Project Title: |
Pioneer Sea Mount |
Project Status: |
Submitted |
Principal Investigator: |
James A. Mercer, UW_APL |
Project Institution: |
UW_APL |
Project ID: |
102781 |
Version #: |
1 |
Date Submitted: |
1/28/2011 5:44:00 PM |
Created By: |
James A. Mercer |
Date Last Modified: |
1/28/2011 5:44:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NAVY/ONR - N00014-08-1-0843 - Funded |
Summary of Field Work: |
Prior to the arrival on the Pioneer Sea Mount, a line basket with floats, recovery line, and acoustic releases will have been attached to the instrument that is to be recovered. Once on site, the releases will be triggered and the recovery line will be brought through a user supplied block on the A-frame. The line and instrument will be hauled aboard by a user supplied winch. The dimensions of the three-sided pyramid instrument are roughly 13 feet on a side. The instrument weighs roughly 12,000 pounds in air. |
Summary of Facility Requirements: |
Large vessel working A-frame. Clear after deck space for winch and power pack. Dynamic positioning. Ship's crane to load and off-load winch and power pack. Instrument will be partially disassembled for demob so that the ship's crane can handle the weight. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1004282 |
Created By: |
James A. Mercer |
Date Last Modified: |
1/28/2011 5:44:00 PM |
Date Submitted: |
1/28/2011 5:44:00 PM |
|
Year: |
2011
|
Ship/Facility: |
Thomas G. Thompson
|
Optimum Start Date:
|
7/28/2011 |
Dates to Avoid: |
Late fall and winter - weather |
|
|
|
|
Earliest Start Date: |
7/28/2011 |
Multi-Ship Op: |
No |
Latest Start Date: |
8/31/2011 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
5 |
1 |
1 |
6 |
13 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
Large UNOLS vessel required for A-frame capacity. Cannot begin before July because supporting recovery hardware will not be in place. Cannot start after September because of risk of bad weather. |
|
Short Description of Op Area
for use in schedules: |
|
Description of Op Area: |
|
Op Area Size/Dia.: |
|
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
37° 21' N
/
123° 27' W
map
|
|
|
Ending
|
37° 21' N
/
123° 27' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Seattle, WA, USA |
None |
Seattle, WA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Thompson will be in Seattle. De-mobe preferred in Seattle because of the size of recovered instrument. |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
James A. Mercer, UW_APL |
# in Science Party |
5 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
Science party will provide A-frame block and support rigging, and will operate the leased winch. Science party will also bring and operate acoustic location equipment. Ship technician to operate ship's A-frame and ship's crane. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
1 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|