Zooglider rendezvous
-
2017
-
Sally Ride
|
|
|
Project Title: |
Comparative shipboard and autonomous in situ Zooglider sampling |
Project Status: |
Submitted |
Principal Investigator: |
Mark D. Ohman, SIO |
Project Institution: |
SIO |
Project ID: |
105644 |
Version #: |
1 |
Date Submitted: |
2/7/2017 12:00:00 PM |
Created By: |
Mark D. Ohman |
Date Last Modified: |
2/7/2017 12:00:00 PM |
URI Serial #: |
None |
Funding Agencies: |
INST/UCSD/SIO - NONE - Funded |
Summary of Field Work: |
MOCNESS sampling in vicinity of Zooglider, near the San Diego Trough. EK80 acoustic survey. CTD casts. Surface water pumping. Live zooplankton collections and shipboard incubations. |
Summary of Facility Requirements: |
1-m2, 202-µm MOCNESS, with CTD, fluorometer, dissolved O2, transmissometer. Calibrated EK80. CTD-rosette w/ CTD, fluorometer, dissolved O2, transmissometer. Hydrowire for bongo net. (Science party will supply bongo nets and frame, weight, diaphram pump.) |
Summary of other requirements and comments: |
Continuous shipboard communication with shore-based website required to track zooglider in real time. Zooglider will be launched and recovered independently, from SIO. |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1009150 |
Created By: |
Mark D. Ohman |
Date Last Modified: |
2/7/2017 12:00:00 PM |
Date Submitted: |
2/7/2017 12:00:00 PM |
|
Year: |
2017
|
Ship/Facility: |
Sally Ride
|
Optimum Start Date:
|
3/11/2017 |
Dates to Avoid: |
Timing important, as this is leg 3 of a 3 leg cruise. |
|
|
|
|
Earliest Start Date: |
3/11/2017 |
Multi-Ship Op: |
No |
Latest Start Date: |
3/11/2017 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
2 |
1 |
1 |
0 |
4 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
R/V Sally Ride required as leg 3 of a coordinated 3 leg cruise. |
|
Short Description of Op Area
for use in schedules: |
SD Trough |
Description of Op Area: |
Vicinity of San Diego Trough |
Op Area Size/Dia.: |
10 nm |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
32.916° N
/
117.416° W
map
32° 54.96' N
/
117° 24.96' W
map
|
|
|
Ending
|
32.916° N
/
117.416° W
map
32° 54.96' N
/
117° 24.96' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
San Diego, CA, USA |
None |
San Diego, CA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Will make personnel transfer off Oceanside harbor at beginning of this cruise leg, then end at Marfac in San Diego. |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Mark D. Ohman, SIO |
# in Science Party |
16 |
# of different science teams |
2 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
3 |
Explanation of Science Party Requirements and Technician Requirements |
Ohman lab and Barbeau lab will collaborate. Restech, electronics tech (for MOCNESS), and computer tech required. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
EK80 required, calibrated.
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
Conducting cable for MOCNESS, conducting cable for CTD, hydrowire for bongo. |
|