Sentry Heat Flux
-
2013
-
Atlantis
|
|
|
Project Title: |
EAGER: Collaborative Research: Using Available Sentry AUV aboard R/V Atlantis to Measure Hydrothermal Heat Flux at Axial and Main Endeavour Fields |
Project Status: |
Submitted |
Principal Investigator: |
James C. Kinsey, WHOI |
Project Institution: |
WHOI |
Project ID: |
103737 |
Version #: |
2 |
Date Submitted: |
1/22/2013 10:43:00 AM |
Created By: |
James C. Kinsey |
Date Last Modified: |
5/28/2013 2:05:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NSF/OCE/MGG - 1337473 - Funded |
Summary of Field Work: |
Heat and volume flux measurements with the Sentry AUV at ASHES and MEF hydrothermal vent sites on an already scheduled cruise in Aug-Sept 2013. Sentry will already be on the ship. |
Summary of Facility Requirements: |
Require the following:
1) Sentry AUV with project specific instrumentation (provided by the PI) installed.
2) Lowered ADCP gear from the WHOI SSSG equipment pool installed on the CTD frame. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Ancillary |
Request Status: |
Submitted |
Request ID: |
1005954 |
Created By: |
James C. Kinsey |
Date Last Modified: |
2/25/2013 3:46:00 PM |
Date Submitted: |
1/22/2013 10:43:00 AM |
|
Year: |
2013
|
Ship/Facility: |
Atlantis
|
Optimum Start Date:
|
8/27/2013 |
Dates to Avoid: |
|
|
|
|
|
Earliest Start Date: |
|
Multi-Ship Op: |
No |
Latest Start Date: |
|
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
11 |
0 |
0 |
0 |
11 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
Using available Sentry and Atlantis night ops time during August-September 2013 cruise to JdF. Must be on this cruise in order to leverage available time. |
|
Short Description of Op Area
for use in schedules: |
Juan de Fuca |
Description of Op Area: |
ASHES and MEF vent fields (cruise ops already planned there) |
Op Area Size/Dia.: |
|
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
|
Foreign Clearance Required? |
Yes |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
None |
None |
None |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Same ports as already scheduled. |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
James C. Kinsey, WHOI |
# in Science Party |
1 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
Kinsey is the only participant requiring a bunk. Crone and Mittelsteadt are already aboard on another project. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
*** Tentatively planning 11 Sentry dives beyond the 3 already scheduled. Will be adding an ADV, 3-axis acclerometer, and another CTD to Sentry. *** Will require Lowered ADCP gear from the WHOI SSSG equipment pool. SSSGs will need to install and help operate but Kinsey will handle data processing. |
|