ACO: O&M2
-
2017
-
Kilo Moana
|
|
|
Project Title: |
ALOHA Cabled Observatory Continuing Operations and Maintenance |
Project Status: |
Submitted |
Principal Investigator: |
Bruce M. Howe, UH_SOEST |
Project Institution: |
UH_SOEST |
Project ID: |
104780 |
Version #: |
2 |
Date Submitted: |
2/18/2015 6:41:00 PM |
Created By: |
Bruce M. Howe |
Date Last Modified: |
1/31/2018 12:09:00 AM |
URI Serial #: |
None |
Funding Agencies: |
NSF/OCE/OTIC - 1539244 - Funded |
Summary of Field Work: |
Project will conduct operations and maintenance (O&M) activities on the ALOHA Cabled Observatory (ACO). This is the second O&M grant.
Year 1 - 2016: At Station ALOHA and the ACO, Deploy Basic Sensor Package 2 (BSP2) and Secondary Node 1 (SN1). Recover LIGHT1. Perform other service as required.
The cruise may be extended if other funded projects are ready to deploy.
This cruise/activity will repeat on an annual basis, with details changing.
Year 2: 2017 O&M
Year 3: 2018 O&M
Year 4: 2019 O&M
Year 5: 2020 O&M |
Summary of Facility Requirements: |
Class-A ship (Kilo-Moana, Thompson or larger), ROV to work at 4720 m. Deck space for ROV vans and deck equipment. Room for science party of at least 22. |
Summary of other requirements and comments: |
We expect the UH ROV Lu'ukai to be on-line by the time these cruises take place. If not, ROV Jason will be backup, subject to coordination and consultation with NSF.
We are amenable to sharing ship time with other parties, especially those with ACO work. |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1007645 |
Created By: |
Bruce M. Howe |
Date Last Modified: |
1/31/2018 12:09:00 AM |
Date Submitted: |
2/18/2015 6:41:00 PM |
|
Year: |
2017
|
Ship/Facility: |
Kilo Moana
|
Optimum Start Date:
|
5/10/2017 |
Dates to Avoid: |
The operation is very weather and sea dependent, largely because of ROV operations. |
|
|
|
|
Earliest Start Date: |
5/1/2017 |
Multi-Ship Op: |
No |
Latest Start Date: |
6/30/2017 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
4 |
2 |
1 |
1 |
8 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
May - June have the best combination of weather and seas for this area, increasing probability of success.
We are amenable working with other investigators (within limits of personnel time) |
|
Short Description of Op Area
for use in schedules: |
Station ALOHA |
Description of Op Area: |
Station ALOHA (22 45N, 158 00W) is the site of the HOT oceanographic program about 100 km north of Oahu. |
Op Area Size/Dia.: |
2 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
22° 45' N
/
158° 0' W
map
|
|
|
Ending
|
22° 45' N
/
158° 0' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Honolulu, HI, USA |
None |
Honolulu, HI, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Bruce M. Howe, UH_SOEST |
# in Science Party |
20 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
2 |
Explanation of Science Party Requirements and Technician Requirements |
|
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
We expect the UH ROV to be on-line by the time these cruises take place. ROV Jason would be a backup (in consultation with NSF). |
|