|
ONR WAVES
-
2013
-
Melville
|
|
|
Project Title: |
Phased Resolved Measurements of the Air-Sea Interface |
Project Status: |
Submitted |
Principal Investigator: |
Eric Terrill, SIO |
Project Institution: |
SIO |
Project ID: |
103370 |
Version #: |
1 |
Date Submitted: |
4/26/2012 3:44:00 PM |
Created By: |
Eric Terrill |
Date Last Modified: |
9/24/2012 3:17:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NAVY/ONR/OAS - NONE - Funded |
Summary of Field Work: |
Measurements of waves, currents, and atmospheric boundary layer using buoys, drifters, radar, and airborne measurements. |
Summary of Facility Requirements: |
FLIP (3 weeks) and R/V Melville (2 weeks) |
Summary of other requirements and comments: |
Melville required due to science radar and need to operate in SOCAL. Rough weather requires use of vessel of this class. |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1005344 |
Created By: |
Eric Terrill |
Date Last Modified: |
4/26/2012 3:44:00 PM |
Date Submitted: |
4/26/2012 3:44:00 PM |
|
Year: |
2013
|
Ship/Facility: |
Melville
|
Optimum Start Date:
|
8/1/2013 |
Dates to Avoid: |
Late summer required to get mix of south swell and locally generated seas. Mixed wave conditions required for project. Earlier on summer not feasible due to atmospheric visibility issues which impact aircraft operations. |
|
|
|
|
Earliest Start Date: |
8/1/2013 |
Multi-Ship Op: |
Yes |
Latest Start Date: |
11/1/2013 |
Other Ship(s): |
Vessel operations to be coordinated with FLIP and aircraft operations. |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
14 |
0 |
0 |
2 |
16 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
1. Science radar requirement. 2 Vessel has had previous model and full scale hydrodynamic motion studies. 3. Vessel hull form part of Navy study and ESMF program. |
|
Short Description of Op Area
for use in schedules: |
SOCAL |
Description of Op Area: |
Southern California waters |
Op Area Size/Dia.: |
50x50 miles |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
San Diego, CA, USA |
None |
San Diego, CA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Budget limited to local port calls |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Eric Terrill, SIO |
# in Science Party |
6 |
# of different science teams |
2 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
Deck operations, hydrographic sonar, ADCP, met package, vessel motion systems, and intermittent ctd operations. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
1 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
Xband science radar
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
Science party unmanned aerial and underwater vehicle operations may be added with additional funding if ancillary grants funded. |
|