Project Title: |
Turbo-Rankine Power System for Deep Sea Hydrothermal Vents |
Project Status: |
Submitted |
Principal Investigator: |
Jeffrey Breedlove, Creare |
Project Institution: |
Creare |
Project ID: |
105605 |
Version #: |
3 |
Date Submitted: |
1/24/2017 10:28:00 AM |
Created By: |
Jeffrey Breedlove |
Date Last Modified: |
3/19/2019 10:56:00 AM |
URI Serial #: |
None |
Funding Agencies: |
NAVY/ONR - N68335-16-C-0383 - Funded |
Summary of Field Work: |
Bring flow meter from ship deck to seafloor near Virgin vent, inspect previously installed base structure and adjust/refine as necessary, install flow meter to measure flow rate, adjust flow meter restriction valve to assess bypass leakage and refine as necessary, route 70 m cable to OOI secondary node, connect cable to secondary node, deploy camera near Virgin vent, confirm good images are received from OOI, remove flow meter from vent, return flow meter to surface, leave camera in place on seafloor. |
Summary of Facility Requirements: |
Jason ROV |
Summary of other requirements and comments: |
|
|
Type of Request: |
Collaborative Ship Use |
Request Status: |
Submitted |
Request ID: |
1009087 |
Created By: |
Jeffrey Breedlove |
Date Last Modified: |
3/19/2019 10:56:00 AM |
Date Submitted: |
1/24/2017 10:28:00 AM |
|
Year: |
2019
|
Ship/Facility: |
Thomas G. Thompson
|
Optimum Start Date:
|
7/1/2019 |
Dates to Avoid: |
NA |
|
|
|
|
Earliest Start Date: |
6/27/2019 |
Multi-Ship Op: |
No |
Latest Start Date: |
10/1/2019 |
Other Ship(s): |
NA |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
1 |
0 |
0 |
0 |
1 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
NA |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
We would like to join the Cabled Array O&M cruise in 2019. We would also like to use the Jason ROV. |
|
Short Description of Op Area
for use in schedules: |
Axial Seamount |
Description of Op Area: |
"Virgin" hydrothermal vent in Axial Seamount area. |
Op Area Size/Dia.: |
0.1 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
45° 57' N
/
130° 0' W
map
|
|
|
Ending
|
45° 57' N
/
130° 0' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
NONE |
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
Yes |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
NA |
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Seattle, WA, USA |
None |
Seattle, WA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
We would like to join the Cabled Array O&M cruise in 2019. |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Jeffrey Breedlove, Creare |
# in Science Party |
2 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
The science team is Cyle Ziegler from Creare and Dave Dyer from APL UW. We plan to work with the Jason ROV team. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
Jason ROV
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
Jason ROV is needed to transport equipment to seafloor, perform seafloor activities, and return equipment to ship deck. |
|