Ship Request

STR Management has moved to MFP

The US Academic Research Fleet is moving to Marine Facilities Planning (MFP) for scheduling initially and eventually cruise planning.

For all NEW or RESUBMITTED Projects/Ship Time Requests, go to https://mfp.us and create a new SME. Some STRs for projects starting in 2022 and beyond have already been moved to Marine Facilities Planning (mfp.us). Check your MFP Science Portal for any projects that might already be moved. If you need to make edits to projects that begin in 2022 and beyond, please contact mfp@unols.org for assistance. Be sure to indicate the Project and STR IDs that you would like to edit. For more information on getting into MFP, see the More Information button below.

  OKMC-Moorings  -  2012  -  Global  
  Project Information  
Project Title: Studying the Origin of Kuroshio with an Array of ADCP-TC Moorings Project Status: Submitted
Principal Investigator: Ren-Chieh Lien, UW_APL Project Institution: UW_APL
Project ID: 102940 Version #: 3
Date Submitted: 5/21/2011 3:04:00 PM Created By: Ren-Chieh Lien
Date Last Modified: 4/26/2012 11:34:00 AM URI Serial #: None
Funding Agencies: NAVY/ONR - N00014-10-1-0397 - Funded
Summary of Field Work: Deep Ocean Surface/Subsurface Moorings and HPIES Deployment off Luzon
Summary of Facility Requirements:  
Summary of other requirements and comments: Scripps Sea Soar
Ship Request Identification
Type of Request: Primary Ship Use Request Status: Submitted
Request ID: 1004560 Created By: Ren-Chieh Lien
Date Last Modified: 4/26/2012 11:34:00 AM Date Submitted: 5/21/2011 3:04:00 PM
Requested Ship, Operating Days and Dates
Year: 2012 Ship/Facility: Global
Optimum Start Date: 8/1/2012 Dates to Avoid: The prefer range is 07/20-08/15 2012 because our moorings won't be available until July 2012 and the IOP will start on Aug. 2012.
 
 
Earliest Start Date: 7/20/2012 Multi-Ship Op: No
Latest Start Date: 8/15/2012 Other Ship(s):

Operating Days Needed: Science Days Mob Days De-Mob Days Estimated Transit Days Total Days
10 2 1 1 14
Repeating Cruise?
(within same year)
Yes Interval: 4 months # of Cruises: 4

Description of Repeating cruise requirements: Moorings will be serviced every four months.
HPIES data will be downloaded via acoustic modem every four months.
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations:
We will deploy four ATLAS-like surface (or subsurface) moorings and three HPIES. Large deck space will be needed.
We also would like to perform Scripp's SeaSoar survey. Roger Revelle has extensive experience deploying our moorings.
Therefore, the preferred RC would be Roger Revelle.
Work Area for Cruise
Short Description of Op Area
for use in schedules:
Luzon
Description of Op Area: NE of Luzon, Luzon Strait, Western Pacific
Op Area Size/Dia.: 200 x 200 nm
 
  Lat/Long Marsden Grid Navy Op Area
Beginning
18° N / 120° E map
61 map
IN02 map
Ending
22° N / 123° E map
96 map
NP10 map
  Show Degrees Minutes    
Foreign Clearance and Permitting Requirements
Foreign Clearance Required? Yes Coastal States:
 Important Info on Foreign Research Clearances  

Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
No If yes, have you applied for the necessary permits through your export control office? No
 Questions about ITAR/EAR regulations?

Comments about foreign clearance requirements or
description of any other special permitting requirements
(e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.)
Port Calls
Requested Start Port Intermediate Port(s) Requested End Port
None None None
Explanation/justification for requested
ports and dates of intermediate stops
or to list additional port stops
Kaohsiung-Kaohsiung

 Important Info on Working in Foreign Ports

 
Science Party
Chief Scientist: Ren-Chieh Lien, UW_APL
# in Science Party 20 # of different science teams 3 # Marine Technicians to be
provided by ship operator:
(include in science party total)
2
Explanation of Science Party Requirements and Technician Requirements
Instrumentation Requirements That Impact Scheduling Decisions
Selected Dynamic PositioningUnselected ADCPSelected MultibeamUnselected Seismic
Unselected Dredging/Coring/Large Dia. Trawl WireUnselected Stern A-frameUnselected Fiber Optic (.681)Unselected 0.680 Coax Wire
Unselected SCUBA DivingUnselected Radioisotope use - briefly describeUnselected NO Radioisotope use/Natural level workSelected Other Operator Provided Inst. - Describe
0 PI-Provided Vans - briefly describe Unselected MOCNESS  
Explain Instrumentation or Capability
requirements that could affect choice
of ship in scheduling.

Scripps SeaSoar group

Major Ancillary Facilities (that require coordination of schedules with ship schedule)
Aircraft
Unselected Helicopter Ops (USCG)Unselected Twin OtterUnselected Unmanned Aerial Systems (UAS) 
Autonomous Underwater Vehicle (AUV)
Unselected Other AUVUnselected Sentry  
Coring Facility
Unselected Jumbo Piston CoringUnselected Large Gravity Core Unselected MC800 multicorer w/ MISO camera/telemetryUnselected OSU Coring Facility (MARSSAM)
Unselected Other Large Coring FacilityUnselected WHOI Long Core  
Human Occupied Vehicle (HOV)
Unselected AlvinUnselected Clelia (HBOI)Unselected JSL I & II (HBOI)Unselected Other HOV
Other Facility
Unselected MISO Facility - deep-sea imagingUnselected Other FacilityUnselected Potential Fields Pool Equipment 
Remotely Operated Vehicle (ROV)
Unselected JasonUnselected Other ROV  
Seismic Facility
Unselected Ocean Bottom Seismograph Instrument Center (OBSIC)Unselected Ocean Bottom Seismograph Instrument Pool (OBSIP)Unselected Ocean-Bottom Seismometer Program (UTIG)Unselected Other Seismic/OBS Facility
Unselected PASSCALUnselected Portable MCS groupUnselected Portable MCS/SCS groupUnselected U.S. Geological Survey Ocean Bottom Seismometer Facility (USGS at WHOI)
Towed Underwater Vehicle
Unselected ARGO IIUnselected Hawaii MR1 (HMRG)Unselected IMI12 (HMRG)Unselected IMI120 (HMRG - formerly DSL 120A)
Unselected IMI30 (HMRG)Selected Other Towed Underwater VehicleUnselected Towfish 
UNOLS Van Pool
Unselected AUV Lab Van #1Unselected Clean Lab VanUnselected Cold Lab VanUnselected General Purpose Lab Van
Unselected Radioisotope Lab VanUnselected Wet Lab Van  
UNOLS Winch Pool
Unselected Mooring SpoolerUnselected Portable WinchUnselected Turn Table 
Explain Major Ancillary Facilities
Requirements and list description
and provider for "other" systems.

Expand request schedules  Associated Schedules

Expand request history Ship Request History