Chilean Earthquake
-
2011
-
Melville
|
|
|
Project Title: |
Chilean Earthquake Rupture Survey |
Project Status: |
Submitted |
Principal Investigator: |
C. D. Chadwell, SIO |
Project Institution: |
SIO |
Project ID: |
102587 |
Version #: |
1 |
Date Submitted: |
8/2/2010 6:16:00 PM |
Created By: |
C. D. Chadwell |
Date Last Modified: |
8/17/2010 9:24:00 AM |
URI Serial #: |
None |
Funding Agencies: |
NSF/OCE/MGG - 1035121 - Funded |
Summary of Field Work: |
Recovery of four seafloor pressure recording packages deployed in March 2010 as part of the Chilean Earthquake rupture survey. Units were configured to sample ambient seawater pressure once per minute continuously over the past year. They will be commanded to drop a weight via an acoustic command sent from the surface ship. At each of the four sites the density structure from sea surface to seafloor will be measured by profiling a conductivity, temperature, and pressure device (CTD). |
Summary of Facility Requirements: |
R/V Melville, CTD, computer tech and res tech |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1003953 |
Created By: |
C. D. Chadwell |
Date Last Modified: |
8/2/2010 6:16:00 PM |
Date Submitted: |
8/2/2010 6:16:00 PM |
|
Year: |
2011
|
Ship/Facility: |
Melville
|
Optimum Start Date:
|
3/1/2011 |
Dates to Avoid: |
|
|
|
|
|
Earliest Start Date: |
2/1/2011 |
Multi-Ship Op: |
No |
Latest Start Date: |
3/18/2011 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
6 |
0 |
0 |
0 |
6 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
Depature at 1600 local on day 1 permits loading of gear and science party on day 1, thus no Mob day request. Likewise arrival at 0800 on day 6 permits offloading of gear and sciene party on day 6, thus no Demob day requested. This gives 4 and 2/3 days at sea. First site is within 10 hours transit thus no transit day requested. |
|
Short Description of Op Area
for use in schedules: |
|
Description of Op Area: |
|
Op Area Size/Dia.: |
|
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
|
Foreign Clearance Required? |
Yes |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Bahia de Valparaiso, Chile |
None |
Bahia de Valparaiso, Chile |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
C. D. Chadwell, SIO |
# in Science Party |
4 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
2 |
Explanation of Science Party Requirements and Technician Requirements |
A computer technican is required to initiate and coordinate operation of the CTD.
A resident technician is required to aid with CTD casts and recovery of pressure sensor packages. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|