|
OOI Pioneer
-
2021
-
Global
|
|
|
Project Title: |
OOI CGSN Pioneer Array |
Project Status: |
Submitted |
Principal Investigator: |
Al Plueddemann, WHOI |
Project Institution: |
WHOI |
Project ID: |
106795 |
Version #: |
5 |
Date Submitted: |
3/2/2020 3:17:00 PM |
Created By: |
Deidra Emrich |
Date Last Modified: |
2/3/2021 1:57:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NSF-OOI/OOI - NONE - Funded |
Summary of Field Work: |
Pioneer Array servicing of moorings approximately every 6 months through 2023. |
Summary of Facility Requirements: |
Global or Oceans Class vessel with Dynamic Positioning, crane rated to 10,000lbs, A-Frame to 10 tons, 1200 sq ft working deck; 60,000 lbs deck load; 9,000m 9/16" trawl wire, 12 days endurance, experience with mooring operations. |
Summary of other requirements and comments: |
CTD and bathymetry surveys |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1011034 |
Created By: |
Deidra Emrich |
Date Last Modified: |
2/3/2021 1:57:00 PM |
Date Submitted: |
3/2/2020 3:34:00 PM |
|
Year: |
2021
|
Ship/Facility: |
Global
|
Optimum Start Date:
|
9/15/2021 |
Dates to Avoid: |
Mooring servicing in spring and fall, timed for weather and biofouling cycle |
|
|
|
|
Earliest Start Date: |
9/1/2021 |
Multi-Ship Op: |
No |
Latest Start Date: |
9/15/2021 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
20 |
2 |
2 |
0 |
24 |
Repeating Cruise?
(within same year) |
Yes |
Interval: |
6 months |
# of Cruises: |
6 |
|
Description of Repeating cruise requirements: |
Recover, redeploy, refresh power system and sensors every 6 months. |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
Recover, redeploy, refresh power system and sensors every 6 months, address biofouling. Deck payload when deploying and servicing moorings requires a large Global or Oceans Class vessel with Dynamic Positioning. |
|
Short Description of Op Area
for use in schedules: |
NE Shelf |
Description of Op Area: |
Pioneer Array located near 40 degrees N and 070-45 W. |
Op Area Size/Dia.: |
100nm |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Woods Hole, MA, USA |
None |
Woods Hole, MA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Home port of CGSN OOI facility and close proximity to op area. |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Al Plueddemann, WHOI |
# in Science Party |
15 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
2 |
Explanation of Science Party Requirements and Technician Requirements |
Chief Scientist, mooring and glider techs, instrument/system engineers |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
Trawl wire needed to deploy mooring anchors and possible need to drag for moorings
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
Global vessel with Dynamic Positioning, crane rated to 10,000lbs, A-Frame rated to 10 tons, 1200sq ft working deck, 60,000 lbs deck payload, 9,000m 9/16" trawl, 12 days endurance,experience with mooring operations. |
|