JP2019
-
2019
-
Neil Armstrong
|
|
|
Project Title: |
Student orientation |
Project Status: |
Submitted |
Principal Investigator: |
Glen Gawarkiewicz, WHOI |
Project Institution: |
WHOI |
Project ID: |
106561 |
Version #: |
2 |
Date Submitted: |
8/16/2019 9:57:00 AM |
Created By: |
Mara Freilich |
Date Last Modified: |
12/27/2019 5:15:00 PM |
URI Serial #: |
None |
Funding Agencies: |
INST/WHOI - NONE - Funded |
Summary of Field Work: |
The goal will be to teach new Joint Program students at sea sampling techniques. The science objective is to do a transect out to the shelf break south of Martha's Vineyard to characterize the hydrography and the plankton size structure of the southern New England shelf, including the shelf-break front. After the transect, we hope to do some adaptive sampling of a warm core ring or Gulf stream meander by sampling outside the feature (shelf side), at the edge of the feature, and within the feature. Any extra time will be devoted to along shelf sampling. |
Summary of Facility Requirements: |
The primary sampling will be of water from CTD casts. Samples will be processed in the wet lab and dry lab. A fume hood is preferred for some of the sample processing. We will also be performing net tows during the cruise. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1010582 |
Created By: |
Mara Freilich |
Date Last Modified: |
12/27/2019 5:15:00 PM |
Date Submitted: |
8/16/2019 9:57:00 AM |
|
Year: |
2019
|
Ship/Facility: |
Neil Armstrong
|
Optimum Start Date:
|
9/20/2019 |
Dates to Avoid: |
NA |
|
|
|
|
Earliest Start Date: |
9/20/2019 |
Multi-Ship Op: |
No |
Latest Start Date: |
9/20/2019 |
Other Ship(s): |
NA |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
3 |
0 |
0 |
0 |
3 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
NA |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
NA |
|
Short Description of Op Area
for use in schedules: |
OOI Pioneer |
Description of Op Area: |
Sampling along NES LTER line and near the OOI Pioneer Array |
Op Area Size/Dia.: |
200 km by 20 km |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
41° 30' N
/
70° 45.6' W
map
|
|
|
Ending
|
41° 30' N
/
70° 45.6' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
NONE |
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
NA |
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Woods Hole, MA, USA |
None |
Woods Hole, MA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
NA |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Glen Gawarkiewicz, WHOI |
# in Science Party |
22 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
2 |
Explanation of Science Party Requirements and Technician Requirements |
Two SSGs are required for 24 hour operations |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
Net tows
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
NA |
|