch the size of a 20-ft. van on the main deck. |
|
Short Description of Op Area
for use in schedules: |
Philippine Sea |
Description of Op Area: |
International Waters of Philippine Sea No foreign EEZs involved. |
Op Area Size/Dia.: |
270 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
19° 0' N
/
130° 12' E
map
|
|
|
Ending
|
19° 0' N
/
130° 12' E
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
Philippines |
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Kao-hsiung, Taiwan |
None |
Kao-hsiung, Taiwan |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
James A. Mercer, UW_APL |
# in Science Party |
15 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
3 |
Explanation of Science Party Requirements and Technician Requirements |
computer tech; and two res. techs to support around the clock CTD work for several days. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
4 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
CTD, ADCP, deck crane for tow point, two user supplied 20' vans for main deck, large user supplied winch
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|