LAMP development
-
2018
-
Endeavor
|
|
|
Project Title: |
Development and Field testing of a Lift-Assisted Moored Profiler: LAMP |
Project Status: |
Submitted |
Principal Investigator: |
John M. Toole, WHOI |
Project Institution: |
WHOI |
Project ID: |
105147 |
Version #: |
2 |
Date Submitted: |
2/1/2016 12:06:00 PM |
Created By: |
John M. Toole |
Date Last Modified: |
4/10/2017 10:56:00 AM |
URI Serial #: |
None |
Funding Agencies: |
NSF/OCE/OTIC - 1634736 - Funded |
Summary of Field Work: |
Deploy a tall (4000-m) subsurface mooring SE of Woods Hole for a 6-month trial, then recover and return gear to WHOI |
Summary of Facility Requirements: |
TSE mooring winch, plus the usual deck gear, blocks etc for mooring operations.
full-depth CTD profile capability - occupy up to 5 or so stations at and inshore of the mooring site. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1008238 |
Created By: |
John M. Toole |
Date Last Modified: |
4/10/2017 10:56:00 AM |
Date Submitted: |
2/1/2016 12:06:00 PM |
|
Year: |
2018
|
Ship/Facility: |
Endeavor
|
Optimum Start Date:
|
9/4/2018 |
Dates to Avoid: |
first of two cruises requested to deploy and recover a mooring for a 6-9-month trial |
|
|
|
|
Earliest Start Date: |
9/1/2018 |
Multi-Ship Op: |
No |
Latest Start Date: |
9/20/2018 |
Other Ship(s): |
n.a. |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
2 |
1 |
0 |
2 |
5 |
Repeating Cruise?
(within same year) |
Yes |
Interval: |
6-9-month |
# of Cruises: |
2 |
|
Description of Repeating cruise requirements: |
second of the two cruises requested is for recover of the test mooring. Optimal time for that trip is in May 2019. Same duration as the first. |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
request staging out and into Woods Hole to facilitate loading/unloading of mooring equipment |
|
Short Description of Op Area
for use in schedules: |
NW Atlantic |
Description of Op Area: |
mooring to be deployed for 6-9 month trial at 38° 5' N, 68° 41' W in 4100 m water depth |
Op Area Size/Dia.: |
25 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
41° 30' N
/
70° 39.6' W
map
|
|
|
Ending
|
38° 0' N
/
68° 40.2' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
n.a. |
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Woods Hole, MA, USA |
None |
Woods Hole, MA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Woods Hole is requested to facilitate loading and unloading the mooring equipment. |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
John M. Toole, WHOI |
# in Science Party |
4 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
The science party of 4 individuals, assisted by the shipboard technician and vessel personnel, will deploy and recover the mooring. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
access to 12 kHz hull transducer to communicate with acoustic releases using release deck box units.
We'd like to occupy several full-depth CTD stations at, and insure from the mooring site on both cruises.
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
TSE mooring winch requested for both deployment and recovery cruises |
|