Project Title: |
Undersea Warfare Training Range JAX OPAREA Trunk Cable Corridor Re-Survey Rev D |
Project Status: |
Submitted |
Principal Investigator: |
Chris W. Freeman, geodynamicsgroup |
Project Institution: |
geodynamicsgroup |
Project ID: |
104873 |
Version #: |
1 |
Date Submitted: |
5/19/2015 11:21:00 AM |
Created By: |
Chris W. Freeman |
Date Last Modified: |
5/19/2015 11:21:00 AM |
URI Serial #: |
None |
Funding Agencies: |
NAVY/NUWC - 21311010D - Funded |
Summary of Field Work: |
To acquire approximately 750 line kilometers of multibeam bathymetry, sidescan sonar, CHIRP sub-bottom and magnetometer data to characterize the seafloor of the proposed trunk cable corridor for the USWTR offshore of Jacksonville FL. Data will be used to verify the optimal route for the cable. |
Summary of Facility Requirements: |
We will need one vessel supplied ET and MET data following the cruise. |
Summary of other requirements and comments: |
We will need installation of hydro winch and possible fabrication for USBL mounting. The marine ops manager has this information as well. |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1007811 |
Created By: |
Chris W. Freeman |
Date Last Modified: |
5/19/2015 11:21:00 AM |
Date Submitted: |
5/19/2015 11:21:00 AM |
|
Year: |
2015
|
Ship/Facility: |
Savannah
|
Optimum Start Date:
|
10/26/2015 |
Dates to Avoid: |
We have a dead stop date of Nov 15 due to Navy req on whale interactions. We need 3 days of mob, 7 days of ops w/ transits, 1 day demob and we have 2 weather days scheduled for a total of 13 days. In the event we run into an issue and the Navy will extend funding we would like to have as much time before Nov 15 as possible |
|
|
|
|
Earliest Start Date: |
10/28/2015 |
Multi-Ship Op: |
No |
Latest Start Date: |
10/30/2015 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
7 |
3 |
1 |
2 |
13 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
|
|
Short Description of Op Area
for use in schedules: |
JAX Florida |
Description of Op Area: |
Navy USWTR Trunk Cable Corridor. From approx 20m of water to 150m of water at shelf break. |
Op Area Size/Dia.: |
~300m wide 740 line km's |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
30.25° N
/
81.283333° W
map
30° 15' N
/
81° 16.99998' W
map
|
|
|
Ending
|
30.15° N
/
80.066667° W
map
30° 9' N
/
80° 4.00002' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
None |
None |
None |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
There should be no call to port unless necessary for weather stand down. It would be helpful for the ship to line up an emergency staging area inside the inlet at Mayport. |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Chris W. Freeman, geodynamicsgroup |
# in Science Party |
15 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
2 rotating 24 for MBES, 2 rotating 24 hr for SSS, 2 rotating 24 for Mag and sub-bottom, 2 rotating 24 to process, 1 lead, 1 MMO, 4 client reps (this may change to 3?). Only need tech for basic ET needs. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
We have all equipment needed.
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|