Ship Request

STR Management has moved to MFP

The US Academic Research Fleet is moving to Marine Facilities Planning (MFP) for scheduling initially and eventually cruise planning.

For all NEW or RESUBMITTED Projects/Ship Time Requests, go to https://mfp.us and create a new SME. Some STRs for projects starting in 2022 and beyond have already been moved to Marine Facilities Planning (mfp.us). Check your MFP Science Portal for any projects that might already be moved. If you need to make edits to projects that begin in 2022 and beyond, please contact mfp@unols.org for assistance. Be sure to indicate the Project and STR IDs that you would like to edit. For more information on getting into MFP, see the More Information button below.

  ECS Mapping  -  2011  -  USCGC Healy  
  Project Information  
Project Title: ECS MAPPING of the Arctic Project Status: Submitted
Principal Investigator: Larry A. Mayer, UNH Project Institution: UNH
Project ID: 102262 Version #: 3
Date Submitted: 12/10/2009 2:52:00 PM Created By: Larry A. Mayer
Date Last Modified: 4/9/2010 10:58:00 AM URI Serial #: None
Funding Agencies: NOAA/OAR - ECS - Funded
Summary of Field Work: Multibeam mapping of areas north of the Chukchi Cap (Nautilus Basin), southern and northern sides of Alpha/Mendeleev Ridge into Makarov Basin. Mapping will be in collaboration with Canadian icebreaker Louis S. St. Laurent. If conditions permit we will meet Swedish Icebreaker ODEN (working for Denmark) with Russian icebreaker for sampling program on Lomonosov Ridge.
Summary of Facility Requirements: HEALY, multibeam, coring and dredging, possibly WHOI ROV and/or Navy AUV
Summary of other requirements and comments:  
Ship Request Identification
Type of Request: Primary Ship Use Request Status: Submitted
Request ID: 1003421 Created By: Larry A. Mayer
Date Last Modified: 4/9/2010 10:58:00 AM Date Submitted: 12/10/2009 3:16:00 PM
Requested Ship, Operating Days and Dates
Year: 2011 Ship/Facility: USCGC Healy
Optimum Start Date: 8/10/2011 Dates to Avoid: Looking for minimum ice window
 
 
Earliest Start Date: 8/1/2011 Multi-Ship Op: Yes
Latest Start Date: 8/20/2011 Other Ship(s): Coordinate with Canadian Icebreaker LSSL and potentially ODEN and Russian icebreaker

Operating Days Needed: Science Days Mob Days De-Mob Days Estimated Transit Days Total Days
39 1 1 5 46
Repeating Cruise?
(within same year)
No Interval:   # of Cruises:  

Description of Repeating cruise requirements:
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations:
Need multibeam sonar and ability to work in ice covered regions
Work Area for Cruise
Short Description of Op Area
for use in schedules:
A/M Ridge
Description of Op Area: Most work will be concentrated on region north of Chukchi Cap transitioning to Alpha/Mendeleev Ridge and Makarov Basin and possibly Lomonosov Ridge
Op Area Size/Dia.: 15,000 sq mile
 
  Lat/Long Marsden Grid Navy Op Area
Beginning
75° N / 150° W map
268 map
AR07 map
Ending
90° N / 170° W map
290 map
AR12 map
  Show Degrees Minutes    
Foreign Clearance and Permitting Requirements
Foreign Clearance Required? No Coastal States:
 Important Info on Foreign Research Clearances  

Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
No If yes, have you applied for the necessary permits through your export control office? No
 Questions about ITAR/EAR regulations?

Comments about foreign clearance requirements or
description of any other special permitting requirements
(e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.)
Port Calls
Requested Start Port Intermediate Port(s) Requested End Port
Barrow, AK, USA None Barrow, AK, USA
Explanation/justification for requested
ports and dates of intermediate stops
or to list additional port stops
 

 Important Info on Working in Foreign Ports

 
Science Party
Chief Scientist: Larry A. Mayer, UNH
# in Science Party 35 # of different science teams 1 # Marine Technicians to be
provided by ship operator:
(include in science party total)
10
Explanation of Science Party Requirements and Technician Requirements We will have mapping specialist and possibly ROV team from WHOI. If Navy AUV is brought along there will be a Navy AUV team
Instrumentation Requirements That Impact Scheduling Decisions
Selected Dynamic PositioningUnselected ADCPSelected MultibeamSelected Seismic
Selected Dredging/Coring/Large Dia. Trawl WireUnselected Stern A-frameUnselected Fiber Optic (.681)Unselected 0.680 Coax Wire
Unselected SCUBA DivingUnselected Radioisotope use - briefly describeUnselected NO Radioisotope use/Natural level workUnselected Other Operator Provided Inst. - Describe
1 PI-Provided Vans - briefly describe Unselected MOCNESS  
Explain Instrumentation or Capability
requirements that could affect choice
of ship in scheduling.

Multibeam is essential. ROV may require dynamic positioning. Dredging and coring will be backup to ROV sampling. Seismic is Knudsen chirp subbottom.

Major Ancillary Facilities (that require coordination of schedules with ship schedule)
Aircraft
Selected Helicopter Ops (USCG)Unselected Twin OtterUnselected Unmanned Aerial Systems (UAS) 
Autonomous Underwater Vehicle (AUV)
Selected Other AUVUnselected Sentry  
Coring Facility
Unselected Jumbo Piston CoringSelected Large Gravity Core Unselected MC800 multicorer w/ MISO camera/telemetryUnselected OSU Coring Facility (MARSSAM)
Unselected Other Large Coring FacilityUnselected WHOI Long Core  
Human Occupied Vehicle (HOV)
Unselected AlvinUnselected Clelia (HBOI)Unselected JSL I & II (HBOI)Unselected Other HOV
Other Facility
Unselected MISO Facility - deep-sea imagingUnselected Other FacilityUnselected Potential Fields Pool Equipment 
Remotely Operated Vehicle (ROV)
Selected JasonUnselected Other ROV  
Seismic Facility
Unselected Ocean Bottom Seismograph Instrument Center (OBSIC)Unselected Ocean Bottom Seismograph Instrument Pool (OBSIP)Unselected Ocean-Bottom Seismometer Program (UTIG)Unselected Other Seismic/OBS Facility
Unselected PASSCALUnselected Portable MCS groupUnselected Portable MCS/SCS groupUnselected U.S. Geological Survey Ocean Bottom Seismometer Facility (USGS at WHOI)
Towed Underwater Vehicle
Unselected ARGO IIUnselected Hawaii MR1 (HMRG)Unselected IMI12 (HMRG)Unselected IMI120 (HMRG - formerly DSL 120A)
Unselected IMI30 (HMRG)Unselected Other Towed Underwater VehicleUnselected Towfish 
UNOLS Van Pool
Unselected AUV Lab Van #1Unselected Clean Lab VanUnselected Cold Lab VanUnselected General Purpose Lab Van
Unselected Radioisotope Lab VanUnselected Wet Lab Van  
UNOLS Winch Pool
Unselected Mooring SpoolerUnselected Portable WinchUnselected Turn Table 
Explain Major Ancillary Facilities
Requirements and list description
and provider for "other" systems.
NAVY may deploy HUGIN AUV
WHOI ROV may be used

Expand request schedules  Associated Schedules

Expand request history Ship Request History