|
Fish Studies
-
2010
-
Oceanus
|
|
|
Project Title: |
Acoustic Resonance Classification of Swimbladder-bearing Fish at Multiple Scales (Continuation of ONR Grant N00014-04-1-0440) |
Project Status: |
Submitted |
Principal Investigator: |
Tim Stanton, WHOI |
Project Institution: |
WHOI |
Project ID: |
102205 |
Version #: |
1 |
Date Submitted: |
8/21/2009 12:56:00 PM |
Created By: |
Tim Stanton |
Date Last Modified: |
12/9/2009 9:36:00 AM |
URI Serial #: |
None |
Funding Agencies: |
NAVY/ONR - N00014-04-1-0440 - Funded |
Summary of Field Work: |
Conduct acoustic and net surveys over and near Georges Bank. Advanced broadband acoustic systems will be used to classify swimbladder-bearing fish through their resonance. The studies will involve transects and measurements at fixed locations. |
Summary of Facility Requirements: |
We need an Oceanus-size RV for this research. In fact, we specifically request the RV Oceanus since its A-frame is off-center, allowing us to deploy the receive array off the starboard quarter. Also, the two cruises must coincide with the dates of Leg#1 of the NOAA fisheries studies in each of those years. These dates are given elsewhere in this form. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1003289 |
Created By: |
Tim Stanton |
Date Last Modified: |
8/21/2009 12:56:00 PM |
Date Submitted: |
8/21/2009 12:56:00 PM |
|
Year: |
2010
|
Ship/Facility: |
Oceanus
|
Optimum Start Date:
|
9/7/2010 |
Dates to Avoid: |
This cruise must begin on 9/7/10 since it is a multi-ship operation with the FR/V Delaware II. |
|
|
|
|
Earliest Start Date: |
9/7/2010 |
Multi-Ship Op: |
Yes |
Latest Start Date: |
9/7/2010 |
Other Ship(s): |
The research will be in collaboration with the FR/V Delaware II as part of its Leg#1 herring survey that begins on September 7, 2010. |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
11 |
4 |
1 |
1 |
17 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
|
|
Short Description of Op Area
for use in schedules: |
Georges Bank |
Description of Op Area: |
over and near Georges Bank |
Op Area Size/Dia.: |
|
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Woods Hole, MA, USA |
None |
Woods Hole, MA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Tim Stanton, WHOI |
# in Science Party |
10 |
# of different science teams |
2 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
Need winch and A-frame operators. Need technician to operate and log data from ship-board echosounders. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|