Ship Request

STR Management has moved to MFP

The US Academic Research Fleet is moving to Marine Facilities Planning (MFP) for scheduling initially and eventually cruise planning.

For all NEW or RESUBMITTED Projects/Ship Time Requests, go to https://mfp.us and create a new SME. Some STRs for projects starting in 2022 and beyond have already been moved to Marine Facilities Planning (mfp.us). Check your MFP Science Portal for any projects that might already be moved. If you need to make edits to projects that begin in 2022 and beyond, please contact mfp@unols.org for assistance. Be sure to indicate the Project and STR IDs that you would like to edit. For more information on getting into MFP, see the More Information button below.

  SKII  -  2017  -  Roger Revelle  
  Project Information  
Project Title: SKII Winter Monsoon Water Mass Modification Study Project Status: Submitted
Principal Investigator: Louis St. Laurent, WHOI Project Institution: WHOI
Project ID: 105115 Version #: 1
Date Submitted: 12/24/2015 8:34:00 AM Created By: Louis St. Laurent
Date Last Modified: 3/25/2016 2:20:00 PM URI Serial #: None
Funding Agencies: NAVY/ONR/OAS - NONE - Funded
Summary of Field Work: This ONR sponsored project will study the water mass processes in the Luzon Strait by the combined effects of the Kuroshio Current, eddies, internal waves, and air-sea interactions forced by the winter monsoon.
Summary of Facility Requirements: The vessel must support 24 hour operations. Multibeam and seasoar capability is also required. A large winch, placed on the aft deck, will be used for trip-axis measurements.
Summary of other requirements and comments:  
Ship Request Identification
Type of Request: Primary Ship Use Request Status: Submitted
Request ID: 1008194 Created By: Louis St. Laurent
Date Last Modified: 12/24/2015 8:34:00 AM Date Submitted: 12/24/2015 8:34:00 AM
Requested Ship, Operating Days and Dates
Year: 2017 Ship/Facility: Roger Revelle
Optimum Start Date: 1/15/2017 Dates to Avoid: The winter monsoon period is optimal for the study
 
 
Earliest Start Date: 1/1/2017 Multi-Ship Op: No
Latest Start Date: 2/15/2017 Other Ship(s): The Revelle HDSS sonar is desired for this project.

Operating Days Needed: Science Days Mob Days De-Mob Days Estimated Transit Days Total Days
45 3 3 0 51
Repeating Cruise?
(within same year)
No Interval:   # of Cruises:  

Description of Repeating cruise requirements:
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations:
Work Area for Cruise
Short Description of Op Area
for use in schedules:
Luzon Passage
Description of Op Area: The area of operation includes all of the Luzon Passage zone between Taiwan and the Philippines, roughly in the box bounded by 120 and 123.5 E, 17 to 23 N.
Op Area Size/Dia.: 900
 
  Lat/Long Marsden Grid Navy Op Area
Beginning
Ending
Foreign Clearance and Permitting Requirements
Foreign Clearance Required? Yes Coastal States:

Philippines, Taiwan
 Important Info on Foreign Research Clearances  

Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
No If yes, have you applied for the necessary permits through your export control office? No
 Questions about ITAR/EAR regulations?

Comments about foreign clearance requirements or
description of any other special permitting requirements
(e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.)
Port Calls
Requested Start Port Intermediate Port(s) Requested End Port
Kao-hsiung, Taiwan Kao-hsiung, Taiwan, Kao-hsiung, Taiwan Kao-hsiung, Taiwan
Explanation/justification for requested
ports and dates of intermediate stops
or to list additional port stops
 

 Important Info on Working in Foreign Ports

 
Science Party
Chief Scientist: Louis St. Laurent, WHOI
# in Science Party 25 # of different science teams 1 # Marine Technicians to be
provided by ship operator:
(include in science party total)
2
Explanation of Science Party Requirements and Technician Requirements Each of the 2 cruise legs will involve several Co-PIs and their associated support personnel. Each leg will also require 2 UNOLS technicians to operate the ship's hardware (CTD, ADCP, multibeam).
Instrumentation Requirements That Impact Scheduling Decisions
Selected Dynamic PositioningUnselected ADCPSelected MultibeamUnselected Seismic
Unselected Dredging/Coring/Large Dia. Trawl WireUnselected Stern A-frameUnselected Fiber Optic (.681)Unselected 0.680 Coax Wire
Unselected SCUBA DivingUnselected Radioisotope use - briefly describeUnselected NO Radioisotope use/Natural level workUnselected Other Operator Provided Inst. - Describe
0 PI-Provided Vans - briefly describe Unselected MOCNESS  
Explain Instrumentation or Capability
requirements that could affect choice
of ship in scheduling.

Major Ancillary Facilities (that require coordination of schedules with ship schedule)
Aircraft
Unselected Helicopter Ops (USCG)Unselected Twin OtterUnselected Unmanned Aerial Systems (UAS) 
Autonomous Underwater Vehicle (AUV)
Unselected Other AUVUnselected Sentry  
Coring Facility
Unselected Jumbo Piston CoringUnselected Large Gravity Core Unselected MC800 multicorer w/ MISO camera/telemetryUnselected OSU Coring Facility (MARSSAM)
Unselected Other Large Coring FacilityUnselected WHOI Long Core  
Human Occupied Vehicle (HOV)
Unselected AlvinUnselected Clelia (HBOI)Unselected JSL I & II (HBOI)Unselected Other HOV
Other Facility
Unselected MISO Facility - deep-sea imagingUnselected Other FacilityUnselected Potential Fields Pool Equipment 
Remotely Operated Vehicle (ROV)
Unselected JasonUnselected Other ROV  
Seismic Facility
Unselected Ocean Bottom Seismograph Instrument Center (OBSIC)Unselected Ocean Bottom Seismograph Instrument Pool (OBSIP)Unselected Ocean-Bottom Seismometer Program (UTIG)Unselected Other Seismic/OBS Facility
Unselected PASSCALUnselected Portable MCS groupUnselected Portable MCS/SCS groupUnselected U.S. Geological Survey Ocean Bottom Seismometer Facility (USGS at WHOI)
Towed Underwater Vehicle
Unselected ARGO IIUnselected Hawaii MR1 (HMRG)Unselected IMI12 (HMRG)Unselected IMI120 (HMRG - formerly DSL 120A)
Unselected IMI30 (HMRG)Unselected Other Towed Underwater VehicleUnselected Towfish 
UNOLS Van Pool
Unselected AUV Lab Van #1Unselected Clean Lab VanUnselected Cold Lab VanUnselected General Purpose Lab Van
Unselected Radioisotope Lab VanUnselected Wet Lab Van  
UNOLS Winch Pool
Unselected Mooring SpoolerUnselected Portable WinchUnselected Turn Table 
Explain Major Ancillary Facilities
Requirements and list description
and provider for "other" systems.

Expand request schedules  Associated Schedules

Expand request history Ship Request History