|
Project Title: |
PISTON ( Propagation of Intra-Seasonal Tropical Oscillations ) |
Project Status: |
Submitted |
Principal Investigator: |
Jim N. Moum, OSU_COAS |
Project Institution: |
OSU_COAS |
Project ID: |
105121 |
Version #: |
8 |
Date Submitted: |
1/6/2016 6:03:00 PM |
Created By: |
Jim N. Moum |
Date Last Modified: |
9/5/2017 12:44:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NAVY/ONR - NONE - Funded |
Summary of Field Work: |
Marine meteorology and upper ocean physics measurements in South China, Celebes and/or Philippine Seas |
Summary of Facility Requirements: |
Global Class Vessel with CTD, high-resolution Doppler Sonars, deck space for multiple PI programs, flux mast, |
Summary of other requirements and comments: |
This str is for 3 legs of PISTON leg 1 7d start 15May2018 mooring deployments Ch.Sci Matthew Alford (SIO) leg 2 30d start 15Aug2018 air-sea observations Ch.Sci. Jim Moum (OSU) leg 3 32d start 19September 2018 air-sea observations / mooring recovery Ch.Sci. Jim Moum (OSU) |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1008203 |
Created By: |
Jim N. Moum |
Date Last Modified: |
9/5/2017 12:44:00 PM |
Date Submitted: |
1/6/2016 6:03:00 PM |
|
Year: |
2018
|
Ship/Facility: |
Thomas G. Thompson
|
Optimum Start Date:
|
8/15/2018 |
Dates to Avoid: |
timing to coincide with BSISO Jun-Sep2018 and NASA CAMPEX campaign (Aug/Sep2018 |
|
|
|
|
Earliest Start Date: |
7/15/2018 |
Multi-Ship Op: |
No |
Latest Start Date: |
8/15/2018 |
Other Ship(s): |
coordination with NASA-funded aircraft aerosol experiment |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
69 |
8 |
4 |
6 |
87 |
Repeating Cruise?
(within same year) |
Yes |
Interval: |
4 days |
# of Cruises: |
4 |
|
Description of Repeating cruise requirements: |
We plan 2 back to back 30d legs (legs 2,3) in Aug-Sep 2018 with 4d layover in between for repairs and refurbishment. This critical period encompasses the Boreal Summer Intraseasonal Oscillation (BSISO) north of the Maritime Continent.
Leg 1 is a mooring deployment to precede leg 2 Mooring recovery at end of leg 3 |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
Timing must coincide with BSISO. Timing to coordinate with multinational Year of the Maritime Continent Experiment in 2018 and NASA CAMPEX campaign Aug/Sep 2018 Global Class vessel requested in order to host multiple PI projects on both ocean and atmosphere side of the air-sea interface |
|
Short Description of Op Area
for use in schedules: |
IN02, NP10 |
Description of Op Area: |
eastern SCS |
Op Area Size/Dia.: |
500 nm |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
Yes |
Coastal States:
Philippines |
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
This program is still in planning stages. Timing and approximate location is known. We are presently in the process of getting clearances from Philippine provinces to operate within 12nm. |
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Kao-hsiung, Taiwan |
Manila, Philippines |
Kao-hsiung, Taiwan |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
It is possible we will stage from Kaohsiung, Taiwan with layover in Subic for Filipino outreach exercise. We have been in discussion with UW MarSup about options |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Jim N. Moum, OSU_COAS |
# in Science Party |
24 |
# of different science teams |
8 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
tbd |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
5 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
Vans to house Helium (sounding balloons) and instrumentation. 2-3 on fantail 2-3 on 02 level foredeck
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
TSE winch requested for mooring ops. |
|