Project Title: |
Marine atmospheric Boundary Layer (MABL) Sensing and Prediction |
Project Status: |
Submitted |
Principal Investigator: |
Eric Terrill, SIO |
Project Institution: |
SIO |
Project ID: |
106936 |
Version #: |
1 |
Date Submitted: |
8/19/2020 9:20:00 PM |
Created By: |
Lisa Hazard |
Date Last Modified: |
10/15/2021 1:21:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NAVY/ONR - N0001420SB001 / 281152021 - Funded |
Summary of Field Work: |
The proposed work will advance observational techniques for assessing environmental impacts on RF propagation with a particular focus on the role of surface waves, turbulent boundary layers, and the coupling physics that occur at sharp oceanic gradients (e.g. fronts). Novel to this work is the use of unmanned vehicles with specialized payloads, radar systems, and advanced autonomy algorithms in a synthesized framework for collecting adaptive measurements in real-time. |
Summary of Facility Requirements: |
We will need CTD/Rosette and ability to launch autonomous vehicles |
Summary of other requirements and comments: |
|
|
Type of Request: |
Ancillary |
Request Status: |
Submitted |
Request ID: |
1011253 |
Created By: |
Lisa Hazard |
Date Last Modified: |
8/19/2020 9:20:00 PM |
Date Submitted: |
8/19/2020 9:20:00 PM |
|
Year: |
2021
|
Ship/Facility: |
Sally Ride
|
Optimum Start Date:
|
7/1/2021 |
Dates to Avoid: |
Ideally qty. 2 CalCOFI cruises qty. 1 in July, 2021 qty. 1 in September, 2021 |
|
|
|
|
Earliest Start Date: |
7/1/2021 |
Multi-Ship Op: |
No |
Latest Start Date: |
9/1/2021 |
Other Ship(s): |
N/A |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
10 |
0 |
0 |
0 |
10 |
Repeating Cruise?
(within same year) |
Yes |
Interval: |
4 |
# of Cruises: |
2 |
|
Description of Repeating cruise requirements: |
10 ONR days requested on Sally Ride 5 days x 2 cruises. |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
Align with CALCOFI Cruises |
|
Short Description of Op Area
for use in schedules: |
Offshore CA |
Description of Op Area: |
CALCOFI cruise lines/transit to new location |
Op Area Size/Dia.: |
TBD |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
32° 42' N
/
117° 13.8' W
map
|
|
|
Ending
|
32° 42' N
/
117° 13.8' E
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
NONE |
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
Yes |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
As currently planned, no ITAR |
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
San Diego, CA, USA |
None |
San Diego, CA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Ideally, to and from San Diego with the CALCOFI Cruises |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Eric Terrill, SIO |
# in Science Party |
5 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
Deployment of Instrumentation (antenna) for data collection |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
N/A
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
N/A |
|