Project Title: |
Ocean Current Measurements at Walker Ridge |
Project Status: |
Submitted |
Principal Investigator: |
Jon Wood, ODT |
Project Institution: |
ODT |
Project ID: |
102234 |
Version #: |
1 |
Date Submitted: |
10/13/2009 9:56:00 AM |
Created By: |
Jon Wood |
Date Last Modified: |
10/13/2009 9:56:00 AM |
URI Serial #: |
None |
Funding Agencies: |
OTHER - NONE - Funded |
Summary of Field Work: |
Install two (2) current meter moorings at Walker Ridge 29 block. Systems were installed in January 2009 and serviced in June 2009. We anticipate a service operation about mid-Januray 2010 and agin July 2010. Servcing consists of mooring recovery, data download, battery replacement and re-installation. |
Summary of Facility Requirements: |
We have used the R/V Pelican for this work in the past. No facility requirements will be required, except a forklift to move anchors. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1003365 |
Created By: |
Jon Wood |
Date Last Modified: |
10/13/2009 9:56:00 AM |
Date Submitted: |
10/13/2009 9:56:00 AM |
|
Year: |
2010
|
Ship/Facility: |
Pelican
|
Optimum Start Date:
|
1/6/2010 |
Dates to Avoid: |
|
|
|
|
|
Earliest Start Date: |
1/6/2010 |
Multi-Ship Op: |
No |
Latest Start Date: |
2/15/2010 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
1 |
0 |
0 |
2 |
3 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
We can fit thisd work into any available scheduling windows from Januray 6, 2010 and later. We usually depart the LUMCON pier late in the day (after 2000 hours) and arrive on-location the next day. We will need the remaining day on location, and possible the day after if we experience trouble, then return to the pier overnight to arrive early the following day. We anticipate a vessel charter of less than 48 hours, less than 72 hours if major trouble is experienced. |
|
Short Description of Op Area
for use in schedules: |
Walker Ridge 29 |
Description of Op Area: |
Walker Ridge Block 29 |
Op Area Size/Dia.: |
1 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
26° 54' N
/
90° 30' W
map
|
|
|
Ending
|
26° 54' N
/
90° 30' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Cocodrie, LA, USA |
None |
Cocodrie, LA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Jon Wood, ODT |
# in Science Party |
2 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
Would like to perform a CTD cast once on location (water depth ~1600 m) |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|