|
Project Title: |
Philippine Sea Pilot Study/Engineering Test |
Project Status: |
Submitted |
Principal Investigator: |
James A. Mercer, UW_APL |
Project Institution: |
UW_APL |
Project ID: |
101488 |
Version #: |
7 |
Date Submitted: |
2/13/2008 8:12:00 PM |
Created By: |
James A. Mercer |
Date Last Modified: |
5/7/2008 5:40:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NAVY/ONR - N00014-03-1-0181 - Funded |
Summary of Field Work: |
Suspended acoustic source transmissions, towed source transmissions, deep CTDs, towed CTD chain survey, and XBTs |
Summary of Facility Requirements: |
working A-frame, CTD system, ADCP, dynamic positioning, 100-amp 240-volt 3-phase power, use of hydro boom |
Summary of other requirements and comments: |
working main deck crane and 01level crane |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1001975 |
Created By: |
James A. Mercer |
Date Last Modified: |
5/7/2008 5:40:00 PM |
Date Submitted: |
2/13/2008 9:21:00 PM |
|
Year: |
2009
|
Ship/Facility: |
Melville
|
Optimum Start Date:
|
4/13/2009 |
Dates to Avoid: |
typhoon frequency increases significantly after mid-May |
|
|
|
|
Earliest Start Date: |
4/13/2009 |
Multi-Ship Op: |
Yes |
Latest Start Date: |
|
Other Ship(s): |
Immediately following the Worcester (SIO) cruise, Mercer (UW_APL) will acoustically transmit to the moorings installed by Worcester, Mercer will also transmit to a towed array deployed by Baggeroer (MIT), after this Worcester will recover the moorings |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
18 |
3 |
1 |
3 |
25 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
Mercer's cruise must occur between Worcester's first and second cruises and must be coincident with Baggeroer's cruise |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
The Melville has been used twice before with this equipment. The equipment is very large and the van/winch location is well established. |
|
Short Description of Op Area
for use in schedules: |
Philippine Sea |
Description of Op Area: |
between 21.2 N 126 E and 23.3 N 127.1 E |
Op Area Size/Dia.: |
130 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
21° 12' N
/
126° 0' E
map
|
|
|
Ending
|
21° 12' N
/
126° 0' E
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
Yes |
Coastal States:
Japan |
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Kao-hsiung, Taiwan |
None |
Kao-hsiung, Taiwan |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Will take over Melville when Worcester (SIO) completes his first cruise |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
James A. Mercer, UW_APL |
# in Science Party |
12 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
2 |
Explanation of Science Party Requirements and Technician Requirements |
computer tech and res. tech |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
2 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
CTD, ADCP (necessary for instrumentation location), deck crane for a tow point, two user supplied 20' vans for main deck, use of hydro boom
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|