For all NEW or RESUBMITTED Projects/Ship Time Requests, go to https://mfp.us and create a new SME. Some STRs for projects starting in 2022 and beyond have already been moved to Marine Facilities Planning (mfp.us). Check your MFP Science Portal for any projects that might already be moved. If you need to make edits to projects that begin in 2022 and beyond, please contact mfp@unols.org for assistance. Be sure to indicate the Project and STR IDs that you would like to edit. For more information on getting into MFP, see the More Information button below.

  EBOB  -  2013  -  Roger Revelle  
  Project Information  
Project Title: Effects of Bay of Bengal Freshwater Flux on Indian Ocean Monsoon (EBOB) Project Status: Submitted
Principal Investigator: Hemantha Wijesekera, NRL_SSC Project Institution: NRL_SSC
Project ID: 104030 Version #: 1
Date Submitted: 8/7/2013 6:21:00 PM Created By: Hemantha Wijesekera
Date Last Modified: 8/7/2013 6:21:00 PM URI Serial #: None
Funding Agencies: NAVY/NRL - NONE - Funded
Summary of Field Work: Deploying six long-ranger ADCP deep moorings in southern Bay of Bengal east of Sri Lanka
Summary of Facility Requirements: CTD, ship ADCP, winches for mooring deployment
Summary of other requirements and comments:  
Ship Request Identification
Type of Request: Primary Ship Use Request Status: Submitted
Request ID: 1006447 Created By: Hemantha Wijesekera
Date Last Modified: 8/7/2013 6:21:00 PM Date Submitted: 8/7/2013 6:21:00 PM
Requested Ship, Operating Days and Dates
Year: 2013 Ship/Facility: Roger Revelle
Optimum Start Date: 12/15/2013 Dates to Avoid:  
 
 
Earliest Start Date: 12/14/2013 Multi-Ship Op: No
Latest Start Date: 12/16/2013 Other Ship(s):

Operating Days Needed: Science Days Mob Days De-Mob Days Estimated Transit Days Total Days
5 1 1 3 10
Repeating Cruise?
(within same year)
No Interval:   # of Cruises:  

Description of Repeating cruise requirements: Schedule the cruise after ASIRI Leg-II (ONR funded project)
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations:
This is also part of ONR funded DRI ASIRI. This is the only UNLOS ship availabe in the area during the time period. Request starting port Colombo and returning port Colombo; the science party is mainly from NRL, and if we travel to a different country's port we will have visa issues, therfore return to Colombo is important. It is possible that a couple of Sri Lankan scientists from NARA may join the cruise.
Work Area for Cruise
Short Description of Op Area
for use in schedules:
Bay of Bengal
Description of Op Area: Southen Bay of Bengal, east of Sri Lanka, in internaltional waters
Op Area Size/Dia.: 3x3 degree area
 
  Lat/Long Marsden Grid Navy Op Area
Beginning
5° N / 85.5° E map
28 map
IN02 map
Ending
8° N / 88.5° E map
28 map
IN02 map
  Show Degrees Minutes    
Foreign Clearance and Permitting Requirements
Foreign Clearance Required? Yes Coastal States:
 Important Info on Foreign Research Clearances  

Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
No If yes, have you applied for the necessary permits through your export control office? No
 Questions about ITAR/EAR regulations?

Comments about foreign clearance requirements or
description of any other special permitting requirements
(e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.)
Port Calls
Requested Start Port Intermediate Port(s) Requested End Port
Colombo, Sri Lanka None Colombo, Sri Lanka
Explanation/justification for requested
ports and dates of intermediate stops
or to list additional port stops
 

 Important Info on Working in Foreign Ports

 
Science Party
Chief Scientist: Hemantha Wijesekera, NRL_SSC
# in Science Party 7 # of different science teams 1 # Marine Technicians to be
provided by ship operator:
(include in science party total)
1
Explanation of Science Party Requirements and Technician Requirements Deploying 6 long-ranger sub-surface moorings with 4500lb anchors. Line mooring length of about 3800 m. We are planing on deploying these moorings in day and nighttime hours. CTD and ship ADCP surveys with any remaining time.
Instrumentation Requirements That Impact Scheduling Decisions
Unselected Dynamic PositioningUnselected ADCPUnselected MultibeamUnselected Seismic
Unselected Dredging/Coring/Large Dia. Trawl WireUnselected Stern A-frameUnselected Fiber Optic (.681)Unselected 0.680 Coax Wire
Unselected SCUBA DivingUnselected Radioisotope use - briefly describeUnselected NO Radioisotope use/Natural level workUnselected Other Operator Provided Inst. - Describe
0 PI-Provided Vans - briefly describe Unselected MOCNESS  
Explain Instrumentation or Capability
requirements that could affect choice
of ship in scheduling.

Major Ancillary Facilities (that require coordination of schedules with ship schedule)
Aircraft
Unselected Helicopter Ops (USCG)Unselected Twin OtterUnselected Unmanned Aerial Systems (UAS) 
Autonomous Underwater Vehicle (AUV)
Unselected Other AUVUnselected Sentry  
Coring Facility
Unselected Jumbo Piston CoringUnselected Large Gravity Core Unselected MC800 multicorer w/ MISO camera/telemetryUnselected OSU Coring Facility (MARSSAM)
Unselected Other Large Coring FacilityUnselected WHOI Long Core  
Human Occupied Vehicle (HOV)
Unselected AlvinUnselected Clelia (HBOI)Unselected JSL I & II (HBOI)Unselected Other HOV
Other Facility
Unselected MISO Facility - deep-sea imagingUnselected Other FacilityUnselected Potential Fields Pool Equipment 
Remotely Operated Vehicle (ROV)
Unselected JasonUnselected Other ROV  
Seismic Facility
Unselected Ocean Bottom Seismograph Instrument Center (OBSIC)Unselected Ocean Bottom Seismograph Instrument Pool (OBSIP)Unselected Ocean-Bottom Seismometer Program (UTIG)Unselected Other Seismic/OBS Facility
Unselected PASSCALUnselected Portable MCS groupUnselected Portable MCS/SCS groupUnselected U.S. Geological Survey Ocean Bottom Seismometer Facility (USGS at WHOI)
Towed Underwater Vehicle
Unselected ARGO IIUnselected Hawaii MR1 (HMRG)Unselected IMI12 (HMRG)Unselected IMI120 (HMRG - formerly DSL 120A)
Unselected IMI30 (HMRG)Unselected Other Towed Underwater VehicleUnselected Towfish 
UNOLS Van Pool
Unselected AUV Lab Van #1Unselected Clean Lab VanUnselected Cold Lab VanUnselected General Purpose Lab Van
Unselected Radioisotope Lab VanUnselected Wet Lab Van  
UNOLS Winch Pool
Unselected Mooring SpoolerUnselected Portable WinchUnselected Turn Table 
Explain Major Ancillary Facilities
Requirements and list description
and provider for "other" systems.

Expand request schedules  Associated Schedules

Expand request history Ship Request History