Project Title: |
Shipboard Scientific Support Equipment: Oceanographic Cable |
Project Status: |
Submitted |
Principal Investigator: |
Richard Trask, WHOI |
Project Institution: |
WHOI |
Project ID: |
105108 |
Version #: |
1 |
Date Submitted: |
12/8/2015 3:17:00 PM |
Created By: |
Richard Trask |
Date Last Modified: |
12/8/2015 3:17:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NSF/OCE - 822952SP - Funded |
Summary of Field Work: |
To test several candidate synthetic tension members in a coring application. |
Summary of Facility Requirements: |
Coring operations will be conducted by the OSU Coring group as a way to test several synthetic tension members. The 9/16" trawl wire will need to be removed from the trawl winch and a synthetic rope wound onto the winch. The synthetic rope will be used instead of the wire rope to conduct the coring operations. Winch tension data for max load at pull out will need to be monitored. We also will need to evaluate the traction winch sheaves and fairlead blocks to make sure they are compatible with synthetic rope use. Cleaning and smoothing of the sheave grooves may be necessary. If level wind speed can be increased to increase the angle of each fleet relative to the adjacent fleets it may decrease the tendency of the rope to knife in. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1008186 |
Created By: |
Richard Trask |
Date Last Modified: |
12/8/2015 3:17:00 PM |
Date Submitted: |
12/8/2015 3:17:00 PM |
|
Year: |
2016
|
Ship/Facility: |
Endeavor
|
Optimum Start Date:
|
4/11/2016 |
Dates to Avoid: |
No earlier than 25 March 2016. The OSU coring group will be performing the coring operations and they have a cruise on the Sikuliaq currently scheduled from 3 to 10 March. Also need to avoid an August cruise on the RIDE and a Sept coring cruise on ATLANTIS. |
|
|
|
|
Earliest Start Date: |
3/25/2016 |
Multi-Ship Op: |
No |
Latest Start Date: |
4/14/2016 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
3 |
2 |
1 |
1 |
7 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
|
|
Short Description of Op Area
for use in schedules: |
Shelf break |
Description of Op Area: |
Need to work in approximately 800 meters of water off the shelf break. |
Op Area Size/Dia.: |
|
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Narragansett, RI, USA |
None |
Narragansett, RI, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Richard Trask, WHOI |
# in Science Party |
10 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
|
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
The 9/16" trawl wire will need to be removed from the trawl winch prior to the cruise. |
|