Project Title: |
Environmental Sensing and Motion Forecast |
Project Status: |
Submitted |
Principal Investigator: |
Eric Terrill, SIO |
Project Institution: |
SIO |
Project ID: |
103225 |
Version #: |
4 |
Date Submitted: |
2/2/2012 5:12:00 PM |
Created By: |
Erin Hackett |
Date Last Modified: |
10/11/2012 10:07:00 AM |
URI Serial #: |
None |
Funding Agencies: |
NAVY/ONR - NONE - Funded |
Summary of Field Work: |
Test environmental sensing and motion forecast systems. Expected instrumentation: radars, wave buoys, inertial measurement units, recording of ship control system status, anemometers, data acquisition systems. |
Summary of Facility Requirements: |
Melville and a small craft (i.e., RHIB) that can be deployed and retrieved by the Melville during the cruise. The small craft will carry an ultrasonic wave measurement system. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1005080 |
Created By: |
Erin Hackett |
Date Last Modified: |
10/11/2012 10:07:00 AM |
Date Submitted: |
2/2/2012 5:12:00 PM |
|
Year: |
2013
|
Ship/Facility: |
Melville
|
Optimum Start Date:
|
9/4/2013 |
Dates to Avoid: |
Test must be completed before the end of the US Government Fiscal Year (30 Sep 13) |
|
|
|
|
Earliest Start Date: |
8/26/2013 |
Multi-Ship Op: |
No |
Latest Start Date: |
9/15/2013 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
11 |
2 |
1 |
2 |
16 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
This project is focused on predicting the R/V Melville's ship motion based on sensed data. It is critical that we use the R/V Melville as all preparatory work has focused on this ship. Requested schedule (September) is needed due to ONR program requirements. |
|
Short Description of Op Area
for use in schedules: |
San Diego |
Description of Op Area: |
West of San Clemente Island |
Op Area Size/Dia.: |
250 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
San Diego, CA, USA |
San Diego, CA, USA |
San Diego, CA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
After Mob, will deploy for 1-day shakedown of instrumentation, then return to port for one or two days prior to departing for remainder of deployment. |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Eric Terrill, SIO |
# in Science Party |
22 |
# of different science teams |
3 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
2 |
Explanation of Science Party Requirements and Technician Requirements |
There will be three primary groups of researchers, but all will be working on the same research topic.
This project requires the R/V Melville as a scale model and hydrodynamic models have already been built based upon this ship.
The program also requires the shipboard science x-band radar and associated GPS-IMU motion packs.
Science party requires access to vessel for familiarization and walk through dockside during scheduled port call no less than 6 weeks prior to sailing. Preferably at a CONUS location.
A port call is requested 2nd to last day (or crew transfer by small boat) to allow for sponsor demonstrations and VIPs to visit ship and review program. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
3 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
Will need a small craft (i.e., RHIB) that can be delployed and retrieved by Melville. Craft will carry remove wave measuring instrumentation. |
|