Ship Request

STR Management has moved to MFP

The US Academic Research Fleet is moving to Marine Facilities Planning (MFP) for scheduling initially and eventually cruise planning.

For all NEW or RESUBMITTED Projects/Ship Time Requests, go to https://mfp.us and create a new SME. Some STRs for projects starting in 2022 and beyond have already been moved to Marine Facilities Planning (mfp.us). Check your MFP Science Portal for any projects that might already be moved. If you need to make edits to projects that begin in 2022 and beyond, please contact mfp@unols.org for assistance. Be sure to indicate the Project and STR IDs that you would like to edit. For more information on getting into MFP, see the More Information button below.

  DON oxidation  -  2016  -  Savannah  
  Project Information  
Project Title: Direct Oxidation of Organic Nitrogen by Marine Ammonia Oxidizing Organisms Project Status: Submitted
Principal Investigator: James Hollibaugh, Georgia Project Institution: Georgia
Project ID: 104733 Version #: 1
Date Submitted: 2/9/2015 4:00:00 PM Created By: James Hollibaugh
Date Last Modified: 6/19/2015 4:06:00 PM URI Serial #: None
Funding Agencies: NSF/OCE/CO - 1538677 - Funded
Summary of Field Work: One transect, 2 days of shiptime, off the coast of Georgia from Gray's Reef NMS to the shelf break in August of either 2016 or 2017. Collect water column samples with Niskins, map environmental variables.
Summary of Facility Requirements: CTD rosette with 10 L Niskin or GoFlo bottles, underway data system, lab space
Summary of other requirements and comments:  
Ship Request Identification
Type of Request: Primary Ship Use Request Status: Submitted
Request ID: 1007563 Created By: James Hollibaugh
Date Last Modified: 2/9/2015 4:00:00 PM Date Submitted: 2/9/2015 4:00:00 PM
Requested Ship, Operating Days and Dates
Year: 2016 Ship/Facility: Savannah
Optimum Start Date: 8/10/2016 Dates to Avoid: Needs to be mid-summer: mid-August to mid-September to catch the peak of the annual Thaumarchaeota bloom
 
 
Earliest Start Date: 8/10/2016 Multi-Ship Op: No
Latest Start Date: 8/20/2016 Other Ship(s):

Operating Days Needed: Science Days Mob Days De-Mob Days Estimated Transit Days Total Days
2 1 0 0 3
Repeating Cruise?
(within same year)
No Interval:   # of Cruises:  

Description of Repeating cruise requirements:
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations:
Savannah is the ideal vessel for this due to home port, size/draft and lab capabilities. I need one transect to the shelf break to sample the oxygen minimum zone in the slope water.
Work Area for Cruise
Short Description of Op Area
for use in schedules:
 
Description of Op Area:
Op Area Size/Dia.:  
 
  Lat/Long Marsden Grid Navy Op Area
Beginning
31.98981° N / 81.022849° W map
117 map
NA06 map
Ending
31.98981° N / 81.022849° W map
117 map
NA06 map
  Show Degrees Minutes    
Foreign Clearance and Permitting Requirements
Foreign Clearance Required? No Coastal States:
 Important Info on Foreign Research Clearances  

Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
No If yes, have you applied for the necessary permits through your export control office? No
 Questions about ITAR/EAR regulations?

Comments about foreign clearance requirements or
description of any other special permitting requirements
(e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.)
Port Calls
Requested Start Port Intermediate Port(s) Requested End Port
None None None
Explanation/justification for requested
ports and dates of intermediate stops
or to list additional port stops
 

 Important Info on Working in Foreign Ports

 
Science Party
Chief Scientist: James Hollibaugh, Georgia
# in Science Party 4 # of different science teams 1 # Marine Technicians to be
provided by ship operator:
(include in science party total)
1
Explanation of Science Party Requirements and Technician Requirements Need help with sample processing, operation shipboard logging systems. Additional berths available for other projects on a not-to-conflict basis
Instrumentation Requirements That Impact Scheduling Decisions
Unselected Dynamic PositioningSelected ADCPUnselected MultibeamUnselected Seismic
Unselected Dredging/Coring/Large Dia. Trawl WireUnselected Stern A-frameUnselected Fiber Optic (.681)Unselected 0.680 Coax Wire
Unselected SCUBA DivingUnselected Radioisotope use - briefly describeSelected NO Radioisotope use/Natural level workSelected Other Operator Provided Inst. - Describe
0 PI-Provided Vans - briefly describe Unselected MOCNESS  
Explain Instrumentation or Capability
requirements that could affect choice
of ship in scheduling.

Inline data acquisition system CTD, chlorophyll/CDOM fluorescence
Niskin sampling rosette with CTD

Major Ancillary Facilities (that require coordination of schedules with ship schedule)
Aircraft
Unselected Helicopter Ops (USCG)Unselected Twin OtterUnselected Unmanned Aerial Systems (UAS) 
Autonomous Underwater Vehicle (AUV)
Unselected Other AUVUnselected Sentry  
Coring Facility
Unselected Jumbo Piston CoringUnselected Large Gravity Core Unselected MC800 multicorer w/ MISO camera/telemetryUnselected OSU Coring Facility (MARSSAM)
Unselected Other Large Coring FacilityUnselected WHOI Long Core  
Human Occupied Vehicle (HOV)
Unselected AlvinUnselected Clelia (HBOI)Unselected JSL I & II (HBOI)Unselected Other HOV
Other Facility
Unselected MISO Facility - deep-sea imagingUnselected Other FacilityUnselected Potential Fields Pool Equipment 
Remotely Operated Vehicle (ROV)
Unselected JasonUnselected Other ROV  
Seismic Facility
Unselected Ocean Bottom Seismograph Instrument Center (OBSIC)Unselected Ocean Bottom Seismograph Instrument Pool (OBSIP)Unselected Ocean-Bottom Seismometer Program (UTIG)Unselected Other Seismic/OBS Facility
Unselected PASSCALUnselected Portable MCS groupUnselected Portable MCS/SCS groupUnselected U.S. Geological Survey Ocean Bottom Seismometer Facility (USGS at WHOI)
Towed Underwater Vehicle
Unselected ARGO IIUnselected Hawaii MR1 (HMRG)Unselected IMI12 (HMRG)Unselected IMI120 (HMRG - formerly DSL 120A)
Unselected IMI30 (HMRG)Unselected Other Towed Underwater VehicleUnselected Towfish 
UNOLS Van Pool
Unselected AUV Lab Van #1Unselected Clean Lab VanUnselected Cold Lab VanUnselected General Purpose Lab Van
Unselected Radioisotope Lab VanUnselected Wet Lab Van  
UNOLS Winch Pool
Unselected Mooring SpoolerUnselected Portable WinchUnselected Turn Table 
Explain Major Ancillary Facilities
Requirements and list description
and provider for "other" systems.

Expand request schedules  Associated Schedules

Expand request history Ship Request History