M3 MARUM
-
2018
-
Roger Revelle
|
|
|
Project Title: |
Sonar monitoring of natural release of methane greenhouse gas from the seafloor - A contribution to the understanding of global change |
Project Status: |
Submitted |
Principal Investigator: |
Deborah S. Kelley, UW |
Project Institution: |
UW |
Project ID: |
105818 |
Version #: |
1 |
Date Submitted: |
7/10/2017 8:24:00 PM |
Created By: |
Deborah S. Kelley |
Date Last Modified: |
7/10/2017 8:24:00 PM |
URI Serial #: |
None |
Funding Agencies: |
OTHER - NONE - Funded |
Summary of Field Work: |
This work will install two multibeam sonars, a camera, and a CTD onto the NSF-OOI Regional Cabled Array in 2018 at Southern Hydrate Ridge. The work will be completed by the Cabled Array team in collaboration with Bremen. |
Summary of Facility Requirements: |
This will be an add-on to the 2019 Cabled Array Operations and Maintenance cruise so will require a global class ship and ROV. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1009415 |
Created By: |
Deborah S. Kelley |
Date Last Modified: |
7/10/2017 8:24:00 PM |
Date Submitted: |
7/10/2017 8:24:00 PM |
|
Year: |
2018
|
Ship/Facility: |
Roger Revelle
|
Optimum Start Date:
|
6/15/2018 |
Dates to Avoid: |
This is a 1-day request so can be added onto the Cabled Array cruise already being scheduled. |
|
|
|
|
Earliest Start Date: |
6/3/2018 |
Multi-Ship Op: |
No |
Latest Start Date: |
8/31/2018 |
Other Ship(s): |
N/A |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
1 |
0 |
0 |
0 |
1 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
N/A |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
N/A |
|
Short Description of Op Area
for use in schedules: |
Oregon Margin |
Description of Op Area: |
Southern Hydrate Ridge |
Op Area Size/Dia.: |
1 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
44.566667° N
/
125.133333° W
map
44° 34.00002' N
/
125° 7.99998' W
map
|
|
|
Ending
|
44.566667° N
/
125.133333° W
map
44° 34.00002' N
/
125° 7.99998' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
N/A |
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Seattle, WA, USA |
Newport, OR, USA |
Seattle, WA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Mobilization of the MARUM equipment will be loaded as part of the Cabled Array gear during one of the three legs. |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Deborah S. Kelley, UW |
# in Science Party |
36 |
# of different science teams |
2 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
3 |
Explanation of Science Party Requirements and Technician Requirements |
There will be at least two representatives from MARUM on the cruise lead by the UW. Three technicians will be needed as part of the normal Cabled Array 24/7 effort. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
None of these capabilities should impact the choice of the ship as this will be driven by Cabled Array requirements.
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
The use of Jason will be required to install and connect the instrumentation to the Cabled Array. |
|