|
River plume mixing
-
2015
-
Savannah
|
|
|
Project Title: |
Collaborative Research: Circulation and Mixing in a Coastally Trapped River Plume. |
Project Status: |
Submitted |
Principal Investigator: |
Robert Chant, Rutgers_IMCS |
Project Institution: |
Rutgers_IMCS |
Project ID: |
104411 |
Version #: |
1 |
Date Submitted: |
6/9/2014 1:13:00 PM |
Created By: |
Robert Chant |
Date Last Modified: |
7/3/2014 8:55:00 AM |
URI Serial #: |
None |
Funding Agencies: |
NSF/OCE/PO - 1334231 - Funded |
Summary of Field Work: |
Deployment of 10 moorings on the inner shelf near Duck NC and CTD/ADCP surveys of the inner shelf |
Summary of Facility Requirements: |
We will be using the A Frame to deploy moorings. We will also be mounting an ADCP to the side of the ship to obtain near-surface current meter measurements and will need to discuss details of this set-up with the ship's engineers. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1007040 |
Created By: |
Robert Chant |
Date Last Modified: |
6/9/2014 1:13:00 PM |
Date Submitted: |
6/9/2014 1:13:00 PM |
|
Year: |
2015
|
Ship/Facility: |
Savannah
|
Optimum Start Date:
|
6/26/2015 |
Dates to Avoid: |
|
|
|
|
|
Earliest Start Date: |
6/26/2015 |
Multi-Ship Op: |
No |
Latest Start Date: |
7/10/2015 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
5 |
1 |
1 |
1 |
8 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
These dates provide the most likely conditions to capture coastally trapped currents due to the seasonality of the winds and river discharge |
|
Short Description of Op Area
for use in schedules: |
|
Description of Op Area: |
|
Op Area Size/Dia.: |
|
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
36° 48' N
/
75° 48' W
map
|
|
|
Ending
|
36° 48' N
/
75° 48' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Norfolk, VA, USA |
None |
Norfolk, VA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Robert Chant, Rutgers_IMCS |
# in Science Party |
6 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
|
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|