Brothers Volcano
-
2017
-
Global
|
|
|
Project Title: |
Collaborative Research: Hydrothermal and Microbial Investigations of the Active Brothers Volcano in the Kermadec Arc |
Project Status: |
Submitted |
Principal Investigator: |
Susan Humphris, WHOI |
Project Institution: |
WHOI |
Project ID: |
104969 |
Version #: |
1 |
Date Submitted: |
8/7/2015 12:08:00 PM |
Created By: |
Susan Humphris |
Date Last Modified: |
3/9/2016 4:52:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NSF/OCE/MGG - 1558356 - Funded |
Summary of Field Work: |
the proposal is to map, sample and document the geology and microbiology of the hydrothermal vent systems present within the caldera of Brothers volcano in the Kermadec arc. We propose 16 days of ROV time to collect rocks, mineralized samples, microbiology, push cores, as well as carry out geophysical transects for conductive heat flux, microbathymetry and magnetics. An IODP proposal to drill Brothers volcano has been forwarded for scheduling with the most likely timeframe being 2018. |
Summary of Facility Requirements: |
The project requires a ship with ROV capability including USBL navigation and dynamic positioning. The ROV needs to operate within an active hydrothermal vent field and caldera of an underwater volcano ca. 2000m depth range. We require 18 days on station (including 2 days contingency) with two transit days from New Zealand. We are requesting ROV Jason and a UNOLS vessel capable of supporting ROV operations. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1007978 |
Created By: |
Susan Humphris |
Date Last Modified: |
8/7/2015 12:08:00 PM |
Date Submitted: |
8/7/2015 12:08:00 PM |
|
Year: |
2017
|
Ship/Facility: |
Global
|
Optimum Start Date:
|
1/15/2017 |
Dates to Avoid: |
Southern hemisphere winter months May-September |
|
|
|
|
Earliest Start Date: |
11/1/2016 |
Multi-Ship Op: |
No |
Latest Start Date: |
3/31/2017 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
18 |
2 |
2 |
2 |
24 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
|
|
Short Description of Op Area
for use in schedules: |
Kermadec Arc |
Description of Op Area: |
Brothers Volcano, Kermadec Arc |
Op Area Size/Dia.: |
10 x 10 nm |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
34° 48' S
/
179° 6' E
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
Yes |
Coastal States:
New Zealand |
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Auckland, New Zealand |
None |
Auckland, New Zealand |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Susan Humphris, WHOI |
# in Science Party |
18 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
7 |
Explanation of Science Party Requirements and Technician Requirements |
|
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|