NoMelt
-
2012
-
Kilo Moana
|
|
|
Project Title: |
Collaborative Research: Structure and Composition of Oceanic Lithosphere and the Lithosphere/Asthenosphere Boundary |
Project Status: |
Submitted |
Principal Investigator: |
James B. Gaherty, NAU |
Project Institution: |
LDEO |
Project ID: |
101869 |
Version #: |
7 |
Date Submitted: |
2/5/2009 4:16:00 PM |
Created By: |
Daniel Lizarralde |
Date Last Modified: |
6/8/2011 10:17:00 AM |
URI Serial #: |
None |
Funding Agencies: |
NSF/OCE/MGG - 0928270 - Funded |
Summary of Field Work: |
Year 1, R/V Langseth, 33 days; Honolulu-Honolulu: OBS deployments (34 SP 27 BB), MT deployments (6), OBS airgun shooting with MCS streamer
Year 2, R/V Kilo Moana, 18 days, Honolulu-Hololulu: OBS recoveries (27) and MT recoveries (6) |
Summary of Facility Requirements: |
Year 1: MCS streamer and airguns, deck and lab space for OBS and MT operations Year 2: deck and lab space for OBS and MT operations |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1002686 |
Created By: |
Daniel Lizarralde |
Date Last Modified: |
6/8/2011 10:17:00 AM |
Date Submitted: |
2/5/2009 4:37:00 PM |
|
Year: |
2012
|
Ship/Facility: |
Kilo Moana
|
Optimum Start Date:
|
11/15/2012 |
Dates to Avoid: |
Must be no more than 12 months after Year 1 deployment cruise |
|
|
|
|
Earliest Start Date: |
7/1/2012 |
Multi-Ship Op: |
No |
Latest Start Date: |
9/1/2012 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
13 |
1 |
1 |
6 |
21 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
I have added one science day to the request. At the time we made this request, it was my impression that a science day was a day at sea. However, as days are counted in these requests, the final science day begins at 8:00 am at the dock. (That day does can not be used for science and so should not be counted as a science day.) The math on the 13 days is thus: 12 days of science operations at sea plus one day, the 29th day, spent at the dock. Note that due to our expectation of good weather (we were hoping for a summer-time cruise) I budgeted only 2 days of contingency, which is small for a recovery cruise of short duration (where 1 day makes a big difference). We are now in the worst possible weather window for this location. |
|
Short Description of Op Area
for use in schedules: |
1300km S of HI |
Description of Op Area: |
Centered on 8N 152W |
Op Area Size/Dia.: |
330 naut miles diam |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Honolulu, HI, USA |
None |
None |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
John A. Collins, WHOI |
# in Science Party |
7 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
|
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
OBS and MT recovery ops; van and instrument deck space; crane
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|