East Coast SAS Surve
-
2019
-
Hugh R. Sharp
|
|
|
Project Title: |
Advanced Sonars FY19 East Coast Data Collection Event |
Project Status: |
Submitted |
Principal Investigator: |
Jim Prater, NSWC PCD |
Project Institution: |
NSWC PCD |
Project ID: |
106504 |
Version #: |
1 |
Date Submitted: |
5/29/2019 2:25:00 PM |
Created By: |
Jim Prater |
Date Last Modified: |
6/13/2019 3:59:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NAVY/ONR - NONE - Funded |
Summary of Field Work: |
This proposal involves the collection of acoustic data in different environments and over a variety of structures along the eastern Atlantic. This acoustic data will be used to feed various ONR programs involving sensor development, signal processing enhancements, vehicle stability and navigation, environmental characterization, and sensor performance estimation. |
Summary of Facility Requirements: |
Facilities to build and maintain REMUS 600 vehicles. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1010491 |
Created By: |
Jim Prater |
Date Last Modified: |
5/29/2019 2:25:00 PM |
Date Submitted: |
5/29/2019 2:25:00 PM |
|
Year: |
2019
|
Ship/Facility: |
Hugh R. Sharp
|
Optimum Start Date:
|
9/3/2019 |
Dates to Avoid: |
Schedule must be confirmed with partners before changes can be made. |
|
|
|
|
Earliest Start Date: |
9/1/2019 |
Multi-Ship Op: |
No |
Latest Start Date: |
9/7/2019 |
Other Ship(s): |
N/A |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
11 |
1 |
1 |
5 |
18 |
Repeating Cruise?
(within same year) |
No |
Interval: |
N/A |
# of Cruises: |
1 |
|
Description of Repeating cruise requirements: |
N/A |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
Requested schedule was created through negotiation/deconfliction with team partners and the RV Sharp schedule. |
|
Short Description of Op Area
for use in schedules: |
Boston and NC |
Description of Op Area: |
Offshore areas with existing anthropogenic clutter. First site is off of Boston in ~200ft, second is off of North Carolina in ~2-300ft. |
Op Area Size/Dia.: |
each approx 10 by 10nmi |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
42° 30' N
/
70° 30' W
map
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
NONE |
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
Yes |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
Survey does not involve international travel, but items and work involved is sensitive in nature. |
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Woods Hole, MA, USA |
Lewes, DE, USA |
Lewes, DE, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Intermediate ports as needed by supporting vessel. |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Jim Prater, NSWC PCD |
# in Science Party |
12 |
# of different science teams |
3 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
Approximately 4 persons per team. 3 sensor teams are involved. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
Multibeam survey of the operational area would be of benefit, but is not required if it is not possible.
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
A Van with facilities to maintain REMUS 600 class systems would be of benefit. |
|