UAS Testing
-
2012
-
Robert Gordon Sproul
|
|
|
Project Title: |
UAS Testing |
Project Status: |
Submitted |
Principal Investigator: |
Arthur Arsenault, NGC |
Project Institution: |
NGC |
Project ID: |
103624 |
Version #: |
2 |
Date Submitted: |
10/2/2012 7:09:00 PM |
Created By: |
Arthur Arsenault |
Date Last Modified: |
11/15/2012 5:09:00 PM |
URI Serial #: |
None |
Funding Agencies: |
OTHER - Private Sector - Funded |
Summary of Field Work: |
Shipboard launch and recovery testing of Unmanned Aerial System |
Summary of Facility Requirements: |
Required ship space with flat deck to hold vehicle launcher and net recovery system. Also need space available for portable ground control station and tracking antennas. Will need use of cranes for loading hardware onto ship. Will need A-arms and cranes removed from deck with as much clean, flat deck space as possible. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1005738 |
Created By: |
Arthur Arsenault |
Date Last Modified: |
11/15/2012 5:09:00 PM |
Date Submitted: |
10/2/2012 7:09:00 PM |
|
Year: |
2012
|
Ship/Facility: |
Robert Gordon Sproul
|
Optimum Start Date:
|
10/26/2012 |
Dates to Avoid: |
Nov 3-4 Nov 17-18 Dec 1-2 Dec 15-16 |
|
|
|
|
Earliest Start Date: |
10/26/2012 |
Multi-Ship Op: |
No |
Latest Start Date: |
12/14/2012 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
2 |
1 |
0 |
0 |
3 |
Repeating Cruise?
(within same year) |
Yes |
Interval: |
When Available |
# of Cruises: |
3 |
|
Description of Repeating cruise requirements: |
Repeating cruises to lock in dates based on ship availability. Final testing date in December may not be necessary if Sproul can hold both net and launcher simultaneously. Will not be know until fit check is completed. |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
Testing must occur on weekends. |
|
Short Description of Op Area
for use in schedules: |
Camp Pendleton |
Description of Op Area: |
Testing within 1 mile off the coast of Camp Pendleton in San Diego. |
Op Area Size/Dia.: |
1 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
San Diego, CA, USA |
None |
San Diego, CA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
George Spongberg, NGC |
# in Science Party |
8 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
Science party does not need technician support other than crew required for vessel operations. All testing will be conducted by NGC team. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
Required coordination with Camp Pendleton for use of military airspace. Preliminary approval has been granted for all weekends through the end of 2012. Approval will be finalized once ship schedule is confirmed. |
|