EBOB
-
2013
-
Roger Revelle
|
|
|
Project Title: |
Effects of Bay of Bengal Freshwater Flux on Indian Ocean Monsoon (EBOB) |
Project Status: |
Submitted |
Principal Investigator: |
Hemantha Wijesekera, NRL_SSC |
Project Institution: |
NRL_SSC |
Project ID: |
104030 |
Version #: |
1 |
Date Submitted: |
8/7/2013 6:21:00 PM |
Created By: |
Hemantha Wijesekera |
Date Last Modified: |
8/7/2013 6:21:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NAVY/NRL - NONE - Funded |
Summary of Field Work: |
Deploying six long-ranger ADCP deep moorings in southern Bay of Bengal east of Sri Lanka |
Summary of Facility Requirements: |
CTD, ship ADCP, winches for mooring deployment |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1006447 |
Created By: |
Hemantha Wijesekera |
Date Last Modified: |
8/7/2013 6:21:00 PM |
Date Submitted: |
8/7/2013 6:21:00 PM |
|
Year: |
2013
|
Ship/Facility: |
Roger Revelle
|
Optimum Start Date:
|
12/15/2013 |
Dates to Avoid: |
|
|
|
|
|
Earliest Start Date: |
12/14/2013 |
Multi-Ship Op: |
No |
Latest Start Date: |
12/16/2013 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
5 |
1 |
1 |
3 |
10 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
Schedule the cruise after ASIRI Leg-II (ONR funded project) |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
This is also part of ONR funded DRI ASIRI. This is the only UNLOS ship availabe in the area during the time period. Request starting port Colombo and returning port Colombo; the science party is mainly from NRL, and if we travel to a different country's port we will have visa issues, therfore return to Colombo is important. It is possible that a couple of Sri Lankan scientists from NARA may join the cruise. |
|
Short Description of Op Area
for use in schedules: |
Bay of Bengal |
Description of Op Area: |
Southen Bay of Bengal, east of Sri Lanka, in internaltional waters |
Op Area Size/Dia.: |
3x3 degree area |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
Yes |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Colombo, Sri Lanka |
None |
Colombo, Sri Lanka |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Hemantha Wijesekera, NRL_SSC |
# in Science Party |
7 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
Deploying 6 long-ranger sub-surface moorings with 4500lb anchors. Line mooring length of about 3800 m. We are planing on deploying these moorings in day and nighttime hours. CTD and ship ADCP surveys with any remaining time. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|