A0A Pressure Axial
-
2019
-
Thomas G. Thompson
|
|
|
Project Title: |
Developing an A-0-A calibrated pressure sensor for the OOI Cabled Array and other applications |
Project Status: |
Submitted |
Principal Investigator: |
William S. Wilcock, UW |
Project Institution: |
UW |
Project ID: |
106040 |
Version #: |
1 |
Date Submitted: |
1/30/2018 1:23:00 PM |
Created By: |
William S. Wilcock |
Date Last Modified: |
8/23/2018 9:01:00 AM |
URI Serial #: |
None |
Funding Agencies: |
NSF/OCE/OTIC - 1829486 - Funded |
Summary of Field Work: |
Deploy in summer 2019, a calibrated pressure sensor that used the A-0-A calibration method on the OOI Cabled Array in the caldera of Axial Seamount and then recover it two years later in summer 2021. The deployment and recovery would each add 1 day to the annual OOI Cabled Array |
Summary of Facility Requirements: |
A global class ship with an ROV configured to work on the OOI Cabled Array |
Summary of other requirements and comments: |
Ship time will be added to the OOI Cabled Array annual maintenance cruises |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1009733 |
Created By: |
William S. Wilcock |
Date Last Modified: |
1/30/2018 1:23:00 PM |
Date Submitted: |
1/30/2018 1:23:00 PM |
|
Year: |
2019
|
Ship/Facility: |
Thomas G. Thompson
|
Optimum Start Date:
|
8/1/2019 |
Dates to Avoid: |
None |
|
|
|
|
Earliest Start Date: |
6/1/2019 |
Multi-Ship Op: |
No |
Latest Start Date: |
8/31/2019 |
Other Ship(s): |
N/A |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
1 |
0 |
0 |
0 |
1 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
N/A |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
N/A |
|
Short Description of Op Area
for use in schedules: |
Axial Seamount |
Description of Op Area: |
Axial Seamount |
Op Area Size/Dia.: |
10 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
N/A |
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Newport, OR, USA |
None |
Newport, OR, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Normal port for the OOI Cabled Array maintenance cruises |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Deborah S. Kelley, UW |
# in Science Party |
1 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
This project would require one berth on the OOI Cabled Array maintenance cruise |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
The ship would be configured as required for the OOI Cabled Array maintenance cruise |
|