For all NEW or RESUBMITTED Projects/Ship Time Requests, go to https://mfp.us and create a new SME. Some STRs for projects starting in 2022 and beyond have already been moved to Marine Facilities Planning (mfp.us). Check your MFP Science Portal for any projects that might already be moved. If you need to make edits to projects that begin in 2022 and beyond, please contact mfp@unols.org for assistance. Be sure to indicate the Project and STR IDs that you would like to edit. For more information on getting into MFP, see the More Information button below.

  ASIRI-EBOB  -  2015  -  Roger Revelle  
  Project Information  
Project Title: The Air-Sea Interaction in the Northern Indian Ocean (ASIRI) ---
The Effects of Bay of Bengal Freshwater Flux on Indian Ocean Monsoon (EBOB)
Project Status: Submitted
Principal Investigator: Hemantha Wijesekera, NRL_SSC Project Institution: NRL_SSC
Project ID: 104560 Version #: 1
Date Submitted: 8/15/2014 10:57:00 AM Created By: Hemantha Wijesekera
Date Last Modified: 8/15/2014 10:57:00 AM URI Serial #: None
Funding Agencies: NAVY/ONR - NONE - Funded
NAVY/NRL - NONE - Funded
Summary of Field Work: Recovery of six deep sub-surface ADCP/string moorings in the southern Bay of Bengal (located 5-8N, 85.5-89E). The moorings were deployed on December 2013 using R/V Roger Revelle. Will conduct CTD surfvey after recovery of moorings.
Summary of Facility Requirements: winch (TSP), CTD with bottles, shipboard ADCP and meteorological data
Summary of other requirements and comments: Schedule after Jennifer MacKinnon cruise in Bay of Bengal in 2015.
Ship Request Identification
Type of Request: Primary Ship Use Request Status: Submitted
Request ID: 1007307 Created By: Hemantha Wijesekera
Date Last Modified: 8/15/2014 10:57:00 AM Date Submitted: 8/15/2014 10:57:00 AM
Requested Ship, Operating Days and Dates
Year: 2015 Ship/Facility: Roger Revelle
Optimum Start Date: 8/26/2015 Dates to Avoid: prefer to start the cruise before ending FY15 funding cycle (sep 30 2015).
 
 
Earliest Start Date: 8/15/2015 Multi-Ship Op: No
Latest Start Date: 9/4/2015 Other Ship(s):

Operating Days Needed: Science Days Mob Days De-Mob Days Estimated Transit Days Total Days
9 1 1 3 14
Repeating Cruise?
(within same year)
No Interval:   # of Cruises:  

Description of Repeating cruise requirements:
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations:
All six moorings have been in water nore than 1 and half years by the time when we will pick them up, and batteries in moored ADCPs will last until July 2015. Moorings are 90 nm apart or 8 hours transit time between two moorings. Please schedule after Jenifer MacKinnon's, J/SIO -- ASIRI cruise in Bay of Bengal. Transit from another foreign port to the requested Colombo port is not included in the estimated transit time above.
Work Area for Cruise
Short Description of Op Area
for use in schedules:
Bay of Bengal
Description of Op Area: International waters east of Sri Lanka -- southern Bay of Bengal; mooring locations; 8N,85 30'E --- 8N, 88 30'E -- 5N 85 30'E
Op Area Size/Dia.: 270 nm x 270 nm
 
  Lat/Long Marsden Grid Navy Op Area
Beginning
IN02 map
Ending
IN02 map
Foreign Clearance and Permitting Requirements
Foreign Clearance Required? No Coastal States:
 Important Info on Foreign Research Clearances  

Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
No If yes, have you applied for the necessary permits through your export control office? No
 Questions about ITAR/EAR regulations?

