Ship Request

STR Management has moved to MFP

The US Academic Research Fleet is moving to Marine Facilities Planning (MFP) for scheduling initially and eventually cruise planning.

For all NEW or RESUBMITTED Projects/Ship Time Requests, go to https://mfp.us and create a new SME. Some STRs for projects starting in 2022 and beyond have already been moved to Marine Facilities Planning (mfp.us). Check your MFP Science Portal for any projects that might already be moved. If you need to make edits to projects that begin in 2022 and beyond, please contact mfp@unols.org for assistance. Be sure to indicate the Project and STR IDs that you would like to edit. For more information on getting into MFP, see the More Information button below.

  W4 OPX - Sally Ride  -  2021  -  Sally Ride  
  Project Information  
Project Title: Phase 2b - Wave 4 - Operational Experiment Project Status: Submitted
Principal Investigator: Thomas Wilcox, GDMS Project Institution: GDMS
Project ID: 106822 Version #: 3
Date Submitted: 5/6/2020 8:58:00 PM Created By: Thomas Wilcox
Date Last Modified: 7/7/2020 6:16:00 PM URI Serial #: None
Funding Agencies: DARPA - N65236-18-C-8009 - Funded
Summary of Field Work: System of systems testing involving air, surface, subsurface assets offshore San Diego. Cruise will include deploying and recovering moorings and floating/drifting assets.
Summary of Facility Requirements: Will need to mob/demob at NMF on Point Loma, expect two days of mob and 1 day of demob.
Summary of other requirements and comments:  
Ship Request Identification
Type of Request: Primary Ship Use Request Status: Submitted
Request ID: 1011069 Created By: Thomas Wilcox
Date Last Modified: 7/7/2020 6:16:00 PM Date Submitted: 5/6/2020 8:58:00 PM
Requested Ship, Operating Days and Dates
Year: 2021 Ship/Facility: Sally Ride
Optimum Start Date: 8/30/2021 Dates to Avoid: Hard to go before 8/6 due to system requiring time for developmental testing, can't go too late due to DARPA contract period of performance.
 
 
Earliest Start Date: 8/16/2021 Multi-Ship Op: No
Latest Start Date: 9/13/2021 Other Ship(s): N/A

Operating Days Needed: Science Days Mob Days De-Mob Days Estimated Transit Days Total Days
15 2 2 1 20
Repeating Cruise?
(within same year)
No Interval:   # of Cruises:  

Description of Repeating cruise requirements: N/A
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations:
N/A
Work Area for Cruise
Short Description of Op Area
for use in schedules:
SOCAL
Description of Op Area: ~160 nm west of Point Loma
Op Area Size/Dia.: 30
 
  Lat/Long Marsden Grid Navy Op Area
Beginning
32.6° N / 120.4° W map
121 map
NP09 map
Ending
32.6° N / 120.4° W map
121 map
NP09 map
  Show Degrees Minutes    
Foreign Clearance and Permitting Requirements
Foreign Clearance Required? No Coastal States:

US EEZ
 Important Info on Foreign Research Clearances  

Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
No If yes, have you applied for the necessary permits through your export control office? No
 Questions about ITAR/EAR regulations?

Comments about foreign clearance requirements or
description of any other special permitting requirements
(e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.)
N/A
Port Calls
Requested Start Port Intermediate Port(s) Requested End Port
San Diego, CA, USA None San Diego, CA, USA
Explanation/justification for requested
ports and dates of intermediate stops
or to list additional port stops
Need to mob/demob at Scripps NMF.

 Important Info on Working in Foreign Ports

 
Science Party
Chief Scientist: Thomas Wilcox, GDMS
# in Science Party 20 # of different science teams 4 # Marine Technicians to be
provided by ship operator:
(include in science party total)
2
Explanation of Science Party Requirements and Technician Requirements We do not need anymore operator provided technicians than the two that come with the charter (1 ResTech and 1 IT Tech).
Instrumentation Requirements That Impact Scheduling Decisions
Selected Dynamic PositioningSelected ADCPSelected MultibeamUnselected Seismic
Unselected Dredging/Coring/Large Dia. Trawl WireSelected Stern A-frameUnselected Fiber Optic (.681)Unselected 0.680 Coax Wire
Unselected SCUBA DivingUnselected Radioisotope use - briefly describeUnselected NO Radioisotope use/Natural level workUnselected Other Operator Provided Inst. - Describe
1 PI-Provided Vans - briefly describe Unselected MOCNESS  
Explain Instrumentation or Capability
requirements that could affect choice
of ship in scheduling.

We will provide a secure operations van but there is no expected impact to ship schedule. We prefer to have dynamic positioning for stability during instrument L&R, ADCP for near surface current data, multibeam or fathometer for water depth measurement prior to mooring deployment and stern A-frame to support instrument L&R.

Major Ancillary Facilities (that require coordination of schedules with ship schedule)
Aircraft
Unselected Helicopter Ops (USCG)Unselected Twin OtterUnselected Unmanned Aerial Systems (UAS) 
Autonomous Underwater Vehicle (AUV)
Unselected Other AUVUnselected Sentry  
Coring Facility
Unselected Jumbo Piston CoringUnselected Large Gravity Core Unselected MC800 multicorer w/ MISO camera/telemetryUnselected OSU Coring Facility (MARSSAM)
Unselected Other Large Coring FacilityUnselected WHOI Long Core  
Human Occupied Vehicle (HOV)
Unselected AlvinUnselected Clelia (HBOI)Unselected JSL I & II (HBOI)Unselected Other HOV
Other Facility
Unselected MISO Facility - deep-sea imagingUnselected Other FacilityUnselected Potential Fields Pool Equipment 
Remotely Operated Vehicle (ROV)
Unselected JasonUnselected Other ROV  
Seismic Facility
Unselected Ocean Bottom Seismograph Instrument Center (OBSIC)Unselected Ocean Bottom Seismograph Instrument Pool (OBSIP)Unselected Ocean-Bottom Seismometer Program (UTIG)Unselected Other Seismic/OBS Facility
Unselected PASSCALUnselected Portable MCS groupUnselected Portable MCS/SCS groupUnselected U.S. Geological Survey Ocean Bottom Seismometer Facility (USGS at WHOI)
Towed Underwater Vehicle
Unselected ARGO IIUnselected Hawaii MR1 (HMRG)Unselected IMI12 (HMRG)Unselected IMI120 (HMRG - formerly DSL 120A)
Unselected IMI30 (HMRG)Unselected Other Towed Underwater VehicleUnselected Towfish 
UNOLS Van Pool
Unselected AUV Lab Van #1Unselected Clean Lab VanUnselected Cold Lab VanUnselected General Purpose Lab Van
Unselected Radioisotope Lab VanUnselected Wet Lab Van  
UNOLS Winch Pool
Selected Mooring SpoolerUnselected Portable WinchUnselected Turn Table 
Explain Major Ancillary Facilities
Requirements and list description
and provider for "other" systems.
N/A

Expand request schedules  Associated Schedules