OOI Cabled Array
-
2019
-
Thomas G. Thompson
|
|
|
Project Title: |
Management and Operation of the Ocean Observatories Initiative |
Project Status: |
Submitted |
Principal Investigator: |
Deborah S. Kelley, UW |
Project Institution: |
UW |
Project ID: |
106057 |
Version #: |
2 |
Date Submitted: |
2/6/2018 3:35:00 PM |
Created By: |
Deborah S. Kelley |
Date Last Modified: |
12/27/2019 5:04:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NSF-OOI/OOI - NONE - Funded |
Summary of Field Work: |
Maintenance cruise for the NSF-OOI Cabled Array, working at all Cabled Array sites - Oregon Shelf and Offshore, Southern Hydrate Ridge, Slope Base and Axial Seamount. The cruise will consist of turning junction boxes, instruments (~100), moorings and mooring components. |
Summary of Facility Requirements: |
Field work will require global class research ship, the ROV Jason, and OOI winches. CTD water sampling will be required for instrument verification. In general, field work will be similar to past years. Significant deck space required, room for Cabled Array van, EM302. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1009765 |
Created By: |
Deborah S. Kelley |
Date Last Modified: |
12/27/2019 5:04:00 PM |
Date Submitted: |
2/6/2018 3:35:00 PM |
|
Year: |
2019
|
Ship/Facility: |
Thomas G. Thompson
|
Optimum Start Date:
|
7/8/2019 |
Dates to Avoid: |
Early June and September due to weather window. |
|
|
|
|
Earliest Start Date: |
7/1/2019 |
Multi-Ship Op: |
No |
Latest Start Date: |
7/15/2019 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
26 |
4 |
3 |
2 |
35 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
|
|
Short Description of Op Area
for use in schedules: |
OR Margin-Axial |
Description of Op Area: |
At 80 m site off Newport Oregon out to Axial Seamount |
Op Area Size/Dia.: |
250 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
48.633333° N
/
124.3° W
map
48° 37.99998' N
/
124° 18' W
map
|
|
|
Ending
|
45.933333° N
/
129.983333° W
map
45° 55.99998' N
/
129° 58.99998' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Newport, OR, USA |
Newport, OR, USA |
Portland, OR, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Would prefer to avoid 1.5 days to and from Seattle, Newport is where are facility depot is for equipment. Will need at least 3 legs as per past cruises to load/unload equipment and switch out personnel. |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Deborah S. Kelley, UW |
# in Science Party |
36 |
# of different science teams |
3 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
2 |
Explanation of Science Party Requirements and Technician Requirements |
Will include the UW Cabled Array team and Jason team |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
Will need CTD
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
ROV Jason required with industry latching mechanism for transfer of gear to and from the seafloor. |
|