|
Pulley Ridge Connect
-
2012
-
F. G. Walton Smith
|
|
|
Project Title: |
REPP-Connectivity-Pulley Ridge Connectivity of the Pulley Ridge - South Florida Coral Reef Ecosystem: Processes to Decision-Support Tools |
Project Status: |
Submitted |
Principal Investigator: |
Robert Cowen, OSU_HMSC |
Project Institution: |
RSMAS |
Project ID: |
102714 |
Version #: |
2 |
Date Submitted: |
10/21/2010 7:35:00 AM |
Created By: |
Robert Cowen |
Date Last Modified: |
9/13/2013 11:16:00 AM |
URI Serial #: |
None |
Funding Agencies: |
NOAA - NOAA-NOS-NCCOS-2011-20025 - Funded |
Summary of Field Work: |
Characterization of Deep reef environment in the PUlley Ridge/Dry Tortugas/FL Keys region. Use of ROVs, Technical Divers, Plankton samplers (MOCNESS and Imaging systems), moored instruments. |
Summary of Facility Requirements: |
Require vessel platform capable of extended stay at offshore locations. Support of dive and ROV operations, as well as towed instruments. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1004183 |
Created By: |
Robert Cowen |
Date Last Modified: |
9/13/2013 11:16:00 AM |
Date Submitted: |
10/21/2010 7:35:00 AM |
|
Year: |
2012
|
Ship/Facility: |
F. G. Walton Smith
|
Optimum Start Date:
|
8/5/2012 |
Dates to Avoid: |
need to coordinate wrt lunar period for coral spawning |
|
|
|
|
Earliest Start Date: |
7/31/2012 |
Multi-Ship Op: |
No |
Latest Start Date: |
8/20/2012 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
15 |
0 |
0 |
0 |
15 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
|
|
Short Description of Op Area
for use in schedules: |
South Florida |
Description of Op Area: |
Pulley Ridge - Dry Tortugas - Florida Keys |
Op Area Size/Dia.: |
|
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
25° 18.42' N
/
81° 39.6' W
map
|
|
|
Ending
|
25° 18.42' N
/
81° 39.6' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Miami, FL, USA |
Key West, FL, USA |
Miami, FL, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Science teams/equipment will need to change half way through the cruise |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Robert Cowen, OSU_HMSC |
# in Science Party |
13 |
# of different science teams |
2 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
We will have a full compliment of scientists, divers and ROV techs on board -- though the Diving team will occupy the second half of the cruise, replacing a portion of the ROV group. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
We will be deploying ROVs, and Technical divers (team of 6). We will also be towing (ocassionally) a 1 m2 MOCNESS, and ISIIS.
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
ROV - PHANTOM 2 - FAU/CIOERT ISIIS - UM/RSMAS |
|