Ship Request

STR Management has moved to MFP

The US Academic Research Fleet is moving to Marine Facilities Planning (MFP) for scheduling initially and eventually cruise planning.

For all NEW or RESUBMITTED Projects/Ship Time Requests, go to https://mfp.us and create a new SME. Some STRs for projects starting in 2022 and beyond have already been moved to Marine Facilities Planning (mfp.us). Check your MFP Science Portal for any projects that might already be moved. If you need to make edits to projects that begin in 2022 and beyond, please contact mfp@unols.org for assistance. Be sure to indicate the Project and STR IDs that you would like to edit. For more information on getting into MFP, see the More Information button below.

  Fats in the ocean  -  2023  -  Atlantic Explorer  
  Project Information  
Project Title: Production and Fate of Fats in the Upper Ocean. Project Status: Submitted
Principal Investigator: Benjamin Van Mooy, WHOI Project Institution: WHOI
Project ID: 106745 Version #: 2
Date Submitted: 2/9/2020 8:11:00 PM Created By: Benjamin Van Mooy
Date Last Modified: 7/17/2020 9:33:00 PM URI Serial #: None
Funding Agencies: NSF/OCE/CO - 2022597 - Funded
Summary of Field Work: The cruises for this project involve finding coastal phytoplankton blooms and then drifting with them for three days (i.e., Langrangian sampling). We will sample with round-the-clock CTD casts. We will also deploy drifting sediment traps and primary production arrays (stable 13C). Three cruises are requested: Gulf of Maine (Endeavor), Orgeon coast (Oceanus) and Sargasso Sea (Atlantic Explorer).
Summary of Facility Requirements: We will need CTD, A-frame for sediment trap and primary production array deployment, sufficient deck-space for incubators in a location that does not obstruct sunlight.
Summary of other requirements and comments:  
Ship Request Identification
Type of Request: Primary Ship Use Request Status: Submitted
Request ID: 1010909 Created By: Benjamin Van Mooy
Date Last Modified: 2/9/2020 9:10:00 PM Date Submitted: 2/9/2020 8:11:00 PM
Requested Ship, Operating Days and Dates
Year: 2023 Ship/Facility: Atlantic Explorer
Optimum Start Date: 3/1/2023 Dates to Avoid: Needs to be coincident with winter mixing and spring bloom.
 
 
Earliest Start Date: 2/15/2023 Multi-Ship Op: No
Latest Start Date: 3/15/2023 Other Ship(s):

Operating Days Needed: Science Days Mob Days De-Mob Days Estimated Transit Days Total Days
8 1 1 0 10
Repeating Cruise?
(within same year)
No Interval:   # of Cruises:  

Description of Repeating cruise requirements:
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations:
Work Area for Cruise
Short Description of Op Area
for use in schedules:
Sargasso Sea
Description of Op Area: Two 3-day Langrangian stations in location chosen based on satellite data.
Op Area Size/Dia.: 100
 
  Lat/Long Marsden Grid Navy Op Area
Beginning
NA06 map
Ending
NA06 map
Foreign Clearance and Permitting Requirements
Foreign Clearance Required? Yes Coastal States:

Bermuda
 Important Info on Foreign Research Clearances  

Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
No If yes, have you applied for the necessary permits through your export control office? No
 Questions about ITAR/EAR regulations?

Comments about foreign clearance requirements or
description of any other special permitting requirements
(e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.)
Port Calls
Requested Start Port Intermediate Port(s) Requested End Port
St. George's, Bermuda None St. George's, Bermuda
Explanation/justification for requested
ports and dates of intermediate stops
or to list additional port stops
Homeport of R/V Atlantic Explorer

 Important Info on Working in Foreign Ports

 
Science Party
Chief Scientist: Benjamin Van Mooy, WHOI
# in Science Party 14 # of different science teams 1 # Marine Technicians to be
provided by ship operator:
(include in science party total)
2
Explanation of Science Party Requirements and Technician Requirements We will be sampling on a 24-hour schedule, thus two shifts are required.
Instrumentation Requirements That Impact Scheduling Decisions
Unselected Dynamic PositioningUnselected ADCPUnselected MultibeamUnselected Seismic
Unselected Dredging/Coring/Large Dia. Trawl WireUnselected Stern A-frameUnselected Fiber Optic (.681)Unselected 0.680 Coax Wire
Unselected SCUBA DivingUnselected Radioisotope use - briefly describeUnselected NO Radioisotope use/Natural level workUnselected Other Operator Provided Inst. - Describe
0 PI-Provided Vans - briefly describe Unselected MOCNESS  
Explain Instrumentation or Capability
requirements that could affect choice
of ship in scheduling.

CTD, A-frame, on-deck incubators.

Major Ancillary Facilities (that require coordination of schedules with ship schedule)
Aircraft
Unselected Helicopter Ops (USCG)Unselected Twin OtterUnselected Unmanned Aerial Systems (UAS) 
Autonomous Underwater Vehicle (AUV)
Unselected Other AUVUnselected Sentry  
Coring Facility
Unselected Jumbo Piston CoringUnselected Large Gravity Core Unselected MC800 multicorer w/ MISO camera/telemetryUnselected OSU Coring Facility (MARSSAM)
Unselected Other Large Coring FacilityUnselected WHOI Long Core  
Human Occupied Vehicle (HOV)
Unselected AlvinUnselected Clelia (HBOI)Unselected JSL I & II (HBOI)Unselected Other HOV
Other Facility
Unselected MISO Facility - deep-sea imagingUnselected Other FacilityUnselected Potential Fields Pool Equipment 
Remotely Operated Vehicle (ROV)
Unselected JasonUnselected Other ROV  
Seismic Facility
Unselected Ocean Bottom Seismograph Instrument Center (OBSIC)Unselected Ocean Bottom Seismograph Instrument Pool (OBSIP)Unselected Ocean-Bottom Seismometer Program (UTIG)Unselected Other Seismic/OBS Facility
Unselected PASSCALUnselected Portable MCS groupUnselected Portable MCS/SCS groupUnselected U.S. Geological Survey Ocean Bottom Seismometer Facility (USGS at WHOI)
Towed Underwater Vehicle
Unselected ARGO IIUnselected Hawaii MR1 (HMRG)Unselected IMI12 (HMRG)Unselected IMI120 (HMRG - formerly DSL 120A)
Unselected IMI30 (HMRG)Unselected Other Towed Underwater VehicleUnselected Towfish 
UNOLS Van Pool
Unselected AUV Lab Van #1Unselected Clean Lab VanUnselected Cold Lab VanUnselected General Purpose Lab Van
Unselected Radioisotope Lab VanUnselected Wet Lab Van  
UNOLS Winch Pool
Unselected Mooring SpoolerUnselected Portable WinchUnselected Turn Table 
Explain Major Ancillary Facilities
Requirements and list description
and provider for "other" systems.

Expand request schedules  Associated Schedules

Expand request history Ship Request History