Comments about foreign clearance requirements or
description of any other special permitting requirements
(e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.)
Port Calls
Requested Start Port Intermediate Port(s) Requested End Port
Colombo, Sri Lanka None Colombo, Sri Lanka
Explanation/justification for requested
ports and dates of intermediate stops
or to list additional port stops
All of our mooring gear and tools (except anchors) were brought to Colombo, Sri Lanka through ATA Carnet (Nov 2013), and all the instruments under the carnet must be shipped back to US from Colombo, Sri Lanka.

 Important Info on Working in Foreign Ports

 
Science Party
Chief Scientist: Hemantha Wijesekera, NRL_SSC
# in Science Party 15 # of different science teams 1 # Marine Technicians to be
provided by ship operator:
(include in science party total)
1
Explanation of Science Party Requirements and Technician Requirements We may operate 24 hours in some days; at least one Res. Tech and one compute tech. are required, We will use significant sections of the back deck. TSP winch from the UNOLS winch pool. Several CTD casts with bolltes, and some bio-optical/VMP profiling and plankton tows (upper 50 m), depending upon the availibity of time after the recovery of moorings..
Instrumentation Requirements That Impact Scheduling Decisions
Unselected Dynamic PositioningSelected ADCPSelected MultibeamUnselected Seismic
Unselected Dredging/Coring/Large Dia. Trawl WireUnselected Stern A-frameUnselected Fiber Optic (.681)Unselected 0.680 Coax Wire
Unselected SCUBA DivingUnselected Radioisotope use - briefly describeUnselected NO Radioisotope use/Natural level workUnselected Other Operator Provided Inst. - Describe
0 PI-Provided Vans - briefly describe Unselected MOCNESS  
Explain Instrumentation or Capability
requirements that could affect choice
of ship in scheduling.

we need a RR class reserach ship to pick up deep moorings.

Major Ancillary Facilities (that require coordination of schedules with ship schedule)
Aircraft
Unselected Helicopter Ops (USCG)Unselected Twin OtterUnselected Unmanned Aerial Systems (UAS) 
Autonomous Underwater Vehicle (AUV)
Unselected Other AUVUnselected Sentry  
Coring Facility
Unselected Jumbo Piston CoringUnselected Large Gravity Core Unselected MC800 multicorer w/ MISO camera/telemetryUnselected OSU Coring Facility (MARSSAM)
Unselected Other Large Coring FacilityUnselected WHOI Long Core  
Human Occupied Vehicle (HOV)
Unselected AlvinUnselected Clelia (HBOI)Unselected JSL I & II (HBOI)Unselected Other HOV
Other Facility
Unselected MISO Facility - deep-sea imagingUnselected Other FacilityUnselected Potential Fields Pool Equipment 
Remotely Operated Vehicle (ROV)
Unselected JasonUnselected Other ROV  
Seismic Facility
Unselected Ocean Bottom Seismograph Instrument Center (OBSIC)Unselected Ocean Bottom Seismograph Instrument Pool (OBSIP)Unselected Ocean-Bottom Seismometer Program (UTIG)Unselected Other Seismic/OBS Facility
Unselected PASSCALUnselected Portable MCS groupUnselected Portable MCS/SCS groupUnselected U.S. Geological Survey Ocean Bottom Seismometer Facility (USGS at WHOI)
Towed Underwater Vehicle
Unselected ARGO IIUnselected Hawaii MR1 (HMRG)Unselected IMI12 (HMRG)Unselected IMI120 (HMRG - formerly DSL 120A)
Unselected IMI30 (HMRG)Unselected Other Towed Underwater VehicleUnselected Towfish 
UNOLS Van Pool
Unselected AUV Lab Van #1Unselected Clean Lab VanUnselected Cold Lab VanUnselected General Purpose Lab Van
Unselected Radioisotope Lab VanUnselected Wet Lab Van  
UNOLS Winch Pool
Unselected Mooring SpoolerSelected Portable WinchUnselected Turn Table 
Explain Major Ancillary Facilities
Requirements and list description
and provider for "other" systems.

Expand request schedules  Associated Schedules