QPE
-
2009
-
Roger Revelle
|
|
|
Project Title: |
Quantifying, Predicting, and Exploiting Uncertainty |
Project Status: |
Submitted |
Principal Investigator: |
Glen Gawarkiewicz, WHOI |
Project Institution: |
WHOI |
Project ID: |
101536 |
Version #: |
1 |
Date Submitted: |
4/1/2008 5:02:00 PM |
Created By: |
Glen Gawarkiewicz |
Date Last Modified: |
4/1/2008 5:02:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NAVY/ONR/OAS - NONE - Funded |
Summary of Field Work: |
Integrated international multi-disciplinary field program to study uncertainty of oceanographic processes, seabed characterization, and low-frequency acoustic propagation over the outer shelf and upper slope of the East China Sea northeast of Taiwan. Program will include close collaboration with Taiwanese scientists |
Summary of Facility Requirements: |
We will be based out of Keelung, Taiwan. We will be working with National Taiwan University, National Taiwan Ocean University, and National Central University to work out logistics and harbor needs. |
Summary of other requirements and comments: |
Program will also include long-term drifter studies, glider deployments, as well as fine-scale hydrographic surveys using towed vehicles (SeaSoar) and EM-APEX floats. Acoustic studies will include deployment of horizontal and vertical line arrays for receivers as well as mobile acoustic sources and towed sources. Moorings will also be deployed including thermistor chains and bottom-mounted ADCPs. |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1002063 |
Created By: |
Glen Gawarkiewicz |
Date Last Modified: |
4/1/2008 5:02:00 PM |
Date Submitted: |
4/1/2008 5:02:00 PM |
|
Year: |
2009
|
Ship/Facility: |
Roger Revelle
|
Optimum Start Date:
|
5/5/2009 |
Dates to Avoid: |
|
|
|
|
|
Earliest Start Date: |
5/1/2009 |
Multi-Ship Op: |
No |
Latest Start Date: |
5/20/2009 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
7 |
1 |
1 |
0 |
9 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
|
|
Short Description of Op Area
for use in schedules: |
East China Sea |
Description of Op Area: |
East China Sea northeast of Taiwan extending as far south as Ilan Ridge |
Op Area Size/Dia.: |
60 NM |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
25° 0' N
/
122° 30' E
map
|
|
|
Ending
|
25° 30' N
/
122° 30' E
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
Yes |
Coastal States:
Taiwan |
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Chi-Lung, Taiwan |
None |
Chi-Lung, Taiwan |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Craig M. Lee, UW_APL |
# in Science Party |
4 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
Cruise will consist of glider deployment and hydrography (CTD casts) |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|