Puget Bubbles
-
2020
-
Rachel Carson
|
|
|
Project Title: |
Bubble Plume Emissions from Fault Zones within the Puget Sound Forearc |
Project Status: |
Submitted |
Principal Investigator: |
Harlan P. Johnson, UW |
Project Institution: |
UW |
Project ID: |
106689 |
Version #: |
1 |
Date Submitted: |
1/3/2020 12:07:00 PM |
Created By: |
Robert Kamphaus |
Date Last Modified: |
1/3/2020 12:07:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NSF/OCE/MGG - 1945975 - Funded NSF/OCE/EAGER - NONE - Funded |
Summary of Field Work: |
Proposal is requesting 4 days of RV CARSON ship time, beginning with a two contiguous days in January 2020 and two additional contiguous days in late March 2020, depending on ship schedules. Project would deploy a small Phantom Remotely Operated Vehicle within Puget Sound during those cruise days. Four additional days would be needed for staging the ROV at the UW campus dock. |
Summary of Facility Requirements: |
Four days of at-sea ship time, in 2 contiguous time blocks. The ROV to be used is a small Phantom vehicle,with rental costs within the PI budget proposal |
Summary of other requirements and comments: |
requires minimum of 7 kilowatt electrical generator with 240 volt at 60 cycle power and a compressed air generator. |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1010786 |
Created By: |
Robert Kamphaus |
Date Last Modified: |
1/3/2020 12:07:00 PM |
Date Submitted: |
1/3/2020 12:07:00 PM |
|
Year: |
2020
|
Ship/Facility: |
Rachel Carson
|
Optimum Start Date:
|
1/2/2020 |
Dates to Avoid: |
no avoidance dates |
|
|
|
|
Earliest Start Date: |
1/1/2020 |
Multi-Ship Op: |
No |
Latest Start Date: |
1/31/2020 |
Other Ship(s): |
no multi-ship operations |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
4 |
2 |
2 |
0 |
8 |
Repeating Cruise?
(within same year) |
Yes |
Interval: |
3 months approximate |
# of Cruises: |
2 |
|
Description of Repeating cruise requirements: |
To allow for sampling of gas emission sites, we are requesting two 2-day cruises, with the first in January 2020, and the second 2-day cruise in March 2020 |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
There are two key operating sites within Puget Sound and the ROV work at each site needs a single day. The second operating days in March is to study the variability of the plume emissions within the tectonic Episodic Tremor and Slip cycle for the Cascadia forearc. |
|
Short Description of Op Area
for use in schedules: |
Puget Sound |
Description of Op Area: |
1. Kingston Arch - near the town of Kingson, WA and 2. Alki Point near Seattle WA. |
Op Area Size/Dia.: |
100 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
48.879° N
/
121.969° W
map
48° 52.74' N
/
121° 58.14' W
map
|
|
|
Ending
|
48° 48' N
/
121° 54' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
None |
None |
None |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Harlan P. Johnson, UW |
# in Science Party |
10 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
2 |
Explanation of Science Party Requirements and Technician Requirements |
Primary operation will be Remotely Operated Vehicle deployments and recovery. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
ROV will be small HD2+2 vehicle, provided by PI. This will need 7 kilowatts of 240 volt 60 cycle electrical power. We will also need a small compressed air generator. We will need 38 khz sonar on the CARSON to be working.
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|