Project Title: |
OOI-O&M Cabled Array |
Project Status: |
Submitted |
Principal Investigator: |
Brian D. Ittig, UW |
Project Institution: |
UW |
Project ID: |
102092 |
Version #: |
3 |
Date Submitted: |
7/11/2009 5:59:00 PM |
Created By: |
Brian D. Ittig |
Date Last Modified: |
6/24/2016 2:25:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NSF-OOI/OOI - NONE - Funded |
Summary of Field Work: |
Operations and Maintenance activity of secondary infrastructure on the OOI-NSF Cabled Array including Slope Base, Southern Hydrate Ridge, Axial Seamount (caldera and base), and the cabled Oregon Endurance sites - Offshore and Shelf. |
Summary of Facility Requirements: |
Use of the R/V Thomas G. Thompson to meet berthing and deck layout requirements |
Summary of other requirements and comments: |
Transmission of live video from ship to shore-shore. Use of heavy lift (4000 lbs) ROV to install and recovery secondary nodes, need to be able to lay extension cables, and recovery and deploy sensors |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1003072 |
Created By: |
Brian D. Ittig |
Date Last Modified: |
2/24/2015 5:45:00 PM |
Date Submitted: |
7/11/2009 5:59:00 PM |
|
Year: |
2016
|
Ship/Facility: |
Thomas G. Thompson
|
Optimum Start Date:
|
7/1/2016 |
Dates to Avoid: |
May 2016 because of the weather window. ROV work requires optimal weather window. |
|
|
|
|
Earliest Start Date: |
7/1/2016 |
Multi-Ship Op: |
No |
Latest Start Date: |
7/15/2016 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
25 |
3 |
2 |
5 |
35 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
Cruise will need firm mob/demob schedule to comply with OOI scheduling requirements. |
|
Short Description of Op Area
for use in schedules: |
Juan de Fuca |
Description of Op Area: |
Axial Seamount and area ~ due west of Newport Oregon from 80 m to 3000 m water depth (OOI Cabled Array Sites - Slope Base, Southern Hydrate Ridge, Oregon Offshore, Oregon Shelf, and Axial Seamount) |
Op Area Size/Dia.: |
~200 Nm |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Seattle, WA, USA |
Newport, OR, USA |
Seattle, WA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Will need 2-3 port stops in Newport Oregon for mobing and demobing additional equipment as well as personnel changes. |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Brian D. Ittig, UW |
# in Science Party |
38 |
# of different science teams |
2 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
2 |
Explanation of Science Party Requirements and Technician Requirements |
Full contingent of science party will be needed due to requirements of having scientists, engineers, ROV Team and observers. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
Requires the use of a heavy left ROV (4000 lbs) to conduct operations and maintenance activities of secondary infrastructure - deploy and recover secondary nodes, lay extension cables, deploy and recover sensors. |
|