|
CCE-LTER II
-
2015
-
New Horizon
|
|
|
Project Title: |
Ecological Transitions in the California Current Ecosystem: CCE-LTER Phase II |
Project Status: |
Submitted |
Principal Investigator: |
Mark D. Ohman, SIO |
Project Institution: |
SIO |
Project ID: |
102310 |
Version #: |
1 |
Date Submitted: |
1/26/2010 9:32:00 PM |
Created By: |
Mark D. Ohman |
Date Last Modified: |
9/10/2015 7:41:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NSF/OCE/BIO - 1026607 - Funded |
Summary of Field Work: |
(1) Process cruises: Revelle-class vessel, in 2011, 2012, and 2014: Conduct Lagrangian, water-parcel tracking cruises to measure nutrient fluxes and plankton growth, grazing, predation, and sinking terms in different mesoscale features in the California Current System. Interdisciplinary team of biological, chemical, and physical oceanographers. Each of these 3 cruises needs to be in the early summer/late spring period of strongest mesoscale gradients in the region. Each will be of 30 days duration.
(2) Augmented CalCOFI: New Horizon-class vessel, in each of 6 years (2011, 2012, 2013, 2014, 2015, 2016): 2 supplemental days added to 4 CalCOFI cruises per year for additional sampling of microbial, other plankton, and fish populations. Work to be scheduled and coordinated with CalCOFI cruises.
(3) Mooring servicing: New Horizon-class vessel, in each of 6 years (2011-2016): 4 days per year for servicing CCE interdisciplinary biogeochemical moorings. |
Summary of Facility Requirements: |
(1) Process cruises (Revelle class vessel): Seasoar, Pinkel Doppler sonar, double 1 m2 MOCNESS with 202-µm nets and full sensors, fully configured CTD rosette, isotope vans, trace metal clean van. Other special equipment to be determined. High speed internet and berthing for minimum of 34 scientists required for each Revelle cruise. Science party will supply satellite-tracked drift arrays and autonomous sampling devices.
(2) Augmented CalCOFI (New Horizon class vessel): regular over-the-side sampling and laboratory processing equipment and vans. Oozeki fish trawl (or equivalent) will be provided by science party.
(3) Mooring servicing (New Horizon class vessel): standard A-frame, winches, navigation, echosounder, CTD rosette. |
Summary of other requirements and comments: |
For process cruises on R/V Revelle, reliable High Seas Net internet service will be required on all ship headings to ensure uninterrupted tracking of over-the-side drift arrays and autonomous vehicles. |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1003500 |
Created By: |
Mark D. Ohman |
Date Last Modified: |
1/26/2010 9:32:00 PM |
Date Submitted: |
1/26/2010 9:32:00 PM |
|
Year: |
2015
|
Ship/Facility: |
New Horizon
|
Optimum Start Date:
|
8/1/2015 |
Dates to Avoid: |
|
|
|
|
|
Earliest Start Date: |
|
Multi-Ship Op: |
No |
Latest Start Date: |
|
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
4 |
1 |
1 |
0 |
6 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
Dates tbd; depends on mooring servicing schedule |
|
Short Description of Op Area
for use in schedules: |
|
Description of Op Area: |
|
Op Area Size/Dia.: |
|
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
San Diego, CA, USA |
None |
San Diego, CA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Mark D. Ohman, SIO |
# in Science Party |
9 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
Mooring recovery and deployment team will require the assistance of a Restech. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
The R/V New Horizon is the minimum vessel suitable for these mooring operations because of the sea conditions in the Pt. Conception region.
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|