Turbulence in BBL
-
2011
-
Hugh R. Sharp
|
|
|
Project Title: |
Turbulence in the Inner Part of a Combined Wave-Current Coastal Bottom Boundary Layer |
Project Status: |
Submitted |
Principal Investigator: |
Joseph Katz, JHU |
Project Institution: |
JHU |
Project ID: |
102377 |
Version #: |
1 |
Date Submitted: |
2/12/2010 12:12:00 PM |
Created By: |
Joseph Katz |
Date Last Modified: |
6/29/2010 10:51:00 AM |
URI Serial #: |
None |
Funding Agencies: |
NSF/OCE/PO - 1031040 - Funded |
Summary of Field Work: |
Our objective is to measure the flow structure and turbulence in the bottom boundary layer (BBL) of the coastal ocean and study their dependence on circulation, wave field and bottom topography. High resolution measurements in two independent sample areas will be perform using Particle Image Velocimetry (PIV), but instrumentation includes also a sonar to map the bottom topography, an ADV, and other ancillary sensors. We will also use the research vessel’s ADCP, CTD and bottom sonar. To obtain the required range of Reynolds numbers, ratios of mean current to wave amplitude, orientation of waves relative to mean current, and orientation of both relative to bottom ripples, data will be acquired at several sites along the Atlantic Continental Shelf, from the NY Bight to the LEO-15 region. The NY Bight area offers sites with relatively high currents, while in the vicinity of LEO-15, wave-induced velocity and currents often have similar magnitude. |
Summary of Facility Requirements: |
The proposal vessel and timing are the RV Hugh Sharp in Spring/Summer of 2011 and 2012, for two weeks each time. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1003614 |
Created By: |
Joseph Katz |
Date Last Modified: |
2/12/2010 12:12:00 PM |
Date Submitted: |
2/12/2010 12:12:00 PM |
|
Year: |
2011
|
Ship/Facility: |
Hugh R. Sharp
|
Optimum Start Date:
|
5/9/2011 |
Dates to Avoid: |
|
|
|
|
|
Earliest Start Date: |
5/2/2011 |
Multi-Ship Op: |
No |
Latest Start Date: |
7/11/2011 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
12 |
2 |
1 |
1 |
16 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
|
|
Short Description of Op Area
for use in schedules: |
|
Description of Op Area: |
NY Bight and environs of LEO-15 |
Op Area Size/Dia.: |
20 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Lewes, DE, USA |
None |
Lewes, DE, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Joseph Katz, JHU |
# in Science Party |
8 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
|
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|