|
HUGIN Testing
-
2010
-
Robert Gordon Sproul
|
|
|
Project Title: |
Testing of HUGIN autonomous underwater vehicle (AUV) with synthetic aperture sonar and multibeam echo sounder. |
Project Status: |
Submitted |
Principal Investigator: |
Rich Patterson, KUTI |
Project Institution: |
KUTI |
Project ID: |
102536 |
Version #: |
2 |
Date Submitted: |
6/8/2010 5:00:00 PM |
Created By: |
Rich Patterson |
Date Last Modified: |
8/4/2010 5:14:00 PM |
URI Serial #: |
None |
Funding Agencies: |
OTHER - NONE - Funded |
Summary of Field Work: |
Testing of the accoustic systems installed on a HUGIN autonomous underwater vehicle, including the HISAS 1030 synthetic aperture sonar and EM 3002 multibeam echo sounder. Field work to take place off the coast of San Diego, CA. Testing will involve the collection of SAS imagery and SAS/Multibeam bathymetric data. In addition, some detection and possible classification of objects on the sea floor may be performed. |
Summary of Facility Requirements: |
- Vessel with open space on the back deck to accommodate (1) 20 foot ISO container, (1) 10 foot ISO container and (1) winch system for deployment of acoustic communication system. - Equipment requires both 220VAC and 440VAC power. - Facility for deploying 80 kg USBL transducer over the side of the vessel. - Crane for deploying acoustic communication sonar. - Dock-side crane capable of lifting approximately 6 metric tons. - Source of fresh water for vehicle wash down. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1003872 |
Created By: |
Rich Patterson |
Date Last Modified: |
8/4/2010 5:14:00 PM |
Date Submitted: |
6/8/2010 5:00:00 PM |
|
Year: |
2010
|
Ship/Facility: |
Robert Gordon Sproul
|
Optimum Start Date:
|
10/2/2010 |
Dates to Avoid: |
|
|
|
|
|
Earliest Start Date: |
10/2/2010 |
Multi-Ship Op: |
No |
Latest Start Date: |
10/3/2010 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
3 |
3 |
2 |
0 |
8 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
Ship has been verified to have the configuration and facilies necessary to perform the work. Dates coincide with an institution sponsored conference held in San Diego. Multiple persons from the conference will be attending the testing/demonstration of the HUGIN vehicle. |
|
Short Description of Op Area
for use in schedules: |
San Diego area |
Description of Op Area: |
Multiple op areas will be designated by US Navy for testing the vehicle off the coast of San Diego. All op areas are expected to be within 30 nm of San Diego harbor. |
Op Area Size/Dia.: |
30 nm |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
San Diego, CA, USA |
None |
San Diego, CA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Rich Patterson, KUTI |
# in Science Party |
15 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
Testing will take place only during the daytime hours, so the ship will be returning to port each day. Therefore, birthing is not required, and we would like to carry more than the normal science party complement for the Sproul. Should only require one operator provided technician for assistance in facilitizing equipment and for evolutions requiring the use of the ship's crane or over the side deployment equipment. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
2 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
None. All required instrumentation will be supplied by institution.
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
KUTI will be providing our own AUV system, including two ISO containers for storage and deployment of the system. Will need to coordinate the arrival of the KUTI supplied equipment with the ship's schedule. |
|