|
OOI Pioneer
-
2013
-
Knorr
|
|
|
Project Title: |
OOI CGSN Pioneer Array |
Project Status: |
Submitted |
Principal Investigator: |
Al Plueddemann, WHOI |
Project Institution: |
WHOI |
Project ID: |
101767 |
Version #: |
10 |
Date Submitted: |
10/1/2008 3:59:00 PM |
Created By: |
Paul Matthias |
Date Last Modified: |
10/11/2019 11:12:00 AM |
URI Serial #: |
None |
Funding Agencies: |
NSF-OOI/OOI - NONE - Funded |
Summary of Field Work: |
Initial deployment Fall 2013 of Pioneer Array moorings; servicing of moorings after 6 months through end of first operational period (2015-2020). |
Summary of Facility Requirements: |
Global vessel with dynamic positioning, crane rated to 7000 lbs, A-frame to 10 tons. 1200 sq ft working deck area; 60,000 lb ship deck load; 9,000 m 9/16 th trawl wire, 12 days endurance, experience with mooring operations. |
Summary of other requirements and comments: |
CTD and bathymetry surveys NOTE: The Project was updated from Bob Weller to Al Pleuddeman on 11Oct19 |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1003384 |
Created By: |
Paul Matthias |
Date Last Modified: |
12/13/2013 11:05:00 AM |
Date Submitted: |
11/18/2009 4:06:00 PM |
|
Year: |
2013
|
Ship/Facility: |
Knorr
|
Optimum Start Date:
|
10/15/2013 |
Dates to Avoid: |
Mooring servicing in spring and fall, timed for weather and biofouling cycle |
|
|
|
|
Earliest Start Date: |
10/1/2013 |
Multi-Ship Op: |
No |
Latest Start Date: |
11/1/2013 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
12 |
2 |
1 |
2 |
17 |
Repeating Cruise?
(within same year) |
Yes |
Interval: |
every 6 months |
# of Cruises: |
16 |
|
Description of Repeating cruise requirements: |
Recover, redeploy, refresh power systems and sensors every 6 months. |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
Spring and fall cruises to meet requirement to refresh power and sensors every 6 months, deal with biofouling. Deck payload when deploying and servicing moorings requires Global UNOLS vessel, such as Knorr. |
|
Short Description of Op Area
for use in schedules: |
NE shelf |
Description of Op Area: |
array located near 40 deg 3 min N, 70 deg 45 min W |
Op Area Size/Dia.: |
100 nm |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Woods Hole, MA, USA |
None |
Woods Hole, MA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Paul Matthias, WHOI |
# in Science Party |
10 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
Chief scientist, mooring and glider techs, instrument/system engineers |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
Trawl in case of ned to drag for moorings.
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
Global vessel with dynamic positioning, crane rated to 7000 lbs, A-frame to 10 tons. 1200 sq ft working deck area; 60,000 lb ship deck load; 9,000 m 9/16 th trawl wire, 12 days endurance, experience with mooring operations. |
|