Project Title: |
DSG-X Cabled Range Installation |
Project Status: |
Submitted |
Principal Investigator: |
Todd Pickering, SPAWAR |
Project Institution: |
SPAWAR |
Project ID: |
101539 |
Version #: |
1 |
Date Submitted: |
4/17/2008 2:47:00 PM |
Created By: |
Todd Pickering |
Date Last Modified: |
10/9/2008 6:29:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NAVY - NONE - Funded |
Summary of Field Work: |
Install eight cables each with junction boxes in 50 to 100 meter of water off of east side of San Clemente Island. Calbes are installed from sea (junction Box) to NOTS Pier. Cable lengths vary from 1 km to 6 km. Expect 3 days of on site operations. |
Summary of Facility Requirements: |
Ship w/ A-Frame, bow thruster. Crane to load winch at pier. Project will bring winch, hydraulic power supply and stern cable fairlead/chute. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1002075 |
Created By: |
Todd Pickering |
Date Last Modified: |
4/17/2008 2:47:00 PM |
Date Submitted: |
4/17/2008 2:47:00 PM |
|
Year: |
2008
|
Ship/Facility: |
Robert Gordon Sproul
|
Optimum Start Date:
|
9/8/2008 |
Dates to Avoid: |
|
|
|
|
|
Earliest Start Date: |
9/8/2008 |
Multi-Ship Op: |
No |
Latest Start Date: |
9/10/2008 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
3 |
1 |
1 |
1 |
6 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
|
|
Short Description of Op Area
for use in schedules: |
SCI |
Description of Op Area: |
San Clemente Island, East side near NOTS Pier |
Op Area Size/Dia.: |
2.0 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
32.987° N
/
118.53° W
map
32° 59.22' N
/
118° 31.8' W
map
|
|
|
Ending
|
32.987° N
/
118.53° W
map
32° 59.22' N
/
118° 31.8' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
San Diego, CA, USA |
None |
San Diego, CA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Todd Pickering, SPAWAR |
# in Science Party |
7 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
|
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